Risk management
Administrative
First sergeant Jones post a sign outside the entrance to the maintenance shop indicating that here and protect the protection is required inside. This is a sample of what type of birth control?
Deliberate
A battalion commander and her staff are conducting a Marine Corps planning process (MCPP) session to develop and an operations order (OPORD) for an upcoming offensive operation. The operation begins in 96 hours. To MCPP session would fall under which risk management level?
Identify hazards
A hazard is defined as any condition with the potential to negatively impact the task, activity or mission, cause property damage, injury to personal or death.
Risk management principles
Accept the risk when benefits outweigh the cost. Accept no unnecessary risk. Anticipate and manage Risk by planning. Make risk decisions at the right level.
Accept no unnecessary risk
An unnecessary risk is one of that, if taken, will not contribute to the task or Mission accomplishment or will needlessly jeopardize Personnel or material. Manage risk through Relentless training, awareness of the rest being confronted, and an understanding of the mission at hand. Bottom line- take only those risk needed to accomplish the task, activity, or Mission.
Compensate for the risk
Compensating for potential losses is done by assigning a unique or redundant capabilities to ensure Mission, task or activity success.
Make risk decisions at the right level
Elevating the risk position of the chain of command is part of what risk management principle?
Engineering, administrative, physical.
Prioritize types of controls from most prefer to least preferred
Implement control and control criteria
Suitability, Feasibility, acceptability, explicitness, support, Standards , training, leadership, individual
Pressure to complete the mission.
Which element is often present when human error exist in a mishap?
Control
Actions taken or measures put in place to laminate a hazard or reduce the associated into fight risk. The three types of controls are engineering, administrative, and physical personal protective equipment PPE control.
Risk
An expression of possible loss, adverse outcome or negative consequence, such as injury, illness or material damage in terms of probability and severity.
Mishap
Anaplan event or series of events resulting in death, injury, occupational illness, damage to or loss of equipment or property, or damage to the environment.
Hazard
Any real or potential condition that can cause injury comma illness comma or death to Personnel, damage to or loss of equipment or property, degradation of mission capability or impact Mission accomplishment, or damage to the environment. Synonymous with the operational term threat
In depth
Applies when the available time for planning is not limiting factor and involves a very through risk assessment when the hazards and Associated risks are not well understood. Examples include long-term planning of complex operations, introduction of new equipment, materials, and missions, development of tactics and training curriculum, and major system overhaul of repair
Do and debrief the event
DND and debris it's time to step four and five of the five-step risk management process. Do the task or Mission using the risk controls selective. Used appropriate resources while adjusting actions as required ensuring success. Ensure the feedback loop for the priests perform to capture and disseminate Lessons Learned. Identify what worked and what didn't work
Control
Engineering, administrative, and physical.
Implement controls
Ensure the controls are converted into clear, simple execution orders understood at all levels. This requires that the plan is currently clearly communicated to all involved Personnel, accountability is stablished, and the required support is provided
Compensate for the risk
Esquin east across a narrow foot Bridge across a windy, Mountain can you execute a critical mission. The squad leader is concerned about the hazards and Associate risk, so he raises the issue to the platoon Commander. The platoon Commander Drex that each member of the squad become linked to a single rope that is anchored to a nurse I really. This directive is an example of which type of risk control?
Supervise
Evaluate controls the insurance they remain in place and have the desired effect or to change controls that are not working. The provision is continuous and also include establishing a method for feedback in order to identify view hazards or needed control adjustment.
Assess hazards
For Hazzard identify, determine Associated degree of risk in terms of probability and severity. The result of the risk assessment is a prioritized is a list of Hazards ensuring control and being into 5 for the most serious threat to task, Mission, personnel, and Equipment before the last serious threats.
Risk management 5-step process cycle
Identify hazards , assess hazards, make risk decisions, Implement controls, supervise.
make risk decisions
Identifying and assessing risk controls options in determining the type of controls associated with the rest are subcomponents of which step in the risk management process. A ticket in your mouth
Reject the risk
If the overall risk his seeds to benefit, then do not take the risk. This is a valid option when you do not have the authority to apply proper or necessary controls, and it ensures the best decisions elevated.
Delay an action
If there is not a hard time or another benefit to a quick accomplishment of an activity, test, or missing, the best wrestler duction option may be delayed the action until conditions are favorable.
Risk management levels
In depth Deliberate Time critical
Deliberate
In depth and levels of risk management are used when there is time to document the results of the planning
Anticipate and manage Risk by planning
Integrating risk management into planning at all levels, and as early as possible, provides the greatest opportunity to make well-informed decisions and Implement effective risk controls.
Balance your resources
It is Z100 on Saturday. Earlier you and your buddy drove to a local Club to have a few drinks, and now neither of you is in any condition to drive. As the lights come on, both of you discuss your options and how to get back to the barracks without getting arrested or Worse causing an accident. You should just a text, asking a designated driver at the club to take you back, or walking. This is Carson is it example of which step of the ABCD model?
Avoid
It may be possible to avoid specific Risk by conducting activity, task or mission in a different way. However, conducting a mission by alternate means made presenting new hazards.
Accept risk when benefits outweigh the cost
Marine Corps tradition emphasizes seizing initiative and taking decisive action. The goal of risk management is not to eliminate risk, but management the risk, so missions are accomplished with the minimum amount of loss to maximize success
Deliberate
Refers to situations where there is ample time to apply to risk management process to Mission planning Evolution. This level as his primary experience personnel and brainstorming to insert it into five hazards, review mishap trans, and develop controls. It is more effective when done in a group. The Marine Corps planning process (MCCP) and drafting or updating standard operating PROCEDURES (SOP) or letters of instructions LOI are examples
Make risk decisions at the right level
Risk decisions will be made at the appropriate level, by the individual with the authority, knowledge, and experience necessary to recognize when benefits outweigh the cost. When in doubt, a marine should Elevate the decision of the chain of command.
Assess the situation
The A combines the first two steps of the 5-step RM process then to 5 and access to hazards. Consider the situation in indentified the risk, Hazard, and resources available. Acquire an accurate perception of what is happening in a short time and projecting its effects Maintaining good situation awareness is key
Balance your resources
The B is akin to making a risk decision step 3 of all the 5-step risk management process mitigate risk. After assessing the situation, leaders must Consider using the resources created for the test emissions. Develop and weight risk control options. Pre-plan for hazards increase the ability of the resources.
To set the time and resources available and allocate them accordingly in order to produce the best result.
The Five Steps step risk management process has five comments that when fully maximize the benefit and desire effort of the risk management process maintaining balance is the risk management process has which of the following as its objective?
Evaluate risk control options
The hazard, reject, a boy, delay in action, transfer, compensate.
Transfer the risk
The rest may be reduced by transferring all or some portion of the Pacific in particular task or Mission. Transferring risk to another individual, you know, or platform that is better position to face the risk increases the probability and severity of the risk.
Communicate to others
The sea is to communicate explicitly during the situation, and it is time to all steps of the five-step risk management process. Clear, concise, two way communication is essential for Effective execution. Maintaining good essay of additive conditions, test loading, and two factors are critical to communication because an individual's perception and communication skills deteriorate as they lose SA
Make risk decisions
There are two sub steps to make informed decisions: 1) identify and assess risk control options reject, a boy, delay an accent, transfer, and compensate. 2) determine the type of control engineering, administrative, or physical personal protective equipment PPE
Time critical
This is the level at which Personnel operate on a daily basis both on and off duty. The term critical level is the normal risk management level use during the execution phase of training or operations. There is little or no time to make a formal plan resulting in an on-the-spot mental or verbal risk assessment and decision.
Elevate the decision up the chain of command
When you question your Authority, knowledge, or experience necessary to determine whether the risk will outweigh the cost, what should you do?
Assertiveness and resources.
Which elements are typically missing when human error exist in a mishap
Assessing risk control options such as identifying heat stress as a hazard for summertime Road March
Which of the following is an example of the fourth step, Implement controls, in the five-step risk management process.
Accept no unnecessary risk
Which risk management principle is best demonstrated by through hazard identification and assessment in order to prevent needlessly jeopardizing Marines and equipment