chapter 13 final

Pataasin ang iyong marka sa homework at exams ngayon gamit ang Quizwiz!

In order, what are the first three steps in BPM?

A) 1. identifying processes for change, 2. analyzing existing processes, 3. designing the new process.

________ development focuses on rapid delivery of working software by breaking a large project into a series of small sub-projects that are completed in short periods of time using iteration and continuous feedback.

A) Agile

Which of the following is more powerful than rationalization of procedures?

A) Business process redesign

Which of the following statements about CASE is not true?

A) CASE provides hardware and software tools.

In an object-oriented development framework for a university, how would the classes Degree, Mathematics, and Physics be related?

A) Degree would be a sister class to Mathematics and Physics.

What is the purpose of responsive web design?

A) It allows one website to serve different platforms, such as tablets, PCs, and mobile phones.

Which conversion process introduces the system first to a limited portion of the organization?

A) Pilot study strategy

The process of creating workable information systems in a very short period of time is called:

A) RAD.

What is the primary driving factor for firms in selecting domestic outsourcing firms to build system solutions?

A) To take advantage of technical skills the firm does not have

In which type of systems building are the development stages organized so that tasks in one stage are completed before the tasks in the next stage begin?

A) Traditional

Which of the following statements about mobile web apps is true?

A) Users access mobile web apps through their mobile device's web browser.

To understand and define the contents of data flows and data stores, system builders use:

A) a data dictionary.

Object-oriented modeling is based on the concepts of:

A) class and inheritance.

A systems analysis includes a(n) ________ that is used to determine whether the solution is achievable, from a financial, technical, and organizational standpoint.

A) feasibility study

An entire information system is broken down into its subsystems by using:

A) high-level data flow diagrams.

During the ________ stage of system development, system specifications that were prepared during the design stage are translated into software code.

A) programming

To show each level of a system's design, its relationship to other levels, and its place in the overall design structure, structured methodologies use:

A) structure charts.

________ provide(s) a methodology and tools for dealing with the organization's ongoing need to revise and optimize its numerous business processes.

B) Business process management

Groups of objects are assembled into software components for common functions, which can be combined into large-scale business applications, in which type of software development?

B) Component-based development

________ is the process of changing from the old system to the new system.

B) Conversion

As a technical project manager, you have decided to propose implementing a prototyping methodology for a small web-based design project. What is the order of steps you will follow in this project?

B) Identify user requirements, develop the prototype, use the prototype, revise and enhance the prototype.

________ provide(s) a detailed statement of the information needs that a new system must satisfy; identifies who needs what information, and when, where, and how the information is needed.

B) Information requirements

Which type of systems development is characterized by significantly speeding up the design phase and the generation of information requirements and involving users at an intense level?

B) JAD

Which process develops a detailed description of the functions that a new information system must perform?

B) Requirements analysis

In what stage of systems development are design specifications created?

B) Systems design

A bank has reworked its mortgage application process so that several steps are handled by computer software, and some steps are combined to reduce bottlenecks in processing. The goal is to gradually improve its efficiency over time. This is an example of:

B) rationalization of procedures.

In the direct cutover conversion strategy, the new system:

B) replaces the old one at on an appointed day.

Systems design:

B) shows how the new system will fulfill the information requirements.

System testing:

B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned.

Compared to the use of proprietary components, web services promise to be less expensive and less difficult to implement because of:

B) their ability to enable communication among different systems using universal standards.

A native mobile app is:

C) a standalone application that does not use a browser.

End user development:

C) allows ends users to develop simple information systems.

In a parallel conversion strategy, the new system:

C) and the old are run together for a time.

The four kinds of structural organizational change enabled by IT, in order from least to most risky, are:

C) automation, rationalization, redesigning, and paradigm shift.

Changes in hardware, software, documentation, or production to a production system to correct errors, meet new requirements, or improve processing efficiencies are termed:

C) maintenance.

Object-oriented development could potentially reduce the time and cost of writing software because:

C) objects are reusable

An upscale organic foods grocery chain is implementing an information system that will enable it to add same-day home delivery of groceries to its customers. This is an example of:

C) paradigm shift.

In object-oriented development:

C) processing logic resides within objects.

A(n) ________ is the model or blueprint for an information system solution and consists of all the specifications that will deliver the functions identified during systems analysis.

C) systems design document

Transferring data from a legacy system to the new system would be defined by which category of system design specifications?

D) Conversion

Which of the following is not a top priority in mobile application development?

D) Designing for keyboard data entry

What is the greatest barrier to successful business process change?

D) Organizational culture

You are an IT project manager for an advertising firm. The firm wishes to create an online tool that will be used to survey focus group reactions to products in development. The most important consideration for the firm is being able to offer the tool as soon as possible as a new corporate service. However, you know that many of the senior managers that are business owners of this project have difficulty in understanding technical or software development issues, and are likely to change their requirements during the course of development. What development method would be most successful for this project?

D) Prototyping

The idea that the achievement of quality control is an end in itself describes a main concept of:

D) TQM.

Which of the following may occur when systems are created rapidly, without a formal development methodology?

D) Testing and documentation may be inadequate.

In the traditional systems life cycle, end users:

D) are limited to providing information requirements and reviewing the technical staff's work.

BPM software provides tools that help business do all of the following except:

D) capture and identify information system requirements for a new system.

The primary tool for representing a system's component processes and the flow of data between them is the:

D) data flow diagram.

A "responsive design" for mobile applications is a design that responds to a user's:

D) digital device and screen size.

In automation:

D) employees are enabled to perform their tasks more efficiently.

A(n) ________ is an organizational change that involves rethinking the nature of the business and the nature of the

D) paradigm shift

Acceptance testing:

D) provides the final certification that the system is ready to be used in a production setting.

A software package evaluation process is often based on a series of questions sent to vendors, called a(n):

D) request for proposal.

The oldest method for building information systems is:

D) the systems life cycle.

The entire system-building effort is driven by:

D) user information requirements.

________ describe the transformation occurring within the lowest level of the data flow diagrams.

E) Process specifications

Organizational software packages often include ________ features that allow the software to be modified to meet organizational requirements.

E) customization

A systems building approach in which the system is developed as successive versions, each version reflecting requirements more accurately, is described to be:

E) iterative.

Unit testing:

E) tests each program separately.

Possible functions of BPM tools include all of the following except:

testing the security of business processes.


Kaugnay na mga set ng pag-aaral

Chapter 10 Configuring Remote Management

View Set

El sistema esquelético del cuerpo humano

View Set

ECON 440: Experimental Economics: Test 1, part 1 -Bachir Kassas

View Set

mutisensory integration / attention and spatial awareness (parietal lobe)

View Set

GBS151 Chapter 9: Production and Operations Management

View Set

OSPF Network Types and Implementing Multiarea

View Set