construction management

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

How many contracts does a typical Design-Bid-Build project delivery method have?

2

AIA Contract Document A____ is titled General Conditions of the Contract for Construction

201

What is the project duration for a typical single-family home?

3-6 months

CSI MasterFormat 2004 is a ___ - digit numbering system.

6

Contract _____________ is all about the "red tape" and paperwork associated with a construction project. For example: reports, submittals, shop drawings, time cards, payroll records, change orders, inspection reports, and numerous other documents that must be processed.

Administration

_______________ is a fee-based service in which the construction manager is responsible exclusively to the owner and acts in the owner's best interests at every stage of the project.

Agency CM

___________ drawings are record drawings completed by the contractor and turned over to the owner at the end of the project identifying any changes or adjustments made to the conditions and dimensions of the work relative to the original plans and specifications.

As-built

____________ is a project delivery method where the construction manager acts as a consultant to the owner in the development and design phases but as the equivalent of a general contractor during the construction phase.

CM at Risk

Although many other industries assist in creating the built environment, who ultimately delivers it?

Construction

______________ ______________ entails the planning, scheduling, evaluation, and controlling of construction tasks or activities to accomplish specific objectives by effectively allocating and utilizing appropriate labor, materials, and time resources in a manner that minimizes costs and maximizes customer/owner satisfaction.

Construction Management

__________ Documents are the drawings, conditions, terms, and specifications setting forth the requirements for constructing the project.

Contract

______________ Documents may also be referred to as working drawings because they are the plans (along with the final specifications) that the builder will actually use for construction.

Contract

Who is not part of the on-site construction management team:

Contract Administration

Who typically handles the task of getting the building permit?

Contractor

What are the four basic types of construction contracts?

Cost - Plus - Fee Unit Cost Guaranteed Maximum Price Lump Sum

Under a ______________ contract the owner reimburses the contractor for all actual costs associated with the work plus a fixed fee or percentage of the cost.

Cost-Plus-Fee

_________________ is a project delivery method in which there is only one contract between the owner and the design-build entity.

Design - Build

Select two examples of Integrate Project Delivery Methods?

Design - Build CM At-Risk

Select the three basic project delivery methods:

Design - Build Design - Bid - Build (Traditional) CM At-Risk

__________________ is the process of identifying any problems or areas of concern that exist so that those problems can be factored into the decision making that takes place during the pre-construction stage.

Due Diligence

Four steps to the design process: Programming and Feasibility Schematic Design Design Development Construction Documents

False

_____________ Construction is highly specialized in the creation of manufacturing plants, oil refineries and electrical generating facilities.

Industrial

_____________ Project Delivery is any project delivery method that contractually engages the contractor responsible for constructing the project at the beginning of the design process.

Integrated

___________ contracts are an agreement in which the contractor agrees to complete the work specified in the plans and specs for a single fixed amount of money.

Lump Sum

What is the title of CSI MasterFormat 2004 division number 04?

Masonry

________________ is a contracting methodology in which the owner bypasses the use of a general contractor and enters into multiple separate contracts with trade or specialty contractors for the various sections of the work associated with the project.

Multiple Prime

Strategy = _______

Plan

What are the four basic types of drawings that can be used to communicate the intent of the design.

Plans, Elevation, Sections, Details

Issues that cause cost overruns and schedule fiascos include: (Select four of the five answers)

Poorly managed subcontractor coordination Serious job site accidents Low productivity Delayed material deliveries

The quality of the contract documents will impact the quality of the __________.

Pricing

__________ contractor, enters into a contract with the owner to deliver the construction project in accordance with the plans and specifications that have been prepared by the architects and engineers.

Prime

________ means to buy or obtain.

Procure

Which general categories of individual home builders constructs almost 80 percent of the homes in the United States?

Production Builders

What are the two types of owners?

Public & Private

This course is designed to be engaging, interesting and helpful by utilizing 4 instructional design components

Reading Reflecting Doing Displaying

What does RFI stand for? ______ ______ ______

Request for information

What are the 5 basic sectors of the construction industry?

Residential Commercial Heavy Civil Industrial Environmental

______________ must be the foundation upon which all other values are placed; without it the whole project is at risk.

Safety

It's important to understand the discipline or profession of construction management is usually delivered by a construction management __________.

Team

The Project Delivery Methods differ in 5 fundamental ways. Select Five below.

The Number of contracts the owner executes The ability to overlap design and construction The relationship and roles of each party (player) to the contract Who warrants the sufficiency of the plans and specifications The point in which the contractor gets involved

Traditional Services by CM TEAM (select four):

Time Cost Safety Quality

The primary objective/goal of the construction management functions is to control three main factors/values: ____________, ____________, ____________.

Time, Cost, Quality

Architects deal with the function, life safety issues, and aesthetics of the building, and engineers deal with the systems.

True

Construction Project Managers are often accountable for more than one job at a time.

True

Construction operations must address these issues: Subcontractor coordination Material and equipment deliveries Productivity Coordination with outside agencies Job site safety Quality control

True

Does AIA stand for The American Institute of Architects?

True

Does CSI stand for the Construction Specifications Institute?

True

Does funding for commercial building projects come from: private, public, or combined in a special private-public partnership?

True

Most construction managers will tell you that job startup and job closeout are the two most difficult processes to manage.

True

The Design and Construction Stages are: Design Pre-construction Procurement Construction Post-construction

True

The Project Delivery Process ("Game Plan") determines how the players will interact and communicate with one another over the course of the project

True

The contractor and subcontractors are only responsible for the work spelled out in the plans and specs.

True

The trend in project delivery and the industry of construction management is for more collaborative methods of construction.

True

Value engineering is a thorough analysis of the design, products, and materials and their application, installation, and execution to determine whether they proposed design solutions are really the best solution relative to their cost.

True

____________ Conditions are unknown physical conditions at the site that were not anticipated by the owner or the contractor.

Unforeseen

The documentation used to process changes on a job are called: _____________

change order

Heavy Civil construction projects are typically designed by _________ engineers?

civil

Final step in the construction process is the project _______.

closeout

The _______________ building sector includes banks, schools, office buildings, hotels, shopping malls, religious facilities, baseball stadiums, theaters, universities, amusement parks, hospitals, courthouses, government buildings, and other facilities where people gather.

commercial

_______________ contractors are rarely involved in the sales or marketing or land acquisition components of the project.

commercial

Large single-family production builders can generating annual revenues and profits surpassing those of many large ____________ ____________ companies.

commercial construction

The most basic skill is the ability to read ___________ drawings because the drawings are a communication tool for conveying the work of the contract.

construction

A ________ ____________ may be employed by construction management firms, general contractors, architects, engineers, owners, or specialty contractors. The primary responsibility of the ___________ ____________ is to organize the project team to perform the construction management function that is the topic of this entire book and course

construction manger

Change orders take time to process, and whenever a _____________ decided to proceed without a signed approval; they are taking a chance that they may not get paid for doing the extra work.

contractor

If there are deficiencies in the plans and specs that the contractor bid on; the __________ is entitled to extra compensation for correcting the errors or completing the missing details.

contractor

Storm water pollution is important management task of the onsite construction management team and many states require the ______________ to prepare a storm water pollution prevention plan

contractor

Traditionally, ______________ are not directly involved in the design process unless the project delivery method is design-build or Construction Management.

contractors

What are the three general categories of individual home builders?

custom builders single-family small-volume builders single-family production builders

One way you can mitigate risks on a project by choosing the right project __________ method to start with.

delivery

Project __________ is the process by which all the procedures and components of designing and building a facility are organized and put together in an agreement that results in a completed project.

delivery

Projects happens within a __________ environment where risk is inherent; such as, weather, financial markets, available and qualified labor, etc.

dynamic

Both cost-plus-fee contracts and unit price contracts have a higher risk to the owner because the ___________ of the project is not know until the work is complete

final price

Why is there very little wood used in larger commercial construction projects?

fire-resistant design standards

CM at Risk Delivers projects with what contract type?

guaranteed maximum price guaranteed maximum price

Individuals involved in the environmental construction sector of not only need to be familiar with construction means, methods, and management but also need to be familiar with the ___________.

law

The design and construction of buildings, bridges, and roadways follow a consistent ______path from initial concept to occupancy. We move through the process one step at a time, eventually arriving at the successful delivery of the construction project.

linear

Besides budget what are Owners of a commercial construction project most concerned with?

meeting the schedule

Apartments, condominiums, and townhouses are all referred to as _________ - ________ dwellings.

multi-family

Construction operations is managed by the ___________ construction management team.

on-site

Construction _____________ are the actual work that it takes to build the project

operations

Owners are accountable for four primary duties; select the four below.

overall budget program quantity, extent, and character of the project funding

It is the _________ who ultimately decides which project delivery method to use.

owner

The shortage of skilled workers immediately impacts the ability of the construction manager to deliver a quality product on time and within budget to the_________.

owner

Who are the three principle players on a typical construction project?

owner designer contractor

Construction management team's job is to figure out how to best adjust, manage, and monitor the factors (cost, time, quality, safety, scope, function) in order to optimize the ___________ of the project; relative to the owner's requests.

performance

Every design starts with a ___________; which is a written statement that identifies and describes an owner or end user's needs and requirements for a facility.

program

Heavy Civil projects are usually ____________ funded projects and tend to last for a long time.

publicly

The ___________ contains all of the work items such as minor adjustments, repairs, and work items that must be done before substantial completion can be achieved. The list is prepared jointly by the owner, architect, and contractor.

punch list

A ____________ order is an agreement between a vendor and a customer to provide certain products that meet a particular specification for a specified price.

purchase

The __________ standards on any project are established in the plans and specs prepared by the designer.

quality

Site work deals primarily with site clearing, grading, and excavating and is generally considered considered one of the _________ divisions of work.

riskiest

There is one more important factor that the book discussed beyond time, cost and quality; which is ___________.

safety

The parameters defining the overall extent of work to be included in a construction contract; commonly communicated through construction plans and written specifications.

scope of work

Construction work that is performed with the general contractor's own forces or labor. This is work that is not subcontracted.

self-performing work

Select four differences between residential and commercial construction means and methods?

special construction processes special training required trades equipment needs

The ___________ deal more directly with the construction and they are used in conjunction with the plans and describe in detail that cannot be conveyed by the graphic depictions alone.

specifications

What does SWPPP stand for?

storm water pollution prevention plan

The _______________ must figure out the best way to manage, control, and coordinate all of the subcontractors, labor, materials, tools, equipment, deliveries, inspections, noise, dust, security, safety, quality, cleanup, and even visitors to the site.

superintendent

The ___________ conditions or special conditions usually deal with matters that are project specific.

supplemental

The residential sector requires __________ knowledge in regards to the home building business.

the broadest


Ensembles d'études connexes

14. Tarse postérieur - Ostéologie

View Set

A&p 2-Essay exam 1 Study Guide 3

View Set

Survey of Data Analysis - Chapter 7 Quiz

View Set

Idaho statutes, rules, and regulations common to all lines

View Set

NSG 170 exam 1 (glucose regulation)

View Set