Info Systems Ch. 13

¡Supera tus tareas y exámenes ahora con Quizwiz!

What is meant by cutover? Briefly explain four cutover strategies.

Process of switching from an old information system to a replacement system -direct conversion -phase-in approach -pilot start-up -parallel start-up

_____ involves using a new or modified system under all kinds of operating conditions. Select one: a. Systems operation b. System construction c. Systems review d. Systems modification

a. Systems operation

_____ is the process of analyzing systems to make sure they are operating as intended. Select one: a. Systems review b. Systems operation c. Systems maintenance d. System construction

a. Systems review

Which of these is an advantage of prototyping? Select one: a. Users can try the system and provide constructive feedback during development. b. Formal end-of-phase reviews take place systematically. c. ​System documentation is always complete because the primary focus is on development of a prototype. d. There is a lot of attention given to system backup and recovery, performance, and security.

a. Users can try the system and provide constructive feedback during development.

A _____ is a minor change to correct a problem or make a small enhancement. Select one: a. patch b. slipstream upgrade c. version d. release

a. patch

A _____ is a critical date for completing a major part of a project, such as program design, coding, testing, and cutover. Select one: a. project milestone b. project deadline c. project schedule d. project due-date

a. project milestone

_____ involves testing the complete, integrated system (hardware, software, databases, people, and procedures) to validate that an information system meets all specified requirements. Select one: a. Integration testing b. System testing c. Volume testing d. User acceptance testing

b. System testing

____ explains the purpose of every major piece of computer code and also identifies and describes key variables. Select one: a. Agile documentation b. Technical documentation c. Systems documentation d. User documentation

b. Technical documentation

____ is also known as beta testing and application testing. Select one: a. System testing b. User acceptance testing c. Unit integration testing d. Volume testing

b. User acceptance testing

Site preparation can include _____. Select one: a. the hiring and training of information systems personnel b. installing special wiring and air conditioning c. readying users for a new system d. physically placing a computer system on the site and making it operational

b. installing special wiring and air conditioning

Testing that ideally forces an individual program to execute all of its various functions and user features is known as _____. Select one: a. system testing b. unit testing c. acceptance testing d. integration testing

b. unit testing

Which of these is a disadvantage of agile development? Select one: a. It puts applications into production later than any other approach. b. It does not encourage teamwork and interaction between users and stakeholders. c. It requires a larger percentage of stakeholders' and users' time than other approaches. d. It makes it difficult to produce documentation of project tasks.

c. It requires a larger percentage of stakeholders' and users' time than other approaches.

A _____ is a detailed description of when project activities are performed. Select one: a. project critical path b. project deadline c. project schedule d. project milestone

c. project schedule

The process of readying managers, decision makers, employees, system users, and stakeholders to accept and use the new system is called _____. Select one: a. site preparation b. phase-in approach c. user preparation d. user documentation

c. user preparation

The goals of _____ are to determine the work load at which systems performance begins to degrade and to identify and eliminate any issues that prevent the system from reaching its required system-level performance. Select one: a. unit testing b. ​user acceptance testing c. volume testing d. integration testing

c. volume testing

_____ is an iterative system development process that develops a system in "sprint" increments lasting from two weeks to two months. Select one: a. Prototyping b. Object-oriented development c. Individual development d. Agile development

d. Agile development

_____ is a limited internal acceptance test where employees of a software development organization and a limited number of other "friendlies" use the software and provide feedback. Select one: a. Gamma testing b. Beta testing c. Delta testing d. Alpha testing

d. Alpha testing

_____ is the creation, modification, or extension of software by people who are nonprofessional software developers. Select one: a. Mobile application development b. Object-oriented systems development c. User-oriented systems development d. End-user systems development

d. End-user systems development

_____ involves running a complete new system for one group of users rather than all users. Select one: a. Phase-in approach b. Parallel start-up c. Cutover d. Pilot start-up

d. Pilot start-up

_____ converts a system design into an operational system by acquiring and installing hardware and software, coding and testing software programs, creating and loading data into databases, and performing initial program testing. Select one: a. System testing b. Systems operation c. System implementation d. System construction

d. System construction

Which of the following statements is true of user acceptance testing (UAT)? Select one: a. UAT involves linking individual components together and testing them as a group to uncover any defects in the interface. b. A goal of UAT is to determine the work load at which systems performance begins to degrade. c. UAT is often done by independent testers who were not involved in developing program code. d. UAT must be completed successfully before newly developed software can be rolled out to the market.

d. UAT must be completed successfully before newly developed software can be rolled out to the market.

_____ consists of written descriptions developed for people who use a program. Select one: a. User acceptance report b. Technical documentation c. User preparation plan d. User documentation

d. User documentation

The process of switching from an old information system to a replacement system is called _____. Select one: a. installation b. conversion c. site preparation d. cutover

d. cutover

The temptation to add more features and functionality to the original range of the system is called _____. Select one: a. unit testing b. site preparation c. cutover d. scope creep

d. scope creep

A new _____ is a major program change, typically encompassing many new features. Select one: a. release b. patch c. slipstream upgrade d. version

d. version

What is system maintenance? List the reasons for systems maintenance.

stage of system development that involves changing and enhancing the system to make it more useful in achieving user and organizational goals -poor performance -changes in business process -changes in needs -bugs or errors in program -technical problems

Discuss the advantages and disadvantages of agile development.

+puts an application into production sooner than any other approach +documentation is produced as a by-product of completing project tasks +agile forces teamwork and lots of interaction between users and stakeholders -intense process that burn out system developers and other participants -requires system analysts and users to be skilled in agile system development tools and agile techniques -requires larger percentage of stakeholders' and users' time than other approaches

Briefly explain the difference between system testing and user acceptance testing (UAT).

-testing complete, integrated system, to validate that the information system meets all specified requirements -testing performed by trained system users to verify that the system can complete required tasks in a real-world operating environment and perform according to the system design specifications


Conjuntos de estudio relacionados

AP English Language and Composition

View Set

FINAL EXAM: ATI Safe Dosage, Nursing Conversions, ATI Medication Administration (Dosage Calculation), Drugs for Nurs 3110 Final, Dosages by Weights ATI, ATI Injectable Meds Test, ATI Oral Medications Test, Nurs 3110 M 11,109,8,7,6

View Set

Geologic Hazards Final Study Guide

View Set

Hematology Exam Simulator Questions

View Set

Chapter 12 Sliding Filament Theory #3

View Set

Chapter 6: protein and amino acids

View Set