Chapter 27 programmable controllers
A ____ voltage tester (wiggy) must never be used to measure voltage levels on a programmable controller
Vibrating
Electrical _____ is unwanted signals that are present on a power line
Noise
A(n) ____ operation is an operation that has feedback from the output to the input
Closed loop
______ programming is the use of a PC to program a programmable controller that is not in run mode
Off line
The input status indicator located on the input module should turn off and the input symbol should no longer be highlighted in the control circuit on the monitor screen when an NC input device is ____
Open
A ____ can be used if a control system requires remote monitoring, HMIs,data acquisition of process conditions, motion control, servo/stepper motor control, and/ or vision control
PAC
In general, a _____ is considered the first choice for controlling industrial electrical circuits and systems
PLC
A PLC consists of a power supply, _____ section, input section, and output section
Processor
The ____ section is the brain of a programmable controller and can be referred to as the central processing unit(CPU)
Processor
In the ____ mode of a programmable controller, a circuit is monitored and the program is edited, changed, saved, and transferred
Program
A _____ diagram is a line diagram that better matches the language of the programmable controller
Programming
The leakage current problem caused by using a two-wire thyristor output can be corrected by placing a load ____ across the device
Resistor
_____ time is the time it takes a programmable controller to make a sweep of the program
Scan
To aid interfacing and monitoring a programmable- based system, a(n) ____ port is used for monitoring and programming a system using a computer
Serial
A typical controller scan starts in the ____ corner of the line diagram
Upper left
A(n) ____ bit is the controlled contact (or output) that changes from open or closed (OFF to ON) after the preset time (or number of counts) has been reached
Done
Care must be taken when using the _____ command because it overrides all safety features designed for the program
Force
A programmable controller's ____ lamp should normally be energized
Forced I/O
A programmable controller's power supply may provide power for the _____ modules
I/O
Most hardware problems are found in the _____ sections of the controller and usually can be found using standard DMMs
I/O
A(n) ____ circuit is used to suppress a voltage spike
Snubber
Every time an I/O device in a programmable controller is programmed, the device must be assigned a(n) ____
Adress
______ processing blends sequential, step-by-step functions with continuous closed-loop control
Batch
When an output device does not operate, the problem may lie in the output module, output device, or _____
Controller
A(n) _____ file is a group of data values, such as inputs, timers, counters, and outputs, that are displayed as a group and whose status may be monitored
Data
Examples of ____ inputs are potentiometers, rheostats, encoders, bar code readers, and temperature, level, pressure, humidity, and wind speed transducers
Data
_____ I/Os are the most common inputs and outputs
Discrete
Like PLCs, PLRs are designed to be programmed using ___ programming or function blocks
Line
The first programmable controllers used _____ diagrams as a language to input information
Line
The main advantage of programmable _____ is that they combine the latest technologies, programming methods, and communication networks of PCs with the latest technologies of PLCs
Logic relays
The first programmable controllers where developed to eliminate individual control relays and _____ by consolidating them into one unit that could be programmed and reprogrammed as required by the application
Timers