Administrators at a university are planning to offer a summer seminar. It costs $4000 to reserve a room, hire an instructor, and bring in the equipment. Assume it costs $45 per student for the administrators to provide the course materials. If we know that 100 people will attend, what price should be charged per person to break even? Answers: 48 175 85 137 None of the above

Selected Answer: 85

Consider the following linear programming problem: Max Z = $200x1 + $100x2 Subject to: 8x1 + 5x2 ≤ 80 2x1 + x2 ≤ 100 x1, x2 ≥ 0 What is maximum Z and the value of x1 and x2 at the optimal solution? Answers: Z = 2000; x1 = 10; and x2 = 0; Z = 2000; x1 = 0; and x2 = 20; Z = 1000; x1 = 0; and x2 = 10; All of the above None of the above

Selected Answer: Z = 2000; x1 = 10; and x2=0

Australian road freight company Linfox uses aerodynamic trucks and trailers to reduce fuel consumption. This is a case of generating higher Answers: productivity competitiveness quality stochastic simulation none of the above

Selected Answer: productivity

Which of the following combinations of constraints has no feasible region? Answers: x1 + x2 15 and x1 - x2 10 x1 + x2 5 and x1 10 x1 + x2 100 and x1 + x2 50 x1 + x2 10 and x1 5 All of the above have a feasible region.

Selected Answer: All of the above have a feasible region.

___________________ refers to the ability of an organization to sell products in a market. Please choose the option that best fits the empty space above. Answers: Total Quality Management Productivity Optimal profitability Business competitiveness None of the above

Selected Answer: Business competitiveness

Slack variables are only associated with maximization problems. Answers: True False

Selected Answer: False

When building a mini-boat, a boat builder uses 2 pounds of wood and 3 ounces of glue. If he/she has 3 pounds of wood and 6 ounces of glue, how many mini-boat(s) will he/she be able to build? Answers: zero two four six none of the above

Selected Answer: none of the above

The Pinewood Furniture Company produces chairs and tables from two resources: labor and wood. The company has 120 hours of labor and 100 board-ft. of wood available each day. Demand for table is limited to 8 per day. Each chair requires 3 hours of labor and 4 board-ft. of wood, whereas a table requires 20 hours of labor and 9 board-ft. of wood. The profit derived from each chair is $100 and from each table is $500. The company wants to determine the number of chairs and tables to produce each day in order to maximize profit. The correct linear programming model formulation of this problem is: Answers: Max Z = 120x1 + 100x2 Subject to: 3x1 + 4x2 ≤ 100 20x1 + 9x2 ≤ 500 x2 ≤ 8 x1, x2 ≥ 0 Max Z = 100x1 + 500x2 Subject to: 3x1 + 4x2 ≤ 120 20x1 + 9x2 ≤ 100 x2 ≤ 8 x1, x2 ≥ 0 Max Z = 100x1 + 500x2 Subject to: 3x1 + 20x2 ≤ 120 4x1 + 9x2 ≤ 100 x2 ≤ 8 x1, x2 ≥ 0 Max Z = 100x1 + 500x2 Subject to: 9x1 + 4x2 ≤ 120 20x1 + 3x2 ≤ 100 x1 ≤ 8 x1, x2 ≥ 0 none of the above

Selected Answer: Max Z = 100x1 + 500x2 Subject to: 3x1 + 20x2 ≤ 120 4x1 + 9x2 ≤ 100 x2 ≤ 8 x1, x2 ≥ 0

he break-even point is the volume that the profit is positive (greater than zero Answers: True False

False

Consider the following linear programming problem: Max Z = $15x + $20y Subject to: 8x + 5y ≤ 40 0.4x + y ≥ 4 x, y ≥ 0 Considering that the values for x and y that will maximize revenue are respectively x = 0 and y = 8, what is the amount of slack/surplus associated with the first constraint - in the optimal point? Answers: 4 8 0 6 None of the above

Selected Answer: 0

Consider the following linear programming problem: Max Z = 4x1 + 2x2 Subject to: x1 4 x2 2 x1, x2 ≥ 0 The Z obtained from the best combination of x2 and x1 is: Answers: 4 20 16 25 None of the above

Selected Answer: 20

If by processing the same amount of inputs used in the past a company is now capable to produce a(n) ________ amount of outputs, it means that an improvement of productivity was achieved. greater similar lower exactly the same none of the above

greater

Considering the following LP problem: Min Z= 23x+38y s.t. 3x+6y < 90 9x-8y>30 2x+10y<50 -5x+8y<100 x,y>0 Which one of the following option is correct: Answers: The problem is infeasible The problem is unbounded There are more than one optimal solution (0 , 5) is the optimal solution none of the above

none of the above


Ensembles d'études connexes

Database Foundations Final Practice Test

View Set

Chapter 10. Nursing Care of Patients in Pain

View Set

International Business Exam Questions

View Set

Management Accounting quiz 4 (Chapter 9)

View Set