(Ch.23) Facility Design, Layout, and Organization

¡Supera tus tareas y exámenes ahora con Quizwiz!

if you performing the back squat or standing shoulder press exercise in a rack using a 7 foot olympic bar how many square feet is needed

130 square feet

when performing the power clean exercise in the olympic lifting area, how many square feet is needed

144 square feet

how many fans for every 1,200 sq. feet

2-4

How many sq. feet for bikes and stair machines

24

circuit training machines should be at least ___________inches preferably _______ inches away from each other

24 in 36 in

Barbells and dumbbells should have a minimum of _________ inches of space between other barbells and dumbbells

36

main walkways should be at least ________ inches wide

36

weight trees that are placed near plate loaded equipment should have _______ inches of seperation

36

How many sq. feet for rowers

40

how many square feet needed if you are using a 4 foot curl bar for the biceps curl exercise

40 square feet

How many sq. feet for treadmills

45

how many sq. feet should the dynamic warmup area be?

49

the sound in the facility should not exceed ________ decibels

90

how many square feet needed if you are using a 6 foot long weight bench for the bench press exercise

90 square feet

A master plan should be created in which of the following phases? A. predesign phase B. design phase C. construction phase D. preoperation phase

A. predesign phase

how should mirrors be placed within the facility

at least 6 inches away from any equipment and a minimum of 20 inches above the floor

Racks and platforms should be placed between how many feet apart

between 3 & 4 feet (should be bolted to floor)

supervision in a strength and conditioning facility should be located where

centrally on ground floor

how many times should the air be exchanged per hour to prevent odors

8-12

how tall should the ceilings be

12 to 14 feet from low hanging items

How many square feet per participants should a facility be?

100 sq. feet per participant

How should a ramp run for wheelchair access

12 inches for every 1 inch rise

how many lumens should the lights be

50-100 lumens (should have artificial and natural lighting)

what should the relative humidity not exceed

60%

what temperature should the facility be set at

68-78 deg. Fahrenheit (optimal temperature = 72-78)

What is the recommended minimum distance between the floor and the bottom of mirrors on the walls? A. 16 inches B. 18 inches C. 20 inches D. 22 inches

C. 20 inches

What is the minimum recommended space between the ends of the racks to provide room for spotters? A. 1 foot (30 cm) B. 2 feet (61 cm) C. 3 feet (91 cm) D. 4 feet (123 cm)

C. 3 feet (91 cm)

This phase is from the beginning of construction to end -usually the longest phase

Construction phase (50% of total project time ~12 months)

Which of the following is NOT a key consideration when determining the space requirements of a college strength and conditioning facility? A. accessibility for the athletes B. amount and type of equipment C. number of athletes using the facility D. number of athletic teams desiring to use the facility

D. number of athletic teams desiring to use the facility

What is the order of the four phases involved in designing a new strength and conditioning facility? A. construction, predesign, design, preoperation B. preoperation, design, construction, predesign C. predesign, construction, design D. predesign, design, construction, preoperation

D. predesign, design, construction, preoperation

This phase is where you work with architect to finalize blueprints, include equipment specifications, spacing is designed to be user friendly, facility is designed to provide easy access to all athletes. Finalizing the design committee

Design phase

This is the second step in building a new facility

Design phase (10-12% of total project time ~3months)

This is the final steps before facility opens -finishing interior design -hiring qualified staff -plan for staff development

Pre-operation or Start up phase (15% of total project time ~3-4 months)

what phase includes creating a needs analysis, feasibility study, and master plan formation

Predesign phase

What is the first step in building a new facility

Predesign phase (25% of project time ~6months)

ideally, weightlifting platforms should have a middle portion made of _________ and outer sections made of ___________.

Wood Rubber

this is done to determine costs, facility location, program interests. This should analyze strengths, weaknesses, opportunities, and threats (SWOT analysis) Goal of this is to ensure that the financial investment will yield a viable and sustainable return

feasibility study

which phase is hiring an architect important

predesign

what type of flooring is good for ground-based movements and sled pushes

turf


Conjuntos de estudio relacionados

ATI Pharmacology Practice Test A (2019)

View Set

Chapter 14 Test Review- World History

View Set

Paralegal Civil Service Exam Study Guide

View Set

Combo with "Chapter 13" and 2 others

View Set

Chapter 18: Civil Liberties Questions

View Set

Accounting Ch 9, 10, 11, 12 Review

View Set