DSM 14

¡Supera tus tareas y exámenes ahora con Quizwiz!

The EOQ lot size quantity would be ___________.

200

Each X requires 2 of component Y; each Y requires 4 of part Z. The lead time for assembly of X is 1 week. The lead time for the manufacturer of Y is 1 week. The lead time for procurement of Z is 6 weeks. The cumulative lead time for X is __________ weeks.

8

Which of the following best describes a gross material requirements plan?

A schedule that shows total demand for an item, when it must be ordered from a supplier, or when production must start

Capacity planning in closed-loop MRP does not do which of the following?

Adds in additional capacity

Material requirements planning (MRP) does not consider __________.

Capacity

Effective use of MRP and other dependent demand models does not require which of the following?

Cost of individual components

Which of the following statements regarding the gross material requirements plan is false?

It includes inventory on hand

Which of the following is false concerning enterprise resource planning?

It is inexpensive to implement.

What lot-sizing technique is generally preferred when inventory holding costs are extremely high?

L4L

Which of the following lot-sizing techniques results in the lowest holding costs?

L4L

MRP II is accurately described as:

MRP augmented by other resource variables

The __________ is the MRP input detailing which end items are to be produced, when they are needed, and in what quantities.

Master production schedule

A paint company mixes ten different base colors into 3,000 different color options. If the MPS is organized around the ten different base colors, their bills of material are classified as:

Modular

Firms making many different final products use __________ to facilitate production scheduling.

Modular bill

Linking a part requirement with a parent component that caused the requirement is referred to as:

Pegging

Which of the following is not a key benefit of MRP?

Quality increases

All of the following are advantages of enterprise resource planning except it __________.

Requires additional training

Which of the following statements regarding MRP in services is true?

Services such as restaurant meals illustrate dependent demand, and require product structure trees, bills-of-material, and scheduling.

Which of the following is a step towards integrating MRP and finite capacity?

Using smaller buckets

Enterprise Resource Planning __________.

automates and integrates the majority of business processes

The phrase "demand related to the demand for other products" describes __________.

dependent demand

In MRP, system nervousness is caused by __________.

management's attempt to continually respond to minor changes in production requirements

A document calls for the production of 50 small garden tractors in week 1; 50 small garden tractors and 100 riding mowers in week 2; 100 riding mowers and 200 garden utility carts in week 3; and 100 riding mowers in week 4. This document is most likely a __________.

master production schedule

Distortion in MRP systems can be minimized when safety stock is held at the __________.

raw material level

If a load report (resource requirements profile) shows a work center scheduled beyond capacity, then __________

the work center's load may be smoothed


Conjuntos de estudio relacionados

Art Appreciation Chapter 2 - Developing Visual Literacy

View Set