A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate. True or False

False

A customer order decoupling point is where the order moves from the marketing department to the production department. True or False

False

A make-to-order firm will work with the customer to design the product and then make it from purchased materials, parts, and components. True or False

False

A manufacturing cell layout is a dedicated area where products that are for the same or very similar customers are produced. True or False

False

Break-even analysis can only be used in production equipment decision making when dealing solely with fixed costs, not variable costs. True or False

False

The essential issue in satisfying customers in the make-to-stock environment is to balance the cost of the finished item against the willingness of the consumer to pay for it. True or False

False

The time needed to respond to a customer's order is called the customer response time. True or False

False

Work-center layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements. True or False

False

A general-purpose machine is less capable than a special-purpose machine in certain tasks but can perform a broader variety of tasks. True or False

True

A process flowchart denotes what happens to the product as it progresses through the productive facility. True or False

True

A project layout is characterized by a high degree of task ordering. True or False

True

A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats. True or False

True

A project layout is only used for products in a fixed location. True or False

True

An example of an assemble-to-order firm is Dell Computer. True or False

True

Assemble-to-order means moving the customer order decoupling point from finished goods to components. True or False

True

Break-even analysis can be used to help decide whether to perform a task with a special-purpose machine or with a general-purpose machine. True or False

True

Engineer-to-order firms will work with the customer to design the product and then make it from purchased materials, parts, and components. True or False

True

Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service. True or False

True

The closer the customer is to the customer order decoupling point, the more quickly the customer receives the product. True or False

True

The essential issue in satisfying customers in the make-to-stock environment is to balance the level of finished inventory against the level of service to the customer. True or False

True

The focus in the make-to-stock environment is on providing finished goods where and when the customers want them. True or False

True

The product-process matrix shows the relationship between process structures and product volume and variety characteristics. True or False

True

The term "assembly line" refers to progressive assembly linked by some material handling device. True or False

True

The volume requirements for the product are one determinant of the choice of which process structure to select. True or False

True

One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous. True or False

True

One methodology used to evaluate equipment investment decisions where the investment entails an initial investment, fixed costs, and variable costs is break-even analysis. True or False

True

One trade-off illustrated by the product-process matrix is between flexibility and cost. True or False

True

Lean manufacturing means minimizing the number of workers and machines used in a process. True or False

False

Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces. True or False

False

The closer the customer is to the customer order decoupling point, the longer it takes the customer to receive the product. True or False

False


Kaugnay na mga set ng pag-aaral

Lab 17-2: Scanning a Network for Connected Devices

View Set

Musculoskeletal Problems-Chapter 16-Dunphy

View Set

AP Econ Midterm 34 MCQ questions

View Set

Chapter 12 Vocab Child development

View Set