BMIS 373 Exam 1

¡Supera tus tareas y exámenes ahora con Quizwiz!

Describe the sections of a baseline project plan.

1) introduction 2) system description 3) feasibility assessment 4) management

What are the two aspects of planning?

1) project identification and selection 2) project initiation and planning

What is a methodology?

A methodology is a comprehensive, multi-step approach to problem solving

In which phase of the SDLC are the system requirements studied and structured?

Analysis

______ would be classified as software designed to support the payroll function.

Application software

What of the following is NOT a purpose for a baseline project plan? A) Resources are more quantifiable B) Eliminate risks C) Decide if a project should be rejected D) A depository for information collected during initiation

B) Eliminate risks

what is the term that describes the best estimate of a project's scope, benefits, cost, and resources?

Baseline project plan

Why is PIP challenging?

Because it turns a vague system request into a project description

______ were developed to make systems developer's work easier and more consistent

CASE tools

What is application software?

Computer software that is applied for a specific purpose

Which of the following is NOT a part of the project management process? A) Planning B) Initiating C) Executing D) Adjoining

D) Adjoining

Which of the following is NOT a feature of PERT? A) Uses optimistic estimate B) Uses pessimistic estimate C) Uses realistic estimate D) Calculates budget for a project

D) calculates budget for a project

Describe the PERT technique

ET = O + P + 4R / 6

List the types of project feasibilities

Economic, Technical, Operational, Scheduling, Legal, Political

T/F: New versions or releases of software with associated updates to documentation, training, and support are not part of the maintenance phase.

False

A ____________, which is conducted by the project manager involves determining if the information system makes sense for the organization from an economic and operational standpoint.

Feasibility study

In which phase of the SDLC is the information system coded, tested, installed, and supported in the organization?

Implementation

What is the final activity in the project identification and selection process?

Implementing the IS project

What are the phases of the project management process?

Initiation, planning, execution, closedown

What is activity sequencing?

Involves identifying and documenting the relationships between project activities.

What are the 3 IT project objectives?

On time, on budget, full functionality

A critical path refers to a sequence of task activities whose ______ and _______ directly affect the completion date of a project.

Order, duration

Logical design

all functional features of the system chosen for development in analysis are described independently of any computer platform

A _____________ is an end product of a SDLC phase.

deliverable

A Gantt chart is the graphical representation of a project that shows each task as a _________ bar whose length is proportional to its time for completion.

horizontal

What is the fourth phase in the SDLC?

implementation

Phases of the SDLC

planning, analysis, design, implementation, maintenance

Physical design

the logical specifications of the system from logical design are transformed into the technology-specific details from which all programming and system construction can be accomplished

What is the difference between tangible benefits and intangible?

Tangible benefits can be measured (ex: hardware, labor) Intangible benefits cannot (ex: goodwill, morale)

What is total slack?

The amount of time a task can be delayed without delaying the completion of the project

What does PERT stand for?

Program Evaluation and Review Technique

___________ is a controlled process of initiating, planning, executing, and closing down a project.

Project management

What is the next step taken after project initiation?

Project planning

What are the 5 P's?

Proper Planning Prevents Poor Performance

Who has the primary responsibility for the design and analysis of information systems?

Systems analyst

What is the critical path?

The shortest time in which a project can be completed.

T/F: the part of the design process that is independent of any specific hardware or software platform is referred to as logical design.

True

What makes all projects feasible?

Unlimited resource and infinite time


Conjuntos de estudio relacionados

The Legal and Social Environment Quizzes 17,18,19,22,23

View Set

Accounting 2 Chapter 12 true/false

View Set

Transducers (Chapter 3--Physics)

View Set

Chapter 23: Acids, Bases, and Salts

View Set