Which methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements?
Agile methodology
Which of the following describes agile methodology
All of the above. Fast and efficient, small and nimble,and lower cost
Which of the following is an issue related to the waterfall methodology
All of the above. Flaws and in accurately defining and articulating the business problem, managing costs resources and time constraints, and assumes users can specify all business requirements in advance
Which of the following is one of the New series of business success factors and challenges that are helping to determine market place winners and losers
All of the above. Organization agility, A focus on core competence and process , And instantaneous of business response
The types of feasibility studies that business analysts can use in managing projects include
All of the above. Political feasibility, operational feasibility, scheduling feasibility
Which of the following is one of the 21st-century's organizational trends on the business side
All of the above. Uncertainty in terms of future business scenarios and economic outlook's, emphasis on project analysis for cost reduction and productivity enhancement, and focus on improved business resilience via the application of enhanced security.
Which of the following is a benefit a business can receive by deploying the latest and security technology
All of the above. You were disruptions to organizational systems, increased productivity of employees, and greater advances in administration.
Which Phase of the SDLC gathers business requirements
Analysis
What is the project deliverable
Any measurable, tangible, verifiable outcome, result, or item that is produced to complete a project or part of a project
Which of the following is not one of the four gates in the rational unified process methodology
Collaboration
Which of the following is a business related consequence of software failure
Decreased productivity, damage to brand reputation, incurred liabilities
Which of the following is a technique for identifying and tracking assets and individuals via technologies such as RFID and smart cards
Electronic tagging
The implementation phase involves taking all of the detailed design documents from the design phase in transforming them into the actual system
FALSE The development phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.
Which consists of a series of tiny projects
Interactive development
Methods for gathering business requirements include
Interview individuals to determine current operations and current issues, survey employees to discover issues, and making observations to determine how current operations are performed
What is the outsourcing option that includes the closest location and direct customer control
Onshore outsourcing
Which of the following represents the phases in the SDLC
Plan, analysis, design, develop, test, implement, maintain
Which methodology used a small teams to produce small pieces of deliverables software using sprints, or 30 day intervals, to achieve an appointed goal
Scrum
Which of the following is not one of the primary principles and organization should follow for successful agile software development
Test and deliver in frequently
Core business relationships and models are dramatically changing, including shifts from which of the following
The value in material things to the value of knowledge and intelligence
Financial savings is one of the reasons why companies outsource
True
Organizational projects have both tangible and intangible benefits
True
Revenue increase is a business related consequence of successful software
True
Software problems are business problems
True
The integration of business and technology enables organizational success
True
Unclear or missing business requirements is the most common reason that systems fail
True
Which of the following are influential drivers affecting the growth of outsourcing markets
all of the above. Core competencies, Industry changes, and rapid growth
Where is the position at IT infrastructure within the organization
bottom
Which of the following is not one of the primary information technology areas on which organizations are focusing
database
What are the three primary variables or triple constraints in any project
time, cost, scope