Lean Six Sigma Green Belt Training - Lean Metrics

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

What Lean Metric considers both scrap and rework in the entire process?

Rolled Throughput Yield

Rolled Throughput Yield (RTY) takes into consideration what factors?

Scrap and Rework

What Lean metric provides the rate at which you process can meet customer demand based on available time?

Takt Time

What metric helps a Value Stream Map team determine whether a process meets customer demand?

Takt Time

Which of the following is the quantity or rate that a customer is buying the product or service?

Customer Demand

Which of the following is the actual time interval between start and finish of a specific task or operation within a process?

Cycle Time

Value Stream Mapping utilizes four basic time measurement metrics. What are those metrics?

Cycle Time, Total Cycle Time, Process Lead Time, and Total Lead Time

What Lean metric is essential to calculating Process Lead Time?

Inventory Wait Time

Process Lead Time is made up of the individual operation Cycle Times and...

Inventory and Waiting Delays.

Which of the following is the total time required from receipt of order until the ordered product or service is delivered to the customer?

Total Lead Time

Which of the following is the amount of inventory accumulated between the start and end points of the process?

Work in Process (WIP)


Ensembles d'études connexes

Chapter 21: Respiratory Care Modalities

View Set

OB: Chapter 21 Nursing Management of Labor and Birth at Risk

View Set

Царство грибов(9-6)

View Set

Основи наукового пізнання 2 рівень

View Set

SQL interview- http://career.guru99.com/top-50-sql-question-answers/

View Set