Exterior doors are installed _____ the framing is complete sheathing is installed, and building wrap is applied. Prehung door kits include the frame, ________ threshold, exterior casing and the door itself. A ______ is often included with the door kit

after threshold lockset

.One building envelope consists of all building component s, such as basement walls exterior walls floors and roof that separate, ___________ space from _____________ space or outdoor.

conditioned unconditioned

when a door is delivered to the job site carefully inspect the door for _________ before accepting it. Once it has been accepted store: in the unopened shipping container to protect it, in an area that permits good air _______ , in an area where it is not exposed to the elements.

damage circulation

____ - __ means that the building shell has been completed sufficiently to keep out wind rain etc., for work to begin indoors an to protect weather sensitive materials the final step in drying in a house is the installation of ________ and _______ doors.

dry-in windows exterior

In new home construction, the international residential code (IRC) requires that you install an ________ window in each bedroom. An _______ window is designed to provide an __________ Means for exiting the dwelling. Windows must meet specific IRC criteria to qualify as an egress window.

egress emergency

The building envelope is concerned mostly with providing ________ efficiency

energy

Commercial exterior doors: The type and style selected is based on its purpose; EX- motion sensored door/revolving door/thermally effecient door/

yes

Vinyl metal and metal clad wood windows are equipped with nailing ________ (fins) around the outside. Screws or roofing nails are used to secure the window to the framing members. _____ windows do not have flanges.

flanges wood

the installation of commercial doors is typically more complicate than residential doors. Due to their complexity commercial exterior doors are often installed by teams that have been specifically trained by the door ______________

manufacturers

The building envelope is affected by the types of construction ___________ and the __________ practices. The building is protected from air infiltration through the use of the building ______, _________, and ______. Thermal protection for the building envelope is provided by _______________.

materials insulation wrap windows doors insulation.

Glass blocks- may be used in place of standard windows to provide ______ while at the same time providing ________. Glass blocks are available individually or they are available in pre assembled panels in a range of sizes. When the size of the opening is less that 25 square feet, the height should be no greater _' and the width no greater than _' : When the opening is greater than 25 square feet, the panels should never be more the __' wide or 10' high.

Light privacy 7 5

Windows must meet specific IRC criteria to qualify as an egress window. Minimum opening width __". Minumum opening height: __". Maximum sill height above floor: __"

20 24 44

Step 1 of installing building wrap: Using two people and beginning at a corner on one side of the structure leave _ to __ inches of the wrap extended beyond the corner to be use as an overlap on the adjacent side of the structure.

6 12

Locksets of various designs offer different levels of _______. Tubular and cylindrical _______ secure. Unit lock and mortise, _____ secure. Security lock and deadbolt lock, _______ secure. Single cylinder requires a key on ____ side. Double cylinder requires a key on ____ sides.

security least more most one both

Note for installing a prehung exterior: the factory installed spacer _____ between the door and the frame should be left in place until the frame is securely attached to the rough opening.

shims

Step #1 for installing a window. -Make sure the window is ____ -Make sure the opening is plumb, level, ______ ( using a framing square), and large enough to accommodate the window. Allow approximately _/_ to _/_ space between the rough header and the window head jamb to account for settling.

shut square 1/4 1/2

To install a door ________ a chisel is used to cut a mortise first.

strike

Lock manufacturers include installation instructions and drilling _________ in their packaging. However professionals generally prefer to use a boring ___ and boring bit along with a _______ mortise marker instead of a template because this method is faster and more accurate.

templates jig


Kaugnay na mga set ng pag-aaral

Environmental Health: Epidemiology

View Set

Bio 11: Quiz on Water Properties

View Set

69. Venae brachiocephalicae, systém vv.jugulares

View Set

Neurological: Stroke, Spinal Cord Injury Ch. 62, 63, 42

View Set

Key Concept: Hypothesis Testing with Single Sample t Test

View Set