Construction Project Management test 1
How submits the contract for design bid build?
Architect
Who administers the contract for CM@Risk?
Architect
Who administers the contract for design build?
Architect
who is in charge of the bidding and aware stage?
Architects coordinates bid package
what is the project feasibility stage?
Assess desirability and cost, project goals, intial budget, schedule, project site analysis
What is equipment management in logstics?
Availability and readiness of equipment, overseeing trasnportation, maintence, rental needs
What are the site organization essentials?
Boundaries, access and egress, material storage,facilites location, waste management zones
What should be considered when choosing a delivery method?
Budget, design, risks, schedule, owner expertise
Owners in house organizational chart?
CEO, vice president of facilities, facilities project manager, security manager, owners project manager, building controls engineer
Characteristics of CM@ risk?
Cm works in owners interest, fast tracked, competitive bidding, GC is hired with CM, used with large complex projects
What is information flow in logistics?
Communication systems for all stakeholders, tracking deliveries, inventory levels, schedule updates
Characteristics of design bid build?
Competitive Bid, Cost known, no fast track, not suitable with change, GC hired after desing, public projects
what is the close out and occupancy stage?
Complete all requirements of the construciton contract, completion of contract terms and final payment
What is the construction project stage?
Complete, physcial work safely and on time and on budget, quality work, substantial completion
what is topography?
Considerations like drainage, machine placement, site access points
Who administers the contract for Agency Cm?
Construction Manager
who is responsible for the close out and occupancy?
Contractor
who is responsible for the preconstruction and mobilization stage?
Contractor
who is responsible for the construction project phase?
Contractor, means and methods
What is material delivery in logstics?
Coordinating with suppliers and trasnport services, minimizing delays
What is the design development design?
Finalizing the design including interior, systems consulting, oultine specification, elevations, reflected ceiling plans, interior schedules, key details, systems consultants drawings, revised cost estimate
Characteristics of Design Build?
Good communication between C and A, flexible, fast tracked, owner can be absent, no price up front, specialized projects, GC and A/E hired at same time
What is the Project managers role?
On site representative, manage actual construction, run day to day activites, planning and scheduling, budget and cost control, trade contractor contracts, labor relations, getting permits, community relations, daily issues, weekly meetings
What is the preconstruction and mobilization stage?
Organize construction, move on site, jobsite layout plan
Who is involved in Cm Agency?
Owner > CM Architect and Prime Contractors
Who is involved in CM @ risk?
Owner > CM and A/E
Who is involved in the design bid build method?
Owner > GC and A/E
What is the hierarchy of an ORG chart for construction?
Owner > architect and Contractor. Architect >engineers >interior designers. Contractor >Subs
Who is involded in Design build?
Owner> Design builder > A/E
What is a conceptual design?
Programming consists of establishing and documenting requirements for the project including design objectives, desired rooms, room sizes, relationships between spaces and relationships to sites (budget analysis, schedule development, code analysis, site analysis and selection
Who is on the Cm team?
Project Executive, Porject manager, Project Super, Project engineer
What are the project stages?
Project feasability, progamming and design, bidding and aware of contract, preconstruction and mobilization, construction, close out and occupancy
What is the schematic design?
Site plans, floor plans, key elevations, key sections, area analysis, renderings or model, preliminary cost.
What are some site layout considerations?
Topography, weather factors, sequential operations, mobile equipment movement, storage and staging, pedestrian flow, proximity to suppliers, noise and dust control
what is the project engineers role?
can be in office or in the field, review contract documents for completedness and cosntructability, review and submit all samples and shop drawings, coordinating flor of information, processing project schedule
What is labor and personnel in logsitics?
coordinated schedules ensuring the right personnel at the right time
what are some CM Pre-con services in design phase?
cost estimating, value engineering, life cycle cost analysis, master schedule, constructability, document coordination, site investigation, local officials, local practices, desing reviews, project cost, purchasing plan
What is access and egress?
deciding on pirmary and secondary points for logsitics and emergences. Unobstructed routes suitable for heavy machines
What is the programming and design project stage?
define specific project requirements, identify program requirements, updated estimates and schedule
What is storage management in logsitics?
designed storage ensuring easy access and protection from the elements, avoid waste
What is the purpose of an org chart?
developing workforce, budgeting, better communication, defining roles
Characteristics of CM Agency?
fast tracked, compettive bidding, sophisitcated owner, , no fixed price, large and complex projects, CM administers contracts
how to make an org chart?
identify objectives, specify work activities, classify each work activity, assign each activity to the appropriate role, determine the appropriate decision making
how is the hierarchy of a org chart made?
leadership direction based off of job identification, functions, reporting structure
why do org charts matter?
objectives, structure, accountability
who is responsible for programming and design?
owner takes the lead with the architect
Construction project team Organizational chart?
owner, OPM, architect, General Contractor, strutural design consultant, strutural steel contractor, suppliers
Architect organiziational chart?
principle in charge, project architect, senior designer, draftsman, Jr. Designer
Construction management company org chart?
project engineer, vice presidents, scheduler, senior estimator, safety director, project manager, general super, MEP super, project executive, intern
What is the project supers role?
responsible for supervising the physical construction of the project, understanding contract drawings and specs, prefomr monthly project scheudle updates, daily reports, preform delivery inspections, status schedule, participate in third party tests
What are boundaries?
security and management of noise, dust, distrubances. Informative fencing and signage
What is the bidding and award stage?
selecting contractor, award of construction contract
What is the project Executives role?
senior level management position accountable and responsible for the overall management of the project and its ultimate outcome, leader of project team, owner relationships and negoticating the CM-Owner contract, estimates, bids, schedules, purchasing, Owner and A/E meetings
What are construction documents?
site plan, floor plans, key elevations, key details, key section specifications, key interior elevations, reflected ceiling plans, interior schedules, consultants drawings
What is site access and layout in logstics?
smooth movement within the site for materials, equipment, and personnel. Site entrances, exits and internal pathways
who is in charge of the project feasibility stage?
the owner