Which of the following is NOT a factor in determining schedule feasibility?

A 45-hour work week

What is the term that describes the best estimate of a project's scope, benefits, cost, and resources?

Baseline project plan

Which of the following is NOT a way to manage project risks?

Changing the budget

All of the following are included in the baseline project report except ________.

Conclusion

Which of the following is an example of an intangible cost?

Customer goodwill

All of the following are tangible benefits except ________.

Decreased flexibility

Which feasibility category deals with identifying financial benefits associated with the project?

Economic

Which of the following is NOT a factor in determining legal and contractual feasibility?

Financial budgets

Which type of project should companies not have too many of?

High risk

Which part of the baseline project report contains an outline of the recommended course of action?

Introduction

Which role in the walkthrough normally has done all or some of the work presented?

Presenter

The following is NOT an example of a type of feasibility study.

Resource feasibility

Each organization has to decide its acceptable project mix of ________.

Risks

________ need to be managed in order to be minimized.

Risks

Which type of feasibility deals with project duration?

Schedule feasibility

All of the following are categories of feasibility except ________.

Scope

Which of the following is NOT an example of a recurring cost?

System conversion

Which of the options below means the organization has the ability to build the requested system?

Technical Feasibility

Who must review the baseline project plan before it moves to the next phase in the SDLC?

The uses, managers, and development group

Which term below means that money available today is worth more than the same amount tomorrow?

Time value of money

What makes all projects feasible?

Unlimited resource and infinite time

________ is the process of defining clear activities necessary to complete activities in a single project.

Project planning

Which document outlines all work required to complete the project?

Project scope document

Which of the following is an example of a tangible benefit?

Error reduction in data entry

Failure to integrate the new system with the old system is an example of ________.

Failure to assess and manage risks


Ensembles d'études connexes

Chapter 37. The Bereaved Individual

View Set

Digital Camera/Photography Terms

View Set

WGSS/BIOL 350 Quizzes 1-13 STUDY SET

View Set

Which of the following joints is most likely to be affected by arthritis associated with autoimmune thyroid disease?

View Set

Unit 1: Preparing to Work With Illinois Sellers

View Set

Lección 3 Contextos (Lesson, Contexts) 3 - Profesiones (Professions)

View Set

Economics multiple choice questions

View Set