Live Virtual Machine Lab 12.3: Module 12 High Availability and Disaster Recovery Concepts

¡Supera tus tareas y exámenes ahora con Quizwiz!

A server needs to be added to a failover cluster, and a virtual switch needs to be created using Hyper-V Manager. The other server in the cluster has a preconfigured virtual switch named: PLCluster. What must be the name of the virtual switch that needs to be created?

PLCluster

After an incident has occurred resulting in data loss which of the following specifies the amount of acceptable data a company can lose?

Recover point objective

When configuring a server for a failover cluster, what needs to be validated before adding the server to the cluster? [Choose all that apply]

The server has a network interface card configured the same as the other server in the cluster The hard drives are all similarly configured The server has the same roles installed as the other servers in the cluster

A__________ site contains all the relevant network equipment and data but needs to be configured in the event of a disaster.

Warm Site

Which of the following needs to be done to ensure a backup can be scheduled? [Choose all that apply]

install the windows server backup feature Identify and configure storage solution for the backup


Conjuntos de estudio relacionados

Streptococcus pyogenes Group A Streptococcus

View Set

Physics Conceptual Questions (Exam #1 Practice)

View Set

Chapter 10 Anatomy Homework Notes

View Set

Truman Doctrine - Period 3 - 2017-18

View Set

Macroeconomics 201- exam 3: chp 16,17,20

View Set

American History B - Skill Challenges

View Set