OPMA (3306) CH. 9 - Learnsmart

¡Supera tus tareas y exámenes ahora con Quizwiz!

If a company has more units in the master production schedule than firm customer orders, the residual is called?

Available to promise

If a company has an MRP program that can reflect the exact status of each item in real time, this program is called?

A net change MRP system

The Master Production Schedule is used to plan

end items.

An _______________ ________________ __________________ system is a computer system that integrates application programs from the functional areas of a firm.

enterprise, resource, planning

A bill of materials that uses differences in alignment to indicate the order of assembly of components is using which type of structure?

indented structure

At any point in time, an MRP system can reference the _________ ____________ _____________ for information concerning parts availability to help meet gross requirements.

inventory record file

A material requirements planning system interfaces with the master production schedule, bill of materials file, and _______________ ______________ _______________.

inventory, records, file

The inventory records file contains an _______________ _______________ data segment that contains a detailed description of the item, lead time information, safety stock levels and other records.

item, master

If an end item is quite __________ or ____________, the master production schedule may include major sub-assemblies and/or complex components.

large, expensive

The _______________ ______________ ______________ lot sizing technique is a dynamic approach that adds ordering and inventory carrying costs for each trial lot size, divides the costs by the number of units, and chooses the lot size with the lowest unit cost.

least unit cost

The MPS typically deals with what type of item?

End items

True or false: Finished goods purchased by individuals external to the organization are considered dependent demand items.

False

Which of the following is/are a part of an MRP (Materials Required Planning) record?

Gross requirements, net requirements, and planned order receipts.

When changes occur because of stock receipts and disbursements, scrap losses, wrong parts and canceled orders, the real-time file capturing these changes is called the

Inventory transactions file

A process that places all identical parts at the same level in the bills of materials simplifies computations. This process is known as __________ __________ ___________ .

Low level coding.

In industry, materials requirements planning also goes by the acronym:

MRP

The _______________ ___________________ is kept on each item managed by the MRP system, and includes gross requirements, scheduled receipts, available balances, net requirements, planned order receipts, and order releases.

MRP Record

Which of the following is true about MRP?

MRP is an acronym used for Material Requirements Planning, MRP is used to determine the number of parts and other materials needed to produce a product.

Which of the following is/are issues a master scheduler must consider?

Never lose sight of the aggregate plan Trade-off manufacturing, engineering and marketing conflicts be involved with customer order promising

The bill of material (BOM) file is also known as

Product structure file, product tree

The first step in the MRP explosion process is?

Retrieve the gross requirements for end items from the MPS.

The file containing the complete product description, parts listing, quantity needed and product build sequence is called?

The bill-of-material

True or false: A least total cost lot sizing technique is a dynamic approach that continually looks for an optimal lot size where carrying costs and ordering costs are close to equal.

True

Which of the following is NOT a type of time fence described in the text?

Variable

In which of the following product manufacturing scenarios, would MRP provide the highest benefit?

appliances, motors, trucks

MRP systems tend to work best in companies where products are made in ________________ using the same productive equipment.

batches

Lot sizes are the part quantities issued in the planned order receipt and planned ___________ ____________ sections of an MRP schedule.

order, release

An EOQ lot sizing technique will try to minimize the sum of which of the following costs given a fairly constant demand?

setup, inventory holding

The ultimate goal of any MRP lot sizing approach is to balance the __________________ or ________________ costs and the ___________________ costs associated with meeting the net requirements generated by the MRP planning process.

setup, order, holding

A company producing widgets only needs Part A for 40% of the widgets built. This company is likely using what type of bill of materials?

super

Which of the following is NOT a part of the material requirements planning system?

supplier delivery schedule

____________________ ___________________ are a company's attempt to provide a controlled window of opportunity to make changes to the master production schedule.

time fences

An item that can be produced and stocked as a subassembly often uses a __________________ bill of materials for planning.

modular

A _____________________ requirement is the amount needed when the projected available balance plus the scheduled receipts in a period are not sufficient to cover the _________________ requirements.

net, gross

Which of the following are sources of demand for products in a material requirements planning system?

Customer orders from sales personnel Inter-department transactions Orders for specific components needed in repair


Conjuntos de estudio relacionados

Chapter 1 - Intro to Mobile App Programming

View Set

Politics and the media Test Three

View Set

Med Surg Test 4: Chap. 28, 29, 31, 53, 54, 55

View Set

A Tale of Two Cities Rhetorical Devices

View Set

7. What is eudaimonia according to Aristotle? What is required for eudaimonia according to Aristotle? Using the case of a corrupt, but satisfied octogenarian mob boss, explain how eudaimonia can come apart from the hedonistic utilitarian concept of happin

View Set

Infectious Diseases Affecting the Respiratory System

View Set

Accounting Final Exam Multiple Choice Practice

View Set

Chapter 11 - Childhood Neurodevelopmental Disorders (Psych) EAQ's

View Set