Ch. 12 - Lean Supply Chains

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

whats constitutes a non-value-added actictivity?

any activity that does not have customer value = consumer is not willing to pay for it

waste:

anything that does not add value from the customer's perspective

computer (other kanban approaches)

computer systems integrated with ERPs

Kaizen

concept of continuous improvement

value chain

each step in the supply chain should create value

lean production does two major things

eliminates waste in production effort coordinates the timing of production (parts arrive "just in time")

quality at the source

factory workers are personally responsible for the quality of their output and become their own quality inspectors factory workers are empowered to do their own maintenance poka-yoke devices

Toyota Production System

focus on continuous improvement elimination of waste respect for people

lean layouts (design principles)

group technology quality at the source JIT production

Lean production

integrated activities designed to achieve high-volume production using minimal inventories (raw materials, work in process, and finished goods) identifies and eliminates waste (non-value-added activities) through continuous improvement by flowing through downstream demand pull

Respect for people (Toyota production)

level payrolls lifetime employment cooperative employee unions quality circles (teams)

kanban squares (other kanban approaches)

marked spaces on the floor to identify where material should be stored

level schedule

one that requires material pulled in a pattern uniform enough to allow production to respond to pull signals

things that could constitute waste

overproduction waiting transportation inventory processing waste (over-processing) motion defects

Just-in-Time (JIT) Production

producing what is needed when needed and nothing more anything over the minimum is waste ideal lot size is "one" vendors ship several times a day exposes problems otherwise hidden by inventory

work/collaborate with suppliers (lean supply chains)

reduce lead times frequent deliveries project usage requirements - create level production scheduling quality expectations

Minimized Setup Times through Kanban

reductions in setup and changeover times are necessary to achieve a smooth flow kanban reduces setup cost organization will strived for a lot size of one

setting up a kanban system

requires determining the number of Kanban cards/containers needed need to know lead time

external setups

setup operations that can be completed while the machine is running, such as transporting dies, gathering parts

internal setups

setup operations that can be performed only when the machine is stopped - such as mounting or removing dies

specialized plants (lean supply chains)

small specialized plants rather than large vertically integrated manufacturing facilities can be constructed and operated cheaper

uniform plant loading

smoothing the production flow to dampen the reaction waves that normally occur from schedule variations "slow and steady" approach that takes more time but reduces chance of error

lean supply chains (design principles)

specialized plants work with suppliers building a lean supply chain

freeze windows

that period of time during which the schedule is fixed and no changes are possible

container system (other kanban approaches)

the container is used as a signal device

waste created by uncertainty with service operation(s)

uncertainty in task times uncertainty in demand customers' production roles

mass production characteristics

*at odds/in conflict with Lean Concepts* large, specialized equipment production in large lot sizes push system

single minute exchange of die (SMED)

A goal to reduce the setup time to a single-digit number of minutes

lean suppliers (lean focused supply chain)

Able to respond to changes Lower prices Higher quality

lean warehousing (lean focused supply chain)

Eliminate non-value-added steps and waste in storage process

lean production is also called:

JIT Production Toyota Production

pull system

a workstation pulls material from the preceding station as it is needed

kanban production control systems

Kanban means "sign" or "instruction card" in Japanese Cards or containers are used Make up the Kanban pull system

lean procurement (lean focused supply chain)

Key is automation (e-procurement) Suppliers must see into the customers' operations and customers must see into their suppliers' operation

components of a lean focused supply chain

Lean suppliers Lean procurement Lean warehousing Lean logistics Lean customers

Focused factory networks (specialized plants)

*minimize waste* small specialized plants that limit the range of products produced

Lean Logistics (lean focused supply chain)

-Optimized mode selection and pooling orders -Combined multi-stop truckloads -Optimized routing -Cross docking -Import/export transportation processes -Backhaul minimization

lean concepts

Plant layout is designed to ensure balanced work flow with a minimum of WIP inventory Preventive maintenance is emphasized to avoid downtime.

Value Stream (lean supply chains)

The value-adding and non-value-adding activities required to design, order, and provide a product or service used to analyze where value is or is not being added as material flows through a process

group technology

a philosophy in which similar parts are grouped into families the processes required to make the parts are arranged in a manufacturing cell preventative maintenance, eliminated movement and queue time between operations, reduces inventory, and reduces employees

colored golf balls (other kanban approaches)

each golf ball signals production of a different item

each container represents what (Kanban)?

the minimum production lot size

waste reduction (lean supply chains)

the optimization of the value-adding activities and the elimination of non-value-adding activities

lean customers (lean focused supply chain)

understand their business needs value speed and flexibility establish effective partnerships with suppliers

lean production schedules (design principles)

uniform plant loading kanban production control system


Ensembles d'études connexes

Chapter 25 The Urinary System Exam

View Set

Medical Term. Chapter 6 Practice

View Set

Chapter 10: The Seafloor and Continental Margins

View Set

Love and romantic relationships - chapter 7

View Set