Variable Load Problems
always greater
the diversity factor is __ than 1.
also lowered
If the pressure in the steam line decreases below that in the accumulator, the accumulator pressure is ___.
highly variable demand
Industrial processes and domestic uses impose ___ upon the capacity of the plant.
high load , diversity factors
___ and ___ are desirable quantities.
plant capacity factor
another term which is useful in variable load studies is.
hydro units
are more reliable than steam units and usually give some advanced indication of loss of power.
large hydro-electric units
are not able to respond to sudden swings of load.
air,fuel and water
are raw materials for steam power.
Load Factor
defined as average load divided by the peak load.
utilization factor
defined as maximum demand of the system divided by the rated capacity of the system.
plant capacity factor
defined as the actual energy production divided by the maximum possible energy that have been produced during the same period.
demand factor
defined as the actual maximum demand divided by the connected load.
not be able to meet
during peak load period the plant will _____ the load demand.
lesser
greater the diversity factor, __ the cost of generation of power.
ideal load
have constant magnitude and steady duration.
rises above
if the pressure in the steam line ____ that in the accumulator, the accumulator will absorb steam until the heat added raises the saturation temperature.
peak load power plant
includes diesel-electric and gas turbine power plants.
base load power plant
includes steam, hydro-electric and geothermal power plants.
steam accumulator
is an unfired pressure vessel containing water to which excess steam from the boiler is sent during a charging cycle.
modification of capacity factor
is obtained by using only the actual number of hours the plant was in operation.
load duration curve
is obtained from the dame data as the daily load curves for a one year or a period of 8760 hours.
plant use factor
is the annual kilowatt hours production divided by the kilowatt of capacity times number of hours plant was in operation.
monthly load curve
is the average of the daily load curves over a one month period that is used in establishing the rates.
annual load curve
is the average of the daily load curves over a period of one year that is used in determining the annual load factor.
peak load
is the daily fluctuation of electricity use, it is usually lowest in the wee hours of the morning and highest in the early evening.
Maximum Demand
is the greatest demand of load on the power station during the given period.
base load
is the level that is typically does not go below,that is, the basic amount if electricity that is required.
variable load
is the load on a power station varirs from time to time due to the demand of consumers.
connected load
is the sum of continuous ratings of all the equipment connected to the supply the system.
diversity factor
is the sum of individual maximum demand, divided by the maximum simultaneous demand of the system.
increase torque of the motor
it also must be followed by an increased of flow of fuel, air and water to the steam generator.
less than unity
load and demand factor are always_; diversity factor and more than unity.
capacity factor
measures the percentage of maximum plant output that the load curve allows the unit to produce.
exchange off-peak power
one of the advantage of electrical interconnection is the ability to.
load curve
refers to the graph use to represent the relationship between the demanded load and time sequence.
average load
the average loads occurring on the power station in given period is known as.
reverse capacity
the difference between load and capacity factor is an indication of.
decrease
the investment cost per kilowatt of capacity increase as the size of the unit____.
hydroelectric development
the possible____sites along the flow of a steam are two types, these suitable for run of the river plants and those offering natural impoundment bases for storage plants.
not completed
the power plant product is_until the instant it is needed and then only in quantities exactly equal to the instantaneous demand.
storage batteries
the principal use of ____ for peak load is in connection with fraction system which for speed control reasons, use direct current.
mirrored
the variable load placed upon the electric generators of a powerplant is ___ in the steam demand on the boilers and on various other components.
absorb or give up
the water in the accumulator will ______, depending upon the pressure in the steam line reading to it and its saturation temperature.
lower the demand factor
the_, the less system capacity required to serve the connected load.
lower the capacity factor
the____of a station the less is the utilization of the investment.
flywheel
under certain favorable conditions a heat energy_may be interposed between a steam generator as a variable use of steam.
operating problems
when the power plant has been built and connected to a distribution system the variable load conditions imposes___.
fully charged
when the water being charged reaches saturation temperature at boiler steam pressure. the accumulator is____.
annual capacity factor
would be the annual kilowatt hours produced by the kilowatts of plant capacity times hours of the year.