In BIM, it is not just a model, it is __________.
a database
Which of the following is an influence of BIM on Industry Problems?
a. Clash Detection b. Better Communication c. Better Planning and Management *d. All of the above*
Implementing BIM requires detailed ____________ and fundamental process modifications for the project team members to successfully achieve the value from the available model information.
planning
Arrange the following in numeric order as per the BIM Project Execution Planning Procedure. Choose no.1 for the first step. Define supporting infrastructure for BIM implementation Identify BIM goals and uses Develop information exchange Design BIM project execution process
1. Identify BIM goals and uses 2. Design BIM project execution process 3. Develop information exchange 4. Define supporting infrastructure for BIM implementation
Arrange the following in a numeric order as per the BIM process. Choose no.1 for Programming. Fabrication Documentation Detailed Design Operation and Maintenance Construction Logistics Demolition Construction 4D/5D Analysis Programming Conceptual Design
1. Programming 2. Conceptual Design 3. Detailed Design 4. Analysis 5. Documentation 6. Fabrication 7. Construction 4D/5D 8. Construction Logistics 9. Operation and Maintenance 10. Demolition
How many uses of BIM have been identified by the BIM Project Execution Planning guide?
25
Match the following: 3D 4D 5D 6D 7D
3D- Visualization 4D- Scheduling 5D- Estimating 6D- Sustainability 7D- Facility Management
At the end of the planning phase, valuable information can be used by the facility operator for asset management, space planning, and maintenance scheduling to improve the overall performance of the facility or a portfolio of facilities.
False
BIM goals do not relate to advancing the capabilities of the project team members.
False
During the BIM execution process, a low-level map is initially developed to help team members clearly understand how their work processes interact with the processes performed by other team members.
False
One party within the project team should be held responsible for adequately outlining the execution plan.
False
Organizational growth or improvement is one of the categories of information that the BIM plan should address once completed.
False
The BIM Plan does not provide a benchmark for describing the process to a future participant who may join the project.
False
The Project Manager always develops the BIM Plan.
False
Which among the following BIM benefits scored the highest percentage according to BIM users?
Improved Collective Understanding of Design Intent
Match the following: LOD-100 LOD-200 LOD-300 LOD-400 LOD-500
LOD-100 - Scheduling: Total Project Construction duration LOD-200 - Preliminary Design: Three dimension-generic elements LOD-300 - Cost Estimation: Estimated cost based on measurement of specific assembly LOD-400 - Milestones: Constructability and Fabrication LOD-500 - Energy Analysis: Commissioning and recording of measured performance
What is the full form of NBIMS?
National Building Information Modeling Standards
BIM can carry some level of additional process risk due to inexperience and unfamiliarity.
True
BIM process design clearly illustrates the execution process through the use of process maps.
True
Defining specific implementation areas and uses for BIM is more important than focusing on whether or not to use BIM in general.
True
Ineffective planning of BIM implementation can result in increased costs for the modeling services, schedule delays due to missing information, and little to no added value.
True
The goal of the NBIMS-US is to identify and define standard information exchanges that are required on facility projects.
True