Chapter 9 - Systems Development

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

Types of Feasibility

Economic - cost-effetivness Operational - solve problems, meet requirements Schedule - completed on time? Technical - practicality, resources available. Political - will it be accepted? Legal - implement within obligations and constraints.

Balance of the triple constraint

If one changes, one or more will be affected.

Methods for gathering business requirements

Joint Application Development (JAD) session, interveiws, questionaires/surveys, observations, business reports.

Types of implementation

Parallel Plunge Pilot Phased

Primary reasons projects fail

Unclear or missing business requirements. Skipped SDLC phases. Changing technology. The cost of finding errors. Balance of the triple constraints.

agile methodology

aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process using the bare minimum requirements. Fast and efficient, lower cost and fewer features. Rapid feedback and room for adjustments

Outsourcing

an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house.

legacy system

an old system that is fast approaching or beyond it's useful life within an organization

web service

an open-standards way of supporting interoperability. Web services are application programming interfaces (API) that can be accessed over a network, such as the Internet, and executed on a remote system hosting the requested services.

computer-aided software engineering (CASE)

are software suites that automate systems analysis, design, and development.

Planning Phase

establishes a high-level plan of the intended project and determines project goals. Activities include Brainstorming, Prioritizing and choosing projects, setting project scope and developing the project plan.

design phase

establishes descriptions of the desired features and operations of the system, including screen layouts, business rules, process diagrams, pseudocode, and other documentation.

object oriented languages

group data and corresponding processes into objects

Waterfall methodology

oldest and best known methodology. a sequence of phases in which the output of each phase becomes the input for the next (see Figure 9.11). In the SDLC, this means the steps are performed one at a time, in order, from planning through implementation and maintenance. Inflexible and expensive

Rational Unified Process (RUP)

owned by IBM, provides a framework for breaking down the development of software into four gates.

critical path

the sequence of activities that determine the earliest date by which the project can be completed.

6 types of testing

Alpha Testing Development Testing Integration Testing System testing User acceptance testing unit testing

outsourcing models

Onshore outsourcing—engaging another company within the same country for services. Nearshore outsourcing—contracting an outsourcing arrangement with a company in a nearby country. Often this country will share a border with the native country. Offshore outsourcing—using organizations from developing countries to write code and develop systems. In offshore outsourcing the country is geographically far away.

Steps of SDLC

Planning Analysis Design Development Testing Implementation Maintenence

In-Sourcing (in-house development)

uses the professional expertise within an organization to develop and maintain its information technology systems.

PERT chart

(Program Evaluation and Review Technique) chart is a graphical network model that depicts a project's tasks and the relationships between them.

Advantages of prototyping

- encourages user participation. - Prototypes evolve through iteration, which supports change better. - have a physical quality allowing users to see, touch, and experience the system as it is developed. - tend to detect errors earlier. - accelerates the phases of the SDLC, helping to ensure success.

Disadvantages of the waterfall methodology

- flaws in identifying problems will be carried through - unexpected contingencies can mess up plan - Assumes it can fix all problems in advanced which is not realistic

Gates of RUP

1. Inception 2. Elaboration 3. Construction 4. Transition

Common Reasons for Outsourcing

Core competencies. Many companies have recently begun to consider outsourcing as a way to acquire best-practices and the business process expertise of highly skilled technology resources for a low cost. Technology is advancing at such an accelerated rate that companies often lack the technical resources required to keep current. Financial savings. It is far cheaper to hire people in China and India than pay the required salaries for similar labor in the United States. Rapid growth. Firms must get their products to market quickly and still be able to react to market changes. By taking advantage of outsourcing, an organization can acquire the resources required to speed up operations or scale to new demand levels. The Internet and globalization. The pervasive nature of the Internet has made more people comfortable with outsourcing abroad as India, China, and the United States become virtual neighbors.

Gates (in detail)

Gate one: inception. This phase ensures that all stakeholders have a shared understanding of the proposed system and what it will do. Gate two: elaboration. This phase expands on the agreed-upon details of the system, including the ability to provide an architecture to support and build it. Gate three: construction. This phase includes building and developing the product. Gate four: transition. Primary questions answered in this phase address ownership of the system and training of key personnel.

Outsourcing Benefits

Increased quality and efficiency of business processes. Reduced operating expenses for head count and exposure to risk for large capital investments. Access to outsourcing service provider's expertise, economies of scale, best practices, and advanced technologies. Increased flexibility for faster response to market changes and less time to market for new products or services.

Types of system reports

Internal report Detailed internal report Summary internal report Exception reporting Information System Control Report Information System audit report post-implementation report

Outsourcing Challenges

Length of contract. Most companies look at outsourcing as a long-term solution with a time period of several years. Training and transferring resources around the globe is difficult and expensive, hence most companies pursuing offshore outsourcing contract for multiple years of service. The following are a few of the challenges facing the length of the contract: It can be difficult to break the contract. Forecasting business needs for the next several years is challenging and the contract might not meet future business needs. Recreating an internal MIS department if the outsource provider fails is costly and challenging. Threat to competitive advantage. Many businesses view MIS as a competitive advantage and view outsourcing as a threat because the outsourcer could share the company's trade secrets. Loss of confidentiality. Information on pricing, products, sales, and customers can be a competitive asset and often critical for business success. Outsourcing could place confidential information in the wrong hands. Although confidentiality clauses contained in the contracts are supposed to protect the company, the potential risk and costs of a breach must be analyzed.

Primary Forms of Agile Metholdology

Rapid prototyping or rapid application development methodology. Extreme programming methodology. Rational unified process (RUP) methodology. Scrum methodology.

Types of Organizational Projects

Sales Marketing Finance Accounting MIS

Service-Oriented Architecture (SOA)

a business-driven enterprise architecture that supports integrating a business as linked, repeatable activities, tasks, or services. SOA ensures that MIS systems can adapt quickly, easily, and economically to support rapidly changing business needs. SOA promotes a scalable and flexible enterprise architecture that can implement new or reuse existing MIS components, creating connections among disparate applications and systems.

software engineering

a disciplined approach for constructing information systems through the use of common methods, techniques, or tools.

Project plan

a formal, approved document that manages and controls the entire project.

dependency

a logical relationship that exists between the project tasks, or between a project task and a milestone.

Extensible Markup Language (XML)

a markup language for documents, containing structured information. The technical specifics of XML's capabilities go beyond the scope of this book, but for our purposes, they support things such as ebusiness transactions, mathematical equations, and a thousand other kinds of structured data.

prototyping

a modern design approach by which the designers and system users use an iterative approach to building the system.

Change Agent

a person or event that is the catalyst for implementing major changes for a system to meet business changes.

scripting language

a programming method that provides for interactive modules to a website

Control objects for Information and related technology (COBIT)

a set of best practices that helps an organization maximize the benefits of an information system, at the same time establishing appropriate controls to ensure minimum errors.

methodology

a set of policies, procedures, standards, processes, practices, tools, techniques, and tasks that people apply to technical and management challenges. Firms use a methodology to manage the deployment of technology with work plans, requirements documents, and test plans, for instance. A formal methodology can include coding standards, code libraries, development practices.

Gantt Chart

a simple bar chart that lists project tasks vertically against the project's time frame, listed horizontally

SOA Service

a simple business task

Project

a temporary activity a company undertakes to create a unique product, service, or result.

kill-switch

a trigger that enables a project manager to close the project before completion.

Project manager

an individual who is an expert in project planning and management, defines and develops the project plan, and tracks the plan to ensure that the project is completed on time and on budget. The project manager is the person responsible for executing the entire project and defining the project scope that links the project to the organization's overall business goals.

Extreme programming (XP)

breaks a project into four phases, and developers cannot continue to the next phase until the previous phase is complete. The delivery strategy supporting XP is that the quicker the feedback the more improved the results. XP has four basic phases: planning, designing, coding, and testing.

testing phase

brings all the project pieces together into a special testing environment to eliminate errors and bugs and verify that the system meets all the business requirements defined in the analysis phase

discovery prototyping

builds a small-scale representation or working model of the system to ensure that it meets the user and business requirements.

iterative development

consists of a series of tiny projects. It has become the foundation of multiple agile methodologies

bugs

defects of the code in an information system

Project scope

describes the business need (the problem the project will solve) and the justification, requirements, and current boundaries for the project.

test conditions

detail the steps the system must perform along with the expected result of each step

Rapid Application Development (RAD)

emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system, to accelerate the systems development process

analysis phase

firm analyzes its end-user business requirements and refines project goals into defined functions and operations of the intended system. Activities include gathering business requirements and defining restraints.

Data Flow Diagram (DFD)

illustrates the movement of information between external entities and the processes and data stores within the system

process modeling

involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment. One of the most common diagrams used in process modeling is the data flow diagram

Preventative maintenance

makes system changes to reduce the chance of future system failure.

Corrective Maintenance

makes system changes to repair design flaws, coding errors, or implementation issues.

software customization

modifies software to meet specific user or business requirements

Maintenance Phase

organization performs changes, corrections, additions, and upgrades to ensure that the system continues to meet business goals. This phase continues for the life of the system because the system must change as the business evolves and its needs change, which means conducting constant monitoring, supporting the new system with frequent minor changes (for example, new reports or information capturing), and reviewing the system to be sure it is moving the organization toward its strategic goals.

requirements definition document

prioritizes all of the business requirements by order of importance to the company. Users must sign off on all requirements.

fourth generation languages

programming languages that look similar to human languages. For example, a typical 4GL command might state, "FIND ALL RECORDS WHERE NAME IS 'SMITH'."

off-the-shelf application software

supports general business processes and does not require any specific software customization to meet the organization's needs

Project management

the application of knowledge, skills, tools, and techniques to project activities to meet project requirements

Loose Coupling

the capability of services to be joined on demand to create composite services or disassembled just as easily into their functional components.

Interoperability

the capability of two or more computer systems to share data and resources, even though they are made by different manufacturers.

feasibility

the measure of the tangible and intangible benefits of an information system.

Implementation phase

the organization places the system into production so users can begin to perform actual business operations with it. In this phase, the detailed user documentation is created that highlights how to use the system and how to troubleshoot issues or problems. Training is also provided

Systems development life cycle (SDLC)

the overall process for developing information systems, from planning and analysis to implementation and analysis. The SDLC is the foundation for all systems development methods, and hundreds of activities are associated with each phase. These activities typically include determining budgets, gathering system requirements, and writing detailed user documentation.

requirements management

the process of managing changes to the business requirements throughout the project. Projects are typically dynamic in nature, and change should be expected and anticipated for successful project completion.

conversion

the process of transferring information from a legacy system to a new system

business requirements

the specific business requests the system must meet to be successful, so the analysis phase is critical because business requirements drive the entire systems development effort.

development phase

transforms all the detailed design documents from the design phase into the actual system. In this phase, the project transitions from preliminary designs to actual physical implementation

Scrum Methodology

uses small teams to produce small pieces of software using a series of sprints, or 30-day intervals, to achieve an appointed goal.


Ensembles d'études connexes

Spreadsheets and Concept Application: Lecture 14- Goal Seek, Solver and Regression

View Set

Life Insurance Policy Provisions

View Set

Financial Management Test 1 Chapter 1

View Set

Ch 1-2 Quiz, Ch. 3 & 4, ch 7 and 8, ch 5, ch 6 MGMT, ch 9

View Set

Chapter 7 - Contractual Capacity

View Set