Testing 3

Pataasin ang iyong marka sa homework at exams ngayon gamit ang Quizwiz!

953: A project that is in the implementation phase is six weeks behind schedule. The delivery date for the product is four months away. The project is not allowed to slip the delivery date or compromise on the quality standards established for his product. Which of the following actions would bring this project back on schedule? A. Eliminate some of the requirements that have not yet been implemented. B. Add more engineers to the project to make up for lost work. C. Ask the current developers to work overtime until the lost work is recovered. D. Hire more software quality assurance personnel.

A

957: The software engineer's role in tool selection is A. To identify, evaluate, and rank tools, and recommend tools to management B. To determine what kind of tool is needed, then find it and buy it C. To initiate the tool search and present a case to management D. To identify, evaluate and select the tools

A

968: Which of the following statements are TRUE for informal reviews?I. Easy to get started and have some benefit II. Have no or minimal formal process III. The process must be documented IV. May include "paired programming" A. I, II and IV B. I and III C. III and IV D. I, III and IV

A

988: What statement about expected outcomes is FALSE: A. Expected outcomes are defined by the software� s behaviour B. Expected outcomes are derived from a specification, not from the code C. Expected outcomes include outputs to a screen and changes to files and databases D. Expected outcomes should be predicted before a test is run E. Expected outcomes may include timing constraints such as response times

A

992: The structure of an incident report is covered in the Standard for Software Test Documentation IEEE 829 and is called as: A. Anomaly Report B. Defect Report C. Test Defect Report D. Test Incident Report

A

993: Evaluating testability of the requirements and system are a part of which phase:- A. Test Analysis and Design B. Test Planning and control C. Test Implementation and execution D. Evaluating exit criteria and reporting

A

997: A piece of software has been given _______what tests in the Following will you perform? 1) Test the areas most critical to business processes 2) Test the areas where faults will be maximum 3) Test the easiest functionalities A. 1&2 are true and 3 is false. B. 1,2&3 are true. C. 1 is true, 2&3 are false. D. 1&2 are false, 3 is true

A

998: Which of the following is a type of non-functional testing? A. Usability testing. B. Statement Coverage. C. Dataflow testing. D. Cause-effect graphing.

A

955: The ___________ technique can be used to achieve input and output coverage A. Boundary value analysis B. Equivalence partitioning C. Decision table testing D. State transition testing

B

959: A Test Plan Outline contains which of the following: i. Test Items ii. Test Scripts iii. Test Deliverables iv. Responsibilities A. i,ii,iii are true and iv is false B. i,iii,iv are true and ii is false C. ii,iii are true and i and iv are false D. i,ii are false and iii , iv are true

B

960: Which of the following is not a major task of Exit criteria? A. Checking test logs against the exit criteria specified in test planning. B. Logging the outcome of test execution. C. Assessing if more tests are needed. D. Writing a test summary report for stakeholders

B

962: Verification involves which of the following :- i. Helps to check the Quality of the built product ii. Helps to check that we have built the right product. iii. Helps in developing the product iv. Monitoring tool wastage and obsoleteness. A. Options i,ii,iii,iv are true. B. i is true and ii,iii,iv are false C. i,ii,iii are true and iv is false D. ii is true and i,iii,iv are false.

B

963: In a risk-based approach the risks identified may be used to : i. Determine the test technique to be employed ii. Determine the extent of testing to be carried out iii. Prioritize testing in an attempt to find critical defects as early as possible. iv. Determine the cost of the project A. ii is True; i, iii, iv & v are False B. i,ii,iii are true and iv is false C. ii & iii are True; i, iv are False D. ii, iii & iv are True; i is false

B

965: Static analysis tools are typically used by A. Testers B. Developers C. Testers & Developers D. None

B

967: Test Case are grouped into Manageable (and scheduled) units are called as A. Test Harness B. Test Suite C. Test Cycle D. Test Driver

B

969: Which of the following statements describes a key principle of software testing? A. Automated tests allow better statements of confidence about the quality of software products. B. For a software system, it is normally impossible to test all the input and output combinations. C. Exhaustive software testing is, with enough effort and tool support, feasible for all software. D. The purpose of software testing is demonstrating the absence of defects in software products.

B

972: Which of the following are good candidates for manual static testing? A. Requirement specifications, test plan, code, memory leaks. B. Requirement specifications, test cases, user guides. C. Requirement specifications, user guides, performance. D. Requirement specifications, website, code, use cases.

B

973: ________is a very early build intended for limited distribution to a few key customers and to marketing for demonstration purposes. A. Alpha release B. Beta release C. Test release document D. Build

B

976: Incorrect form of Logic coverage is: A. Statement Coverage B. Pole Coverage C. Condition Coverage D. Path Coverage

B

980: Test are prioritized so that: A. You shorten the time required for testing B. You do the best testing in the time available C. You do more effective testing D. You find more faults

B

984: Which expression best matches the following characteristics or review processes: 1. Led by author 2. Undocumented 3. No management participation 4. Led by a trained moderator or leader 5. Uses entry exit criteria s) Inspection t) Peer review u) Informal review v) Walkthrough A. s = 4, t = 3, u = 2 and 5, v = 1 B. s = 4 and 5, t = 3, u = 2, v = 1 C. s = 1 and 5, t = 3, u = 2, v = 4 D. s = 5, t = 4, u = 3, v = 1 and 2 E. s = 4 and 5, t = 1, u = 2, v = 3

B

985: Given the following types of tool, which tools would typically be used by developers and which by an independent test team: i. Static analysis ii. Performance testing iii. Test management iv. Dynamic analysis v. Test running vi. Test data preparation A. Developers would typically use i, iv and vi; test team ii, iii and v B. Developers would typically use i and iv; test team ii, iii, v and vi C. Developers would typically use i, ii, iii and iv; test team v and vi D. Developers would typically use ii, iv and vi; test team I, ii and v E. Developers would typically use i, iii, iv and v; test team ii and vi

B

989: Which of the following helps in monitoring the Test Progress: i. Percentage of Test Case Execution ii. Percentage of work done in test environment preparation. iii. Defect Information e.g. defect density, defects found and fixed iv. The size of the testing Team and skills of the engineers A. iv is correct and i,ii,iii are incorrect B. i,ii,iii are correct and iv is incorrect C. i,ii are correct and iii,iv are incorrect D. i,iv are correct and ii , iii are incorrect

B

954: Use cases can be performed to test A. Performance testing B. Unit testing C. Business scenarios D. Static testing

C

956: The __________ testing is performed at the developing organization� s site A. Unit testing B. Regression testing C. Alpha testing D. Integration testing

C

958: Which is not the software characteristics A. Reliability B. Usability C. Scalability D. Maintainability

C

961: In a Examination a candidate has to score minimum of 24 marks inorder to clear the exam. The maximum that he can score is 40 marks. Identify the Valid Equivalance values if the student clears the exam. A. 22,23,26 B. 21,39,40 C. 29,30,31 D. 0,15,22

C

964: Hand over of Testware is a part of which Phase A. Test Analysis and Design B. Test Planning and control C. Test Closure Activities D. Evaluating exit criteria and reporting

C

966: The specification which describes steps required to operate the system and exercise test cases in order to implement the associated test design A. Test Case Specification B. Test Design Specification C. Test Procedure Specification D. None

C

971: Which rule should not be followed for reviews A. Defects and issues are identified and corrected B. The product is reviewed not the producer C. All members of the reviewing team are responsible for the result of the review D. Each review has a clear predefined objective

C

975: Which of the following tools would be involved in the automation of regression test? A. Data testerB. Boundary tester C. Capture/Playback D. Output comparator.

C

977: Code Coverage is used as a measure of what? A. Defects B. Trends analysis C. Test Effectiveness D. Time Spent Testing

C

982: Equivalence partitioning is: A. A black box testing technique used only by developers B. A black box testing technique than can only be used during system testingC. A black box testing technique appropriate to all levels of testing D. A white box testing technique appropriate for component testing

C

983: Which of the following is the main purpose of the integration strategy for integration testing in the small? A. To ensure that all of the small modules are tested adequately B. To ensure that the system interfaces to other systems and networks C. To specify which modules to combine when and how many at once D. To ensure that the integration testing can be performed by a small team E. To specify how the software should be divided into modules

C

987: What can static analysis NOT find?A. The use of a variable before it has been defined B. Unreachable ("dead") code C. Whether the value stored in a variable is correct D. The re-definition of a variable before it has been used E. Array bound violations

C

990: Which of the following is true about White and Black Box Testing Technique:- A. Equivalence partitioning, Decision Table and Control flow are White box Testing Techniques. B. Equivalence partitioning, Boundary Value Analysis , Data Flow are Black Box Testing Techniques. C. Equivalence partitioning , State Transition , Use Case Testing are black box Testing Techniques. D. Equivalence Partitioning, State Transition, Use Case Testing and Decision Table are White Box Testing Techniques.

C

991: Which of the following is not phase of the Fundamental Test Process? size=2 face=Arial> A. Test Planning and Control B. Test implementation and Execution C. Requirement Analysis D. Evaluating Exit criteria and reporting

C

994: Which of the following is NOT part of a high level test plan? A. Functions not to be tested. B. Environmental requirements. C. Analysis of Specifications. D. Entry and Exit criteria.

C

999: Exclusive use of white box testing in a test-phase will: A. Ensure the test item is adequately tested. B. Make the need for black-box testing redundant. C. Run the risk that the requirements are not satisfied. D. Suffices for the unit testing phase.

C

1000: In a system designed to work out the tax to be paid: An employee has $4000 of salary tax free. The next $1500 is taxed at 10% The next $28000 is taxed at 22% Any further amount is taxed at 40% To the nearest $ which of these is a valid Boundary Value Analysis test case? A. $1500 B. $32001 C. $28000 D. $33501

D

970: Testing with out a real plan and test cases is called --- A. Gorilla testing B. Monkey testing C. Adhoc testing D. All of the above

D

974: Which of the following could be a disadvantage of independent testing? A. Developer and independent testing will overlap and waste resources. B. Communication is limited between independent testers and developers. C. Independent testers are too slow and delay the project schedule. D. Developers can lose a sense of responsibility for quality

D

978: Which one of the following are non-functional testing methods? A. System testing B. Usability testing C. Performance testing D. Both B & C

D

979: Which of the following could be a reason for a failure 1) Testing fault 2) Software fault 3) Design fault 4) Environment Fault 5) Documentation Fault A. 2 is a valid reason; 1,3,4 & 5 are not B. 1,2,3,4 are valid reasons; 5 is not C. 1,2,3 are valid reasons; 4 & 5 are not D. All of them are valid reasons for failure

D

981: Which of the following statements about component testing is not true? size=2 face=Arial> A. Component testing should be performed by development B. Component testing is also know as isolation or module testing C. Component testing should have completion criteria planned D. Component testing does not involve regression testing

D

986: Which of the following statements is NOT true: A. Inspection is the most formal review process B. Inspections should be led by a trained leader C. Managers can perform inspections on management documents D. Inspection is appropriate even when there are no written documents E. Inspection compares documents with predecessor (source) documents

D

995: If a candidate is given an exam of 40 questions, should get 25 marks to pass (61%) and should get 80% for distinction, what is equivalence class. A. 23, 24, 25 B. 0, 12, 25 C. 30, 36, 39 D. 32,37,40

D

996: One of the following is not a part of white box testing as per BS7925-II standards. A. Random testing B. Data Flow testing. C. Statement testing. D. Syntax testing

D


Kaugnay na mga set ng pag-aaral

Exam4-Anticoagulants - EvolveQuestions&StudyGuide

View Set

Stat in Behavioral Science Exam #2

View Set

NUR316 Exam 1 Practice questions

View Set

AC final (Homework assignments and Quizzes)

View Set

African American History Final Exam Review

View Set