How submits the contract for design bid build?

Architect

Who administers the contract for CM@Risk?

Architect

Who administers the contract for design build?

Architect

who is in charge of the bidding and aware stage?

Architects coordinates bid package

what is the project feasibility stage?

Assess desirability and cost, project goals, intial budget, schedule, project site analysis

What is equipment management in logstics?

Availability and readiness of equipment, overseeing trasnportation, maintence, rental needs

What are the site organization essentials?

Boundaries, access and egress, material storage,facilites location, waste management zones

What should be considered when choosing a delivery method?

Budget, design, risks, schedule, owner expertise

Owners in house organizational chart?

CEO, vice president of facilities, facilities project manager, security manager, owners project manager, building controls engineer

Characteristics of CM@ risk?

Cm works in owners interest, fast tracked, competitive bidding, GC is hired with CM, used with large complex projects

What is information flow in logistics?

Communication systems for all stakeholders, tracking deliveries, inventory levels, schedule updates

Characteristics of design bid build?

Competitive Bid, Cost known, no fast track, not suitable with change, GC hired after desing, public projects

what is the close out and occupancy stage?

Complete all requirements of the construciton contract, completion of contract terms and final payment

What is the construction project stage?

Complete, physcial work safely and on time and on budget, quality work, substantial completion

what is topography?

Considerations like drainage, machine placement, site access points

Who administers the contract for Agency Cm?

Construction Manager

who is responsible for the close out and occupancy?

Contractor

who is responsible for the preconstruction and mobilization stage?

Contractor

who is responsible for the construction project phase?

Contractor, means and methods

What is material delivery in logstics?

Coordinating with suppliers and trasnport services, minimizing delays

What is the design development design?

Finalizing the design including interior, systems consulting, oultine specification, elevations, reflected ceiling plans, interior schedules, key details, systems consultants drawings, revised cost estimate

Characteristics of Design Build?

Good communication between C and A, flexible, fast tracked, owner can be absent, no price up front, specialized projects, GC and A/E hired at same time

What is the Project managers role?

On site representative, manage actual construction, run day to day activites, planning and scheduling, budget and cost control, trade contractor contracts, labor relations, getting permits, community relations, daily issues, weekly meetings

What is the preconstruction and mobilization stage?

Organize construction, move on site, jobsite layout plan

Who is involved in Cm Agency?

Owner > CM Architect and Prime Contractors

Who is involved in CM @ risk?

Owner > CM and A/E

Who is involved in the design bid build method?

Owner > GC and A/E

What is the hierarchy of an ORG chart for construction?

Owner > architect and Contractor. Architect >engineers >interior designers. Contractor >Subs

Who is involded in Design build?

Owner> Design builder > A/E

What is a conceptual design?

Programming consists of establishing and documenting requirements for the project including design objectives, desired rooms, room sizes, relationships between spaces and relationships to sites (budget analysis, schedule development, code analysis, site analysis and selection

Who is on the Cm team?

Project Executive, Porject manager, Project Super, Project engineer

What are the project stages?

Project feasability, progamming and design, bidding and aware of contract, preconstruction and mobilization, construction, close out and occupancy

What is the schematic design?

Site plans, floor plans, key elevations, key sections, area analysis, renderings or model, preliminary cost.

What are some site layout considerations?

Topography, weather factors, sequential operations, mobile equipment movement, storage and staging, pedestrian flow, proximity to suppliers, noise and dust control

what is the project engineers role?

can be in office or in the field, review contract documents for completedness and cosntructability, review and submit all samples and shop drawings, coordinating flor of information, processing project schedule

What is labor and personnel in logsitics?

coordinated schedules ensuring the right personnel at the right time

what are some CM Pre-con services in design phase?

cost estimating, value engineering, life cycle cost analysis, master schedule, constructability, document coordination, site investigation, local officials, local practices, desing reviews, project cost, purchasing plan

What is access and egress?

deciding on pirmary and secondary points for logsitics and emergences. Unobstructed routes suitable for heavy machines

What is the programming and design project stage?

define specific project requirements, identify program requirements, updated estimates and schedule

What is storage management in logsitics?

designed storage ensuring easy access and protection from the elements, avoid waste

What is the purpose of an org chart?

developing workforce, budgeting, better communication, defining roles

Characteristics of CM Agency?

fast tracked, compettive bidding, sophisitcated owner, , no fixed price, large and complex projects, CM administers contracts

how to make an org chart?

identify objectives, specify work activities, classify each work activity, assign each activity to the appropriate role, determine the appropriate decision making

how is the hierarchy of a org chart made?

leadership direction based off of job identification, functions, reporting structure

why do org charts matter?

objectives, structure, accountability

who is responsible for programming and design?

owner takes the lead with the architect

Construction project team Organizational chart?

owner, OPM, architect, General Contractor, strutural design consultant, strutural steel contractor, suppliers

Architect organiziational chart?

principle in charge, project architect, senior designer, draftsman, Jr. Designer

Construction management company org chart?

project engineer, vice presidents, scheduler, senior estimator, safety director, project manager, general super, MEP super, project executive, intern

What is the project supers role?

responsible for supervising the physical construction of the project, understanding contract drawings and specs, prefomr monthly project scheudle updates, daily reports, preform delivery inspections, status schedule, participate in third party tests

What are boundaries?

security and management of noise, dust, distrubances. Informative fencing and signage

What is the bidding and award stage?

selecting contractor, award of construction contract

What is the project Executives role?

senior level management position accountable and responsible for the overall management of the project and its ultimate outcome, leader of project team, owner relationships and negoticating the CM-Owner contract, estimates, bids, schedules, purchasing, Owner and A/E meetings

What are construction documents?

site plan, floor plans, key elevations, key details, key section specifications, key interior elevations, reflected ceiling plans, interior schedules, consultants drawings

What is site access and layout in logstics?

smooth movement within the site for materials, equipment, and personnel. Site entrances, exits and internal pathways

who is in charge of the project feasibility stage?

the owner


Conjuntos de estudio relacionados

Psychology Unit 4 test Chapter 9

View Set

Modern Architecture & Design II Midterm

View Set

30. Long lived assets (web, sch, cfa)

View Set

Principles and Theories of Behavior Analysis

View Set

Chapter 7 Virtualization and cloud computing

View Set