Blueprints, Lvl II Lesson 6
The Telecommunication Closet #2 IDF located in the conference building has a ? feeding the future direction multi-tap.
a. 0.500 aluminum coaxial cable E5.4
Who is responsible for the installation of the vehicle loop detector system in the garage of the office building?
a. Electrical contractor (EC) EO4.1 (2 of 4)
In the training center second level training rooms, how are the projection screens controlled?
a. Pushbutton switch ET3.2 (2 of 4)
The Telecommunication Closet #2 IDF located in the conference building is the feed from ? closet.
a. TC #1 E5.3
On the main utility (D.L.) pad mount transformer, how many ground rods are required at the transformer pad?
b. 2 e5.2
A ? conduit is used to connect the emergency power supply to Automatic Transfer Switch (ATS) #2?
b. 2" E5.2
A ? is used for a school intercom clock/program sound system
b. Dukane StarCall System E5.3
On Print EO4.1 (1 of 4), what does the square symbol with an F inside and an attached triangle represent?
b. Fire alarm audio/visual signaling device E1.2
What do the note letters NTS on a print indicate?
b. Not to Scale E1.2
The conductor requirements to Telephone Cabinet (TC) #7 from Telephone Cabinet (TC) #1 via an underground conduit is a ? pair phone riser cable.
c. 100 E5.3
How many building management system operator workstations are on this project?
c. 3 E5.2
On the first floor of the training center, how many neutrals are required to run three power circuit home runs?
c. 3 ET3.1 (2 of 4)
The building management system operator workstations are used to control which of the following selections of network control units?
c. I., II., V. E5.2
Which type of wire is used for the paging system speakers?
c. Jacketed 16 AWG 2 conductor shielded CMP rated E5.2
On Print EO4.1 office system, there is a fire alarm with audio visual (AV) devices shown throughout the plan. What cable types are required between these devices?
c. Type B (2 conductors for horn) and Type C (2 conductors for light) E5.3
For the backing for all of the wall mount racks, each telecommunications closet requires that a 3/4 inch non-combustible plywood backboard be installed and painted with two coats of ? .
c. white epoxy E5.4
The training center maintenance office on the first floor is Room Number ? .
d. 131 ET3.1 (1 of 4)
A quantity of ? -12 strand and ? -6 strand multi-mode fiber optic cables run between the office building and the training building.
d. 4 / 1 E5.3
In the training center maintenance office on the first floor, what is the mounting height for the V4000 surface-mount raceway with divider?
d. 54" A.F.F. ET3.1 (2 of 4)
What does a half darkened triangle symbol with the letter A next to it indicate?
d. Communication data/phone/fax outlet E1.2
What room(s) on the second floor of the training center are located directly over the first floor computer lab?
d. Training Rooms 214 and 215 ET2.2 (3 of 4)
