16. External setup time refers to:

The time it takes to complete the set up actives to requiring the machine to be stopped

14. Why is production leveled in a lean system?

To create a unified workload in all work centers

18. According to the lean philosophy, it is required to maintain a stable master production schedule to reduce the work-in-process inventories.

True

19. Value Stream Maps are similar to flowcharts and are used for identifying the waste and non-value added steps in the current process.

True

10. The ideal setup time for a lean system is:

0

11. The ideal lot size for a lean system is:

1

20. Kaizen events typically take between 1 to 2 months.

20. Kaizen events typically take between 1 to 2 months.

12. If it takes 100 minutes to complete a circuit, demand at the next work center is 5 parts per minute, and a container will hold 20 parts, how many containers are required?

25

9. Which of the following is not required for a lean system?

A type II MRP System

15. Reduction of setup time is accomplished by separating internal and external setups and:

Converting internal set up time to external set up time

4. A successful implementation of a lean system requires:

Gaining cooperation of workers, balancing fabrication rates with final assembly production rates

13. The principal objective of a lean system is:

Improve the ROI of the firm

7. Reducing setup time is important because it:

Increase Available capacity, Increase Flexibility, Reduce Inventory

1. Under lean, the ROI is increased by:

Increase in Rev, Less Investment

2. Which of the following is not an element of lean?

Modularized Master Schedule

3. A kanban card is used to signal that:

Parts are needed by the subsequent station

5. For production control, lean systems are best suited for

Repetitive manufacturing

17. External setups refer to actions that require stoppage of the production process.

False

6. With regards to suppliers, lean systems typically require:

Long term relationships and commitment


Kaugnay na mga set ng pag-aaral

Management 350 Exam #1 Practice Questions

View Set

Writing an Informative Essay about Making Sacrifices Eng 2 answer keys

View Set

Biology 111G Chapter 20 concept checks and end of chapter review

View Set

Geography Chapter 15, River Systems

View Set

E2: Clinical Biochemistry CH7 & CH10

View Set

HNF 150 Exam #1 Body Basics, Digestion, Digestive Diseases, and Alcohol

View Set