CM 1011 Donald LSU

¡Supera tus tareas y exámenes ahora con Quizwiz!

animation without a purpose is a distraction

true

your eyes are magical

true

In agency CM, the construction manager is at risk

false

tables are easy to read so use them

false

team activities do not include communications guidelines

false

the owner's name and address is not something to include in an advertisement of a project

false

the purchasing of construction services is often refereed to as a procurement

false

there is very little demand for construction workers

false

value engineering's goal is to reduce the costs of construction as much as possible

false

very few contractors subscribe to some type of electronic construction news service

false

very seldom does a contractor have to compete for its work

false

The three basic building materials associated with commercial building are steel, concrete, and glass

true

avoid wordiness

true

conceptual estimating through the design process can ensure that the completed design is in line with the owner's budget

true

constructability is the predominant reason that owners have opted to use the design-build delivery method

true

cost-plus-fee contracts are also known as time and materials

true

key performance indicators formulate plans for improvement

true

location impacts the availability and cost of labor

true

pre task safety analysis is sometimes called a toolbox meeting

true

quantifying the materials, labor, and project overhead needed is called a quantity takeoff

true

the ability to make a request that results in actions is at the heart of effective communication

true

the building materials used in residential construction are typically wood products such as lumber and plywood

true

the decision to bid may be tempered by who the architect is

true

the determination of quantities and the computation of prices are the two major components of an estimate

true

the different project delivery methods is designed around price, qualifications, or a combination of both

true

the price of an object using unit-price is the unit-price times the quantity of the object

true

the value of a project to the owner is the benefit received by the owner compared to the owner's cost of the project

true

a project manual has two primary sections: the drawings and the specifications

false

concrete is measured in square feet

false

controlling project performance has two key components: quality and safety

false

providing bonds on public projects is voluntary for the contractors

false

qualifications-based selection is usually based on low bid

false

quantity surveying represents more of the art of estimating

false

safety is not one of the six dials of project value

false

saftey training does not require buy-in from the trainees

false

sales is not a phase of a construction project according to our presenter

false

schedules are not used by Palmisano as communication tools

false

the first step in the process of getting work is to determine who is preparing to build new projects and when they will be ready to start

true

estimators are not risk takers

false

it is the owner who decides which project delivery method will be used

true

there are nearly 800,000 private construction companies in the U.S. employing nearly 6.7 million people, or on average of just over eight employees per company

true

when the work plan does not work, stop and re-plan

true

you get your ethics from values and principles

true

Lean results in more completions under budget

True

"Draw first, and talk second" is a good pre-design constructability conversation

false

"Ethics only has to do with my religious beliefs"

false

A CM is expected to be an expert in all facets of the construction

false

A fundamental cost goal is to maintain costs at or above budget parameters

false

An ethical issue can be decided by doing a survey

false

BIM managers do not develop ways to enhance the client / contractor relationship on projects

false

Being ethical is the same as following the law

false

Bullet points area always effective as a presentation format

false

CAD stands for calculated assisted drawings

false

Collaboration and integration are the same thing

false

Construction projects almost always use the same teams as on prior successful projects

false

Continuous improvement is not one of the six tenets of Lean

false

Copyright is an ethical issue

false

Create waste is one of the six tenets of Lean

false

Design-build is commonly referred to as the traditional delivery method

false

Ethical decisions are always black and white

false

Ethics can't be taught

false

It was president Kennedy who said: "apply the seat of the part to the seat of the chair."

false

Lean uses a First Planner System

false

Lean uses a small room planning concept

false

Less than 25% of construction work is "wasted"

false

Most projects have no cost overruns, time delays, or conflicts

false

On a slide, you should always have a minimum of five lines of text

false

Only 20% of construction projects are delivered late

false

Only the estimators have to be familiar with the estimating process

false

Palmisano does not use drones

false

Palmisano does not use job box

false

Palmisano does not use stickies in the pull planning done in the field

false

Palmisano has completed over 1000 projects

false

Palmisano self-performs steel erection

false

Palmisano was founded in 1983

false

Palmisano's communication platforms do not tie back to mobile devices

false

Pre-construction services do not include conceptual estimates

false

R.S. means information does not include data such as crew size

false

Smart roads is a program not connected to the internet

false

Spreadsheets and manual takeoffs are not common in estimating

false

Superintendents work mainly in the home office

false

The Automated Retrieval System shown was a lion

false

The CSI master format specifications group is divided into 16 subgroups

false

The construction management functions are typically performed by separate construction managers

false

The construction specification institute (CSI) was founded in 1908

false

The contractor establishes the parameters for the design of the project

false

The main assertion of a slide should always be in the bottom left corner of a the slide

false

The mentor program is not one of the ways to get involved with the CIAC

false

The order to follow when writing is drafting, prewriting, and polishing

false

The survey found no discrepancy between the value people place on ethics and what they actually do in practice to support their values

false

There are two types of integrity: nationwide and local

false

There is very little demand for constriction workers

false

Unfortunately, a more dangerous work environment is one of the results of Lean

false

Unit-price contracts are used when the work to be performed has accurately measured work ahead of time

false

a constructability review during the pre-construction phase is only about the construction and economics of the project

false

a constructability review should be done by the project manager and the designer

false

a construction team does not need diversity

false

a copy of the contract agreement form is unnecessary in the project manual

false

a feasibility is easily within a contractor's usual scope of service

false

a personal code of ethics starts once a child has left his or her parents

false

a site visit during the bid period is not necessary

false

accountability is unimportant in successful team building

false

an ethics program does not start with upper management

false

an execution plan works better without the involvement of the personnel working under it

false

appreciation and recognition is the same as acknowledgement

false

architectural drawings make up the smallest portion of the construction drawings

false

awarding the contract is always done at the bid opening

false

building trust can be quite quickly

false

keeping score is unnecessary in comparing performance against goals

false

linear takeoffs involve how many of a certain object

false

lump-sum contracts are the least common type of contract

false

pre-construction services include close-out reports

false

pre-construction services include giving the owner warranty information

false

project managers do not provide safety leadership

false

project managers work exclusively on the jobsite

false

the company does not need to have a feedback loop for the work force

false

the estimating function is one of the lesser important functions in the bid process

false

the larger the project, the less opportunity there is to increase efficiencies around any particular activity

false

the owner (client) should not be a member of the team

false

"PPP" stands for public-private partnership

true

"Standardize" is one of the 5 S's

true

"There is never a right way to do the wrong thing"

true

"by failing to prepare, you are preparing to fail"

true

"it is the will to prepare to win that separates success from failure"

true

"quality is meeting the acceptance criteria 100% of the time

true

A 6 week look ahead system uses bi-weekly meetings

true

A construction company needs to have a formal ethical program in place that is enforced

true

A manufacturing plant is an example of an industrial construction project

true

AIA General Conditions are standard provisions affecting all building construction projects

true

Approximately 54% of construction activities planned for a given week get done

true

BIM coordination is an example of the typical pre-construction activities

true

BIM improves collaboration and customer experiences

true

BIM is a common estimating option

true

BIM managers lead the efforts to coordinate projects construction on modeling software

true

Bid documents include an advertisement or invitation for bids

true

Black text on a white background always works

true

Cite whenever it isn't your original work, including graphics

true

Collaboration of communication and activities is part of a Lean project delivery

true

Construction jobsites use drones

true

Construction managers should be flexible and work effectively in fast-paced environment

true

Design-bid-build is linear in nature

true

Dont be defensive in the Q and A

true

Ethics are the moral standards used by people in making personal and business decisions

true

Ethics may include the virtues of loyalty, honesty, and responsibility

true

Everyone in a group should review every part of a report

true

Hiring the right people can facilitate an ethics program

true

In at-risk CM, the construction manager does the work of a general contractor in the construction phase

true

In the integrated project delivery method, the construction manager will have an opportunity to contribute expertise relative to constructability

true

Job-specific overhead (or project overhead or general conditions) include the superintendent's pay

true

Lean is defined as "a culture of respect and continuous improvement aimed at creating more value for the customer while identifying and eliminating waste

true

Lean project delivery results in minimizing waste and rework

true

Lean thinking demands a mindset of continuous improvement

true

One of the constructor's jobs is to determine and implement best construction practices, means, and methods to satisfy the owner's requirements for time, cost, and quality

true

One of the things the owner is accountable for is creating the overall budget for the project

true

Palmisano self-performs concrete

true

Palmisano uses BIM

true

Palmisano uses Bluebeam for as built drawings

true

Palmisano uses procore for project management

true

Palmisano uses technology to solve communication and documentation challenges

true

Teams activities include identification of who has what responsibilities

true

The CSI master format utilizes a six-digit numbering system

true

The construction industry in the United States employs more than 7 million people directly, and many more indirectly

true

The corporate culture of a company is usually set by management

true

The design-build delivery method better manages risks, generate greater value, and eliminates waste

true

The ideal construction management candidate is typically an individual who has a bachelor's degree in construction management

true

The project manager is responsible for the safe completion if projects within budget, on schedule, to the company's quality standards, and to the customer's satisfaction

true

The site and infrastructure subgroup of the CSA master format relates to work that takes place before the construction work takes place

true

There is a very high value put on training of construction workers

true

To earn the LSU Distinguished Communications Award a student must take at least four communications intensive courses

true

Waiting is one of the 8 types of waste

true

Waste is downtime

true

When presenting, you should stand straight and face the audience

true

a complete project team would include material and equipment vendors

true

a contractor's estimate is the contractor's cost to do a project

true

a formal ethics program can help minimize risk, among other things

true

a plan view is a horizontal "cut" through the entire building

true

amination should only be used for effect

true

an effective manager will show appreciation on a regular basis, even for things expected on the team member

true

an estimate is a summary of the costs of the contractor for a particular project

true

an estimate is built very much in the same order as the actual building of the facility

true

an estimator must be able to build the project mentally before pricing it

true

an ethics policy must be clear and concise

true

building trust is easier with people with whom you have history and experience

true

civil drawings include things such as grading, demolition, excavation, and site utilities

true

communication and collaboration are core to being a successful manager of diverse project teams

true

effective managers know that acknowledgment is a key to motivating their project teams

true

estimator develop the construction budget once the project is awarded

true

estimators develop the construction budget once project is awarded

true

ethics apply to the behavior of an atheist as to that of a saint

true

every project is a one-of-a-kind facility

true

execution comes before close-out

true

feelings frequently from what is ethical

true

getting construction work requires abilities such as negotiation, presentation, team-building, and communication skills

true

market conditions may impact bid amounts

true

marketing efforts is focused on convincing owners that they should bring the CM team on board early

true

superintendents plan the execution of the project including all subcontractors and craft workforce

true

supplemental conditions are project specific

true

a square foot takeoff involves an area

true

low-bid selection results in contractors evaluating the plans and specs and coming up with a bid price based on their own unique strategies for doing the work

true

math mistakes can cause an estimate to be incorrect

true

most construction project teams are temporary organizations

true

pre-construction services include feasibility studies

true

pre-construction services include value engineering

true

pre-construction services should be upfront and involve the owner, designer, and contractor

true

private projects usually use the closed bid system

true

productivity is the number of units a crew can install in a given time period

true

project managers are the direct liaison between the contractor and the clients and design teams

true

quality is monitored by the specifications, punch lists, inspections, tents, and user surveys

true

quantifying labor deals with productivity rates

true

retention of good workers is important in building a good work force

true

superintendants provide safety leadership

true

teamwork and trust are really the keys to successful project delivery

true

the complexity of the project impacts productivity

true

"PDCA" stands for plan, do, check, adjust

false

a general contractor keeps a project running in accordance with contract documents developed by the contractor

false

electrical drawings only shows the electrical receptacles and switches

false

estimating software basically will guarantee that you will get a competitively bid project

false

estimators do not coordinate with subcontractors and vendors for pricing

false

in a traditional design-bid-build delivery method, qualification is used to determine who wins the project

false

in model estimating the estimator bids assemblies

false

shape does not impact the price of all elements of the building

false

the specifications basically define the quantity of the work: the length, the width, the area, the volume, and so on

false

there is now less safety supervision over construction workers than in years past

false

Low- bid selection results in contractors evaluating the plans and specs and coming up with a bid price based on their own unique strategies for doing the work

true

Mechanical drawings include plumbing, heating, and ventilation

true

Office overhead (general overhead) are costs incurred by a contractor whether or not it has projects

true

Plagiarism is a legal issue

true

Planning is about organizing the activities that have to take place in a logical sequence

true

Pre-construction services should begin during the design phase

true

Primavera 6 is a scheduling program used by Palmisano

true

Progress and construction go hand in hand

true

Respondents to the survey cited over-billing as common in the construction industry

true

a good boss is someone who cares about the team members, coaches them, listens to their ideas, and acknowledges them and their contributions

true

a powerful request will include a "by when" date

true

a project comparison estimate compares the estimates of a completed project to the proposed project

true

a team should measure it performance against its goals

true

according to the lean construction institute, reliable promising reduces rework, defects, and waste

true

admitting you have made a mistake can lead to enhancing trust

true

one of the characteristics common among estimators is organization skills

true

only accept a committed response to a request

true

polishing is made up of revising and editing

true

"plans are worthless, but planning is everything" was a quote of Teddy Roosevelt

false

it is relatively unimportant for a contractor to find opportunities to submit proposals and negotiate to win projects

false

a parametric estimate uses equations that express the statistical relationship between building parameters and the cost of building

true

action language gets people moving, and creates reliable accountability through language

true

after a conceptual estimate is made, the challenge for the designers is to design the allocated budget

true

direct and indirect labor are two of the costs to consider when preparing an estimate

true

heavy civil contractors make huge investments in equipment

true

historic construction is one of Palmisano's core markets

true

is most public projects, the open bid process must be used

true

it is important that all subcontractors receive the same information needed to prepare a subcontract bid

true

the goals of a construction team includes safety

true

the rhetorical triangle consists of audience, message, and credibility

true

sharing why a project is important from a human perspective is unnecessary

false

allow yourself to have a lousy first draft

true

the most basic CM skill necessary is the ability to read construction drawings

true


Conjuntos de estudio relacionados

Food Handler Training - Riverside, CA Final Exam

View Set

Exam #1 Quiz Questions and Answers

View Set

EMT - Chapter 37 - Transport Operations

View Set

urinary questions and short answer

View Set

Abnormal Psych: Anxiety Questions

View Set

"Who Am I This Time?" Study sheet for Harry Nash

View Set

Leadership Chapter 9, Leadership Chapter 12, Leadership Chapter 13, Leadership Chapter 10

View Set