MGMT 303 - Chapter 9

¡Supera tus tareas y exámenes ahora con Quizwiz!

If the planned fixed overhead for 5,000 units is $120,000, what is the flexible budget fixed overhead for 4,500 units?

$120,000 Budgeted fixed costs do not change within the relevant range

If the actual cost is greater than budgeted cost, the variance is labeled as ______.

unfavorable

If the actual hours worked exceeds the standard hours allowed for production, the direct labor efficiency variance will be:

unfavorable

When a master budget is flexed, total ______ costs will be different on the two budgets, but total ______ costs will be same.

variable, fixed

Use the following information to calculate the direct labor efficiency variance for Adkinson Company. Actual hours used 5,500 Standard hours allowed 5,800 Actual labor rate $14.75 per hour Standard rate $14.00 per hour

$4,200 Favorable $14.00 x (5,800-5,500)

A static budget shows variable supply cost of $6,250 based on 1,000 units. A flexible budget based on 1,250 units should show:

$7,500 ($6,250/1000*1200)

Fancy Nail's master budget for June was based on 2,400 manicures and supplies were budgeted at a total cost of $1,800. During June, 2,500 manicures were done and the total cost for supplies was $2,000. Which of the following statements are true?

- The volume variance is $75 Unfavorable Flexible budget amount for supplies = ($1,800/2,400)=$0.75x2,500 manicures=$1,875-$1,800=$75 Unfavorable - The spending variance is $125 Unfavorable Flexible budget amount for supplies = ($1,800/2,400)=$0.75x2,500 manicures = $1,875 - $2,000 = $125 Unfavorable

Which of the following statements are true?

- When calculating variances only one factor changes at the time - Variances always compare actual results to budgeted or standard results - Companies generally try to hold specific managers responsible for specific variances

The materials price variance is calculated using the:

- actual quantity of the input purchased - standard price of the input - actual price of the input

A variable overhead rate variance may be favorable because:

- less money was spent on supplies and other variable overhead items - the relationship between variable overhead and direct labor may not be perfect

T/F Favorable variances always indicate good performance.

False

T/F The labor rate variance measures the productivity of direct labor.

False

Which statement regarding variable overhead variance analysis is true?

The variable overhead efficiency may depend on the efficiency of direct labor.

The difference between the standard and the actual direct labor hourly rates is reflected in the _______ ________ variance.

labor rate

A price variance is the difference between the:

actual price and the standard price multiplied by the actual amount of input

To calculate a price variance, multiply the _____ quantity times the actual price and compare it to the actual quantity times the _____ price.

actual, standard

The direct materials price variance is the difference between the actual price of materials:

and the standard price for materials with the difference multiplied by the actual quantity of materials

Variable overhead variances:

are calculated using the same basic formulas as labor and material variances

Direct labor variances:

are computed in the same way as direct material variances

Spending variance:

calculated by comparing actual costs to the flexible budget

Volume variance:

calculated by comparing the master budget to the flexible budget

The materials quantity variance is generally the responsibility of the _____ department manager.

production

How much input should be used to produce a product or provide a service are specified by ________ standards.

quantity

The difference between the amount of an input used and the amount that should have been used, all evaluated at the standard price for the input, is called a(n) ______ variance.

quantity

The formula for the direct materials ______ variance is SP(SQ-AQ)

quantity

A company with a $2,000 unfavorable direct labor rate variance and a $700 favorable direct labor efficiency has a direct labor ______ variance of $ _____ _______.

spending, $1,300 unfavorable

A system that records based on what managers think they should be rather than using actual costs is a(n) _________ _________ system.

standard cost

Based on the following information below, calculate the variable overhead rate variance: Actual variable overhead cost $15,500 Actual hours used 4,200 Standard hours allowed 4,000 Standard variable overhead rate $3.75 per hour

$250 favorable Applied variable overhead cost is based on the actual hours so, applied overhead of $15,750 (4200 actual hours x $3.75) - $15,500 actual overhead = $250 overapplied. When the actual cost is less than the applied cost, the variance is favorable.

Use the following information to calculate the direct labor rate variance for Adkinson Company. Actual hours used 5,500 Standard hours allowed 5,800 Actual labor rate $14.75 per hour Standard rate $14.00 per hou

$4,125 Unfavorable The direct labor rate variance is: AH(AR-SR): 5,500 x ($14.75-$14.00) = $4,125 Unfavorable

Unfavorable labor rate variances may occur as a result of:

- overtime premiums being charged to the direct labor account - skilled worker being assigned to jobs requiring little skills

Ideal standards are problematic because:

- they demand peak effort at all times - they tend to discourage workers

Standards are:

- used to maintain consistency and quality - used to help control costs - based on what managers think costs should be

Which of the following are common causes for favorable variances?

- using less materials than expected - taking less time to produce a unit than expected - using less of a variable resource than expected

If the actual wage rate paid to employees is less than the standard rate allowed, the direct labor rate variance will be:

favorable

A budget that takes into account how costs are affected by changes in level of activity is a(n) ______ budget.

flexible

Standards that do not allow for any work interruptions or machine breakdowns are ______ standards.

ideal

The _____ budget is static, whereas a(n ______ budget adjusts revenues and costs as the level of activities changes.

master; flexible

The process of comparing actual and budgeted results is called ______ _______.

variance analysis

A(n) _______ _______ standard identifies the quantity and price of an input (i.e. ounces or pounds) that should be required to create a single unit of output.

direct material

A favorable material price variance:

- may be due to a quantity discount - may be due to price fluctuations - may be based on the quality of the goods

Comparing a static budget to actual results:

- may penalize a manager for serving more customers than expected - does not indicate what actions need to be taken to address a problem

What a company should spend to produce a single unit of product based on expected production and sales is shown on a(n) ______ ________ card.

standard cost

To encourage continuous improvement:

standards should increase in difficulty over time

Very detailed levels to reflect the required quantity of inputs for a product or service are specified in ______, whereas _____ represent the total dollar amount expected at a given level of output.

standards; budgets

In a standard costing system, overhead is applied by multiplying the budgeted overhead rate by:

the standard value of the cost driver


Conjuntos de estudio relacionados

MGMT363 - Chapter 6 (SmartBook Questions Only)

View Set

Правила чтения буквы Kk в английском языке

View Set

chp 6 mktg, Chapter 7 - Consumer Buying Behavior, MKTG 351: Test 2 Review - Chapter 9, chp 11 mktg

View Set

Checkpoint 4 CHEM 1101 memorization

View Set

Series 65 Unit 15 Checkpoint Exam

View Set

PLANTS, TREES, TIMBER AND FORESTRY - GRADE 7

View Set

Med-Surg 1 Exam 3: Cardiovascular/Endocrine (mce11)

View Set