MGMT 425 CH 9

Pataasin ang iyong marka sa homework at exams ngayon gamit ang Quizwiz!

A _____ defines the project, its objectives, and deliverables, and represents a contract between the project team and the sponsor. a. project charter b. project diagram c. SIPOC diagram d. CTQ tree

a

An effective problem-solving process that can easily be adapted to quality improvement stems from _____ concepts pioneered by Alex Osborn. a. creative-problem solving b. cause-and-effect c. hypothesis testing d. analysis of variance

a

In a bottom-up approach to Six Sigma projects, _____ choose the projects that are well-suited to the capabilities of teams. a. black belts b. team members c. green belts d. champions

a

Data such as production volume, cost, and customer satisfaction indexes are often plotted on a _____, which displays the data over time. a. check sheet b. control chart c. run chart d. SIPOC diagram

c

In the context of Six Sigma teams, who among the following are full-time Six Sigma experts who are responsible for Six Sigma strategy, training, mentoring, deployment, and results but, are typically not members of Six Sigma project teams? a. Champions b. Green belts c. Master black belts d. Black belts

c

In the context of Six Sigma teams, who among the following are functional employees who are trained in introductory Six Sigma tools and methodology and work on projects on a part-time basis? a. Champions b. Master black belts c. Green belts d. Black belts

c

In the context of Six Sigma teams, who among the following are fully-trained Six Sigma experts with extensive technical training who perform much of the technical analysis required in Six Sigma projects, usually on a full-time basis? a. Black belts b. Champions c. Green belts d. Team members

a

What is the Six Sigma quality level when the process standard deviation is 1σ and the tolerance range is 10 σ? a. 5 b. 3 c. 9 d. 11

a

Which of the following categories of problems is characterized by unsatisfactory performance by processes that are not well-specified or understood? a. Unstructured performance problems b. Efficiency problems c. Conformance problems d. Product design problems

a

Which of the following stages of the PDSA cycle determines whether the trial plan is working correctly by evaluating the results, recording the learning, and determining whether any further issues or opportunities need be addressed? a. Study b. Do c. Plan d. Act

a

With respect to 5S, which of the following Japanese terms refer to formalizing procedures and practices to create consistency and ensure that all steps are performed correctly? a. Seiketsu b. Seiri c. Shitsuke d. Seiton

a

_____ are special types of data collection forms in which the results can be interpreted on the form directly without additional processing. a. Check sheets b. Run charts c. Data sheets d. Control charts

a

______ are the graphical components of regression analysis. a. Scatter diagrams b. Run charts c. Pareto diagrams d. Histograms

a

Balancing quality costs against expected revenue gains has become known as: a. quality function deployment. b. return on quality. c. house of quality. d. quality trilogy.

b

In the context of a Six Sigma team, who among the following is typically a senior-level manager who owns the Six Sigma project and is responsible for its completion and results? a. A black belt b. A champion c. A green belt d. A team member

b

In the context of the DMAIC process, _____ provide a broad overview of the key elements in the process and help to explain who is the process owner, how inputs are acquired, who the process serves, and how it adds value. a. Pareto diagrams b. SIPOC maps c. cause-and-effect diagrams d. histograms

b

In which of the following stages of the PDSA cycle, the plan is implemented on a trial basis, such as in a laboratory, pilot production process, or with a small group of customers, to evaluate a proposed solution and provide objective data? a. Study b. Do c. Check d. Act

b

One useful quality control tool to help identify the most important issue among a mess of symptoms is _____. a. quincunx b. Pareto analysis c. run chart d. histogram

b

The term _____ is based on a statistical measure that equates to 3.4 or fewer errors or defects per million opportunities. a. Pareto analysis b. Six Sigma c. Quincunx d. Quality trilogy

b

Which of the following categories of problems is characterized by unsatisfactory performance that causes dissatisfaction from the standpoint of noncustomer stakeholders, such as managers of financial or supply chain functions? a. Product design problems b. Efficiency problems c. Unstructured performance problems d. Conformance problems

b

Which of the following categories of quality problems is characterized by unsatisfactory performance that causes customer dissatisfaction, such as high levels of defects, service failures, or customer complaints? a. Unstructured performance problems b. Conformance problems c. Product design problems d. Efficiency problems

b

In which of the following stages of the FADE approach, a team selects the problem to be addressed and defines it, characterizing the current state of the process, why change is needed, what the desired result should be, and the benefits of achieving the result? a. Analyze b. Develop c. Focus d. Execute

c

Successful green belts are often promoted to _____. a. champions b. team members c. black belts d. master black belts

c

The _____ is a simple adaptation of the scientific method for process improvement. a. Juran quality trilogy b. Taguchi loss function c. Deming cycle d. quincunx experiment

c

Which of the following is the most widely-known process improvement methodology used in Six Sigma? a. Quincunx b. FADE c. DMAIC d. TRIZ

c

Which stage of the PDSA cycle consists of studying the current situation, understanding customer expectations, gathering data, and testing theories of causes? a. Act b. Do c. Plan d. Study

c

With respect to 5S, which of the following Japanese terms refer to arranging materials and equipment so that they are easy to find and use? a. Seiri b. Seiso c. Seiton d. Shitsuke

c

With respect to 5S, which of the following Japanese terms refer to ensuring that each item in a workplace is in its proper place or identified as unnecessary and removed? a. Seiton b. Seiketsu c. Seiri d. Seiso

c

In which of the following stages of the FADE approach, the solution is implemented and a monitoring plan is established? a. Analyze b. Develop c. Focus d. Execute

d

In which of the following stages of the FADE approach, the team works to describe the process in detail, determine what data and information are needed, and develop a list of root causes for the problem? a. Execute b. Focus c. Develop d. Analyze

d

In which of the following stages of the PDSA cycle, the improvements become standardized and the final plan is implemented as a "current best practice" and communicated throughout the organization? a. Study b. Do c. Plan d. Act

d

Toyota created a unique tool, called the _____, to succinctly consolidate and visualize information for identifying and solving quality problems. a. Pareto diagram b. run chart c. histogram d. A3 report

d

Which of the following is a major drawback of the bottom-up approach to Six Sigma projects? a. The projects are too broad in scope to be completed in a timely manner. b. The projects are not well suited to the capabilities of the teams as they are chosen by top management who may not be aware of the capabilities of the teams. c. The top managers underestimate the cost and overestimate the capabilities of the team or teams to which the project is assigned. d. The projects receive little support and low recognition from the top management.

d

Which of the following stages of the FADE approach focuses on creating a solution and implementation plan along with documentation to explain and justify recommendations to management who must allocate the resources? a. Focus b. Analyze c. Execute d. Develop

d

With respect to Pareto analysis, a Pareto _____ is one in which the characteristics observed are ordered from largest frequency to smallest. a. quincunx b. histogram c. charter d. distribution

d

American Express pioneered the concept of Six Sigma as an approach to measuring product and service quality.

false

Compared to Six Sigma, TQM focuses on a more rigorous and advanced set of statistical methods.

false

Data sheets are special types of data collection forms in which the results are interpreted on the form directly without additional processing.

false

In the context of a Six Sigma team, green belts are full-time Six Sigma experts who are responsible for Six Sigma strategy, training, mentoring, deployment, and results.

false

Six Sigma is focused on improvement with little financial accountability whereas TQM requires a verifiable return on investment and focus on the bottom line.

false

The "define" phase of the DMAIC process focuses on understanding process performance and collecting the data necessary for analysis.

false

The "do" stage in the PDSA cycle involves identifying problems.

false

The "plan" stage in the PDSA cycle involves determining whether the trial plan is working correctly by evaluating the results.

false

The bottom-up way to generate six sigma projects is generally tied to business strategy and is aligned with customer needs.

false

The term six sigma is based on a statistical measure that equates to 4.3 or fewer errors or defects per million opportunities.

false

The vertical axis on a run chart is the time scale.

false

A structured problem-solving approach to process improvement ensures that solutions are developed objectively, rather than based on opinions or rash judgments.

true

According to Kepner and Tregoe, a problem is a deviation between what should be happening and what actually is happening that is important enough to make someone think the deviation ought to be corrected.

true

An ultimate stretch goal of all organizations that adopt a Six Sigma philosophy is to have all critical processes, regardless of functional area, at a six-sigma level of capability.

true

At each step, the Pareto diagram stratifies the data to more detailed levels, eventually isolating the most significant issues in process improvement.

true

Both Six Sigma and lean approaches are driven by customer requirements, focus on real dollar savings, have the ability to make significant financial impacts on the organization, and can easily be used in non-manufacturing environments.

true

Compared to lean tools, Six Sigma tools are more intuitive and easier to apply by anybody in the workplace

true

DMAIC, a process improvement methodology bears a close resemblance to the creative problem solving process.

true

Lean production approaches focus on the elimination of waste in all forms, including defects requiring rework.

true

Many organizations use the Deming cycle as the basis for their organizational performance improvement activities.

true

Projects are the vehicles that are used to organize and to implement Six Sigma.

true

Six Sigma is owned by business leader champions.

true

Six Sigma methods are most applicable to conformance problems because the processes that create the problems can be easily identified, measured, analyzed, and changed.

true

The cause-and-effect diagrams are constructed in a brainstorming type of atmosphere.

true

The fundamental premise of PDSA cycle is that improvement comes from the application of knowledge.

true


Kaugnay na mga set ng pag-aaral

Nursing Care of the Child With an Integumentary Disorder (and alteration in tissue integrity)

View Set

Audit Chapter 13 - Overall Audit Strategy and Audit Program

View Set

Sem 3 - Unit 2 - Glucose Regulation - NCO

View Set

financial markets and institutions

View Set

Chapter 13 labor and birth process

View Set

Les questions avec les jours, les mois et les saisons

View Set

Unit 2 Test Review - Properties, Order of Operations, Evaluating Expressions

View Set

Geology: Quiz Questions & Answers (Test 3)

View Set