Knowledge Check 6

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

The copy center has a job order that requires 500 pages of white paper and 200 pages of pink paper. The copying rate is 25 pages per minute, the overall setup time is 5 minutes, and the color change time is 2 minutes. The routing for the job also calls for stapling and three-hole drilling (in that order). The time standards are 10 minutes and 20 minutes, respectively. If labor cost is charged on the basis of total standard time multiplied by $6.00 per hour, estimate the cost of this job, including the work in Problem 1.

$6.50 per job Throughput time = 5+(700/25)+2+10+20= 65 minutes (65/60)* $6.00= $6.50

The copy center has a job order that requires 500 pages of white paper and 200 pages of pink paper. The copying rate is 25 pages per minute, the overall setup time is 5 minutes, and the color change time is 2 minutes. What is the hourly copy center capacity to do jobs like this one? (Assume that the setup must be done for every job of this type).

1.5 or more jobs per hour, but less than 2 jobs per hour

Shanice's hair salon is one of the best salons in town. However, Shanice is the only person working in the salon and the process for getting a haircut involves shampooing, cutting and then styling. If it takes Shanice 10 minutes to shampoo, 15 minutes to cut and 20 minutes to style hair, how many haircuts can Shanice do in one 8 hour-shift (assuming that she works continuously, and stops after 8 hours)?

10 haircuts

The copy center has a job order that requires 500 pages of white paper and 200 pages of pink paper. The copying rate is 25 pages per minute, the overall setup time is 5 minutes, and the color change time is 2 minutes. If the job has to wait in queue at the copy work center for 24 minutes, at the stapling work center for 43 minutes, and at the three-hole drilling work center for 17 minutes, what is the throughput time for this job? (These queue times apply only to this question!)

149 minutes Throughput time = 5+(700/25)+2+10+20+24+ 43+17= 149 minutes

The copy center has a job order that requires 500 pages of white paper and 200 pages of pink paper. The copying rate is 25 pages per minute, the overall setup time is 5 minutes, and the color change time is 2 minutes. Suppose the copy center only did jobs exactly like this one (500 white, 200 pink). What would the cycle time be? Assume that different people work in each of the three work centers.

35 minutes

Which of the following is NOT a reason Walmart is effective in managing their supply chain?

Closely guarded demand data for competitive advantag

What are some of advantages to US companies manufacturing themselves as opposed to outsourcing/offshoring the Supply Chain?

Companies can have more control over their operations

Companies in the same industry tend follow the same supply chain design approach.

False

Damien has a wedding invitations printing yes business. He made a typo on the invitation for Alejandro and Kendra's wedding. He only saw the mistake while inspecting the order before mailing out the 100 invitations on behalf of the couple. Consequently, all 100 invitations had to be scrapped (thrown away in the recycle bin) and he had to redo everything. Scraping the 100 invitations is an example of prevention costs for quality management.

False

Optimal cost of quality is reached when prevention costs and appraisal cost are at their lowest point.

False

You wait in line at Starbucks for 5 minutes. It takes 2 minutes for you to place your order of a tall mocha with the cashier and pay. It takes 4 minutes for the barista to make the mocha. The bottleneck in this process is your wait time of 5 minutes.

False

What are the 4Ps of Operations?

People, Place, Processes, and Partnerships

In Operations, what does "Cheap" mean in the phrase "Good Stuff Cheap"?

The product is produced using the fewest resources

What does cycle time mean in terms of Process Analysis?

The time between completion of successive tasks.

In light of COVID-19, fast-food retail establishments are using their websites for mobile orders as opposed to using workers for in-person service. This is an example of a change to Processes as it relates to the 4Ps of Operations.

True

Suppose you are operating a machine that produces only one type of part and the part is produced every 30 seconds (its cycle time). The capacity of your machine in units per hour is 120 units/hour.

True

When a company is able to harvest its own materials, assemble products and sell them directly to the consumer, this is known as vertical integration.

True


Ensembles d'études connexes

Marketing 3310 Connect Chapter 12 Int

View Set

Series 65 Mid Term - Incorrect questions

View Set

Strategic Management 2015 - 2019

View Set

Sources of energy: Advantages and disadvantages

View Set

Chapter 34: Sedative-Hypnotic Drugs

View Set