PROFESSIONAL PRACTICE REFRESHER

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

*NOTE: Please see RA 9514 and PD 1096 for other OCCUPANT LOADS *

*Based on RA 9514:* *For Concentrated use w/o fixed seat:* Worship and dance floor - 0.65sqm. *Less Concentrated:* Concerence room, dining room, gym - 1.40sqm. *Standing room / waiting spaces* - 0.28sqm. *Based on PD 1096:* Dwellings - 28.00sqm Hotels, apartments - 18.60sqm Classrooms - 1.8 sqm School shops/labs - 4.6sqm Hospitals - 8.4sqm Stores: Basement - 2.80sqm Stores: Ground floor - 2.8sqm Stores: Upper floors - 5.6sqm Stores: Offices - 9.3sqm Auditoriums, theaters, churches - 0.65sqm

Definition/Function of HDMF

*Home Development and Mutual Fund* (HDMF), or *Pagtutulungan sa Kinabukasan: Ikaw, Bangko, Industriya at Gobyerno* (PAG-IBIG Fund), is a national savings program for Filipino workers. The PAG-IBIG Fund was established in 1978 by virtue of *Presidential Decree 1530*. The Fund is basically a savings program, but it also offers short-term loans and access to housing programs to its members.

Collector Road -Study urban road classification

*PD957* Min. Sizes of ROADS - Both for Med. Cost & O. Market (For 2.5 hectares and below) Major Road - *10 m* Collectors Road - *N/A* Minor Road - *8 m* Service Road - *6 m* *BP220* Min. Sizes of ROADS - Both for Socia. & Eco. Interconnecting Road - *10 m* Major Road - *8 m* Collectors Road - *8 m* Minor Road - *6.5 m* Motor Road - *6 m* Pathwalk - *3 m* Alley - *2 m*

Most notably *Executive Order 90* which renamed it as the *"HOUSING and Land Use Regulatory Board (H.L.U.R.B)"* The *Housing and Land Use Regulatory Board* is the sole regulatory body for housing and land use development. In order to achieve the goal of rational land use, the HLURB performs the twin roles of enhancing the reinforcing rational housing and real estate service delivery through the implementation of the following three (3) strategies: policy, planning and regulation. *HLURB* approves condominium plans protect buyers of housing units and home lots as well as condomium units from unscrupulous practices; and issues licenses to sell. Approved condominium plans and licenses to sell provide added assurance to the buyers that the real estate project truly exists.

*PLANNING MANDATES OF H.L.U.R.B.* ▪ Formulate guidelines for Comprehensive Land Use Planning (CLUP) ▪ Assist cities and municipalities in preparing their CLUPs ▪ Assist Provincial Land Use Committees (PLUC) and Regional Land Use Committees (RLUC) in reviewing CLUPs ▪ Review and approve CLUP's for highly urbanized cities and Provincial Physical Framework Plans (PPFPs) ▪ Monitor actual land use and the implementation of CLUPs by local government units ▪ Update and revise the National Urban Development and Housing Framework ▪ Train LGUs in subdivision plan approval and zoning enforcement

The third (3) phase of the Architect's services?

*SPP Doc. 200* - Code of Ethics Architect's Services *SPP Doc. 201* - Pre-Desing Services *SPP Doc. 202* - Regular Design *SPP Doc. 203* - Specialized Services (Answer) *SPP Doc. 204*- Construction Services *SPP Doc. 204a* - Full time Construction Services *SPP Doc. 204b* - Construction Management *SPP Doc. 205* - Post Construction Services *SPP Doc. 206* - Comprehensive Architectural Services *SPP Doc. 207* - Design Build Services *SPP Doc. 208* - Architecural Design Competition *SPP Doc. 209* - Professional Architectural Consulting *SPP Doc. 210* - Methods of Compensation

What are Surety Bonds, Performance Bends and Guarantee Bonds?

*Surety* - the person, firm, or corporation who provides the guarantee for the contractor's bonds. *Proposal bond* - a guarantee that the bidder will enter into a contract with the owner if the contract is awarded to him *Performance bond* - a guarantee of the contractor to execute the work in accordance with the terms of the contract *Payment bond* - a guarantee of good faith on the part of the contractor to pay all obligations arising from the contract *Guarantee bond* - a guarantee to the quality of the materials and equipment installed and the workmanship of the contractor

An Architectural Firm needs to be specifically registered with a. PCAB b. DTI c. PRC and PRBOA d. SEC

*b. DTI - Sole proprietorship* *d. SEC - partnership / corporation*

It is a widely used Third-Party Verification for green building certification developed by the USGBC that aims to help building owners and operators to be environmentally responsible and use resources efficiently. a. CASBEE b. LEED c. BERDE d. TUV Rheinland

*b. LEED - Leadership in Energy and Environmental Design, is the most widely used green building rating system in the world.* U.S. Green Building Council (USGBC) a. Comprehensive Assessment System for Built Environment Efficiency (CASBEE ) - is the green building management system in Japan. c. Building Ecologically Responsive Design Excellence (BERDE) - local green building and environmental laws and regulations. d. TÜV Rheinland Philippines Inc. - is the pioneering testing, inspection and certification body in the country

Under PD 957 for medium to density subdivisions, what is the area of parks and playgrounds?

- 100 sqm (min.)

What is the width of Zebra Crossings?

- 2 m

Capacity of Fire escape stairs

- 45 pax/unit access door - 20 pax/unit access window

What is the difference between a Party Wall and a Fire Wall?

- Boundary

What papers are usually seen at the jobsite?

- Building permit, Building plans, Contract Documents

What does FALAR stand for?

- Fire And Life safety Assessment Report

It is required if the lot Owner intends to abut the building to his property line if that side of the lot has an existing neighbor

- Permit from the neighbor

What law protects the Architect from the reproduction of copies of the contract?

- RA 8293: Intellectual Property Code; Under Sec. 33 of RA 9266

What should be provided in the immediate vicinity of crossings as an aid to the blind?

- Tactile Strips

What is Central Refuge?

- also known as a pedestrian refuge, pedestrian island and colloquially as a "pork chop" island, is a small section of pavement or sidewalk, completely surrounded by asphalt or other road materials, where pedestrians can stop before finishing crossing a road. It is typically used when a street is very wide, as the pedestrian crossing can be too long for some individuals to cross in one traffic light cycle, they can often been seen on roads with higher speed limits also.

Identify the type Of lot in the figure below.

-Corner End Lot

What do you call an Architect who wishes to practice architecture and is registered with the DTI?

-Sole Proprietorship

Minimum clearance of a table from the floor considering the handicapped

0.60 m

Under the Accessibility Code, what is the maximum height of handrail?

0.70 - 0.90

Asper BP 344, what is the minimum door opening for elevators (single door)

0.80 m

Dimensions of doors and windows conforming to accessibility law

0.80 m

The minimum width of a doorway

0.80 m

1. What is Change Order? 2. What is Supplementary Specs? 3. It is the primary power of the Architect over the Contractor during construction?

1. After plan is approved. 2. Additional specifications after specifications were approved. 3. Supervision

1. The owner finally agree and accepts the Architect's Plans/Drawings. What is the next logical step?

1. Bidding

Identify the types of lots in the figure below indicated as #1 and #2

1. Inside Lot 2. Corner through Lot

1. It is the stage when the contractor manager informs unqualified bidders of supplementary info prior to bidding? 2. It is signed immediately when the contractor is awarded the Contract? 3. What should be considered in the selection of the winning bid?

1. Pre-Bid Conference 2. Contract 3. Bid which is a compliant with the scope of works

1. What is U.A.P. responsibility as I.A.P.O.A.? 2. When U.A.P was designated as I.A.P.O.A. who was its President?

1. Prime / Lead Organization 2. Ar. Robert Sac

Questions from Fire Code about the following: Door width for nursing institution

1.2

Under PD 1185 for mercantile occupancy. what is the exit width?

1.2 m

Questions from Fire Code about the following: Occupant load, number of egress for sleeping institution

1/11 sqm

Questions from Fire Code about the following: Occupant toad, number of egress for nursing institution

1/22.3 sqm

How many %of tax should Architect Pay?

10 % of Income tax; 12% of Professional fee Note: Verify Answer!

How many % of tax is taken form M.B.F?

12% Note: Verify Answer!

What is the minimum floor area for Economic and Socialized Housing?

28 sqm

Maximum height Of a party wall

3.0 m

Questions from Fire Code about the following: Exit, corridor length

45.46 m

The Architect's professional fee for a Bakery project worth 2 Million pesos?

6% or Php. 120,000

What is the minimum width of minor road for Economic and Socialized Housing subdivision?

6.5 m

To a width not exceeding 500 millimeters, it shall have a minimum depth of ____ millimeters measured from the top of the said foundation up to the established grade, provided further that it does not obstruct any existing utility such as power, communication, gas, water, or sewer fines.

600 mm

If the owner wants to build a house after 1 year, how much is the fee?

90% of the P.C.C.

*SITUATION 17* 3. What is the effect/function of the following on your project? a. DPWH b. Meralco c. MWSS d. OBO

???? a. Department of Public Works and Highways - Civil works b. Merlco - Electrical utility c. MWSS - Water utility d. Office of the Building Official - Building design Regulation

What is an Architect?

A person who plans,designs,and reviews the construction of buildings.

Who is entitled to be an Architect

Academically and Professionally Qualified

Allowable projection for the signage of a building that is NOT arcaded a. 0.90 b. 1.00 c. 1.20 d. None of the above

Answer: *c. 1.20* On non-arcaded RROW: ▪Signs shall not project more than *1.20m* ▪Non-arcaded RROW(Min. Vert. Clearance): *3.00m from road surface to lowest part of signs* On arcaded RROW: ▪Signs shall not project more than *0.60m* ▪Arcaded RROW(Min. Vert. Clearance): *5.00m from road surface to lowest part of signs* Buildings abutting RROW without sidewalks: ▪Signs shall not project more than *0.30m*

The Pork Barrel Scam gave Philippines a blackeye in the international community. As an Architect and a concerned citizen, what can you do? a. Join a Rally to protest the corruption in government b. Be vigilant and be aware of that is happening in the community c. Do not vote corrupt politicians in the office d. Abide by the Code of Ethics

Any of the choices below: b. Be vigilant and be aware of that is happening in the community c. Do not vote corrupt politicians in the office d. Abide by the Code of Ethics

What do you call the action of the Construction Manager in the contract document phase wherein he organized bid packages of the various trades?

Assembly of Bid Packages

Specs writing should be ____ (manner)

Clear and Concise (No double meaning)

What shall the architect not ask from sources such as material suppliers given the fact that he already receives a professional fee from the client?

Commision

New provision in RA 9266 not found in RA 545

Corporate Practice

What is the difference between RA 9266 and RA 545?

Corporate Practice *RA 545 - Old ver. of the law *RA 9266 - Architecture Act of 2004 (New ver.)

Government agency tasked to build Jails a. LGU b. BuCor c. BJMp D. DPWH

D. Department of Public Works and Highways (DPWH)

A Client wants your design to be the same with another Architect. What should you do?

Do not Do it!

A Client will usually hire you to be his Architect but you found out that there is another Architect involved. What would you do?

Don't get involved!

5 M's specified by Griffith and Watson (2004 p118)

Duties of Construction Manager

Regarding rebates and discounts form Suppliers and Manufacturers

Ethics

The Owner likes a particular bidder. He is delayed and fails to beat the deadline. What factors can be considered so that he can still join the bid?

Failure of Bid

What must the client do if he wants to build another building of the same type?

Hire same Architect!

Definition/Function of UHLP

In the 1980s, the Cory Aquino administration introduced the Unified Home Lending Program (UHLP) that aimed to motivate private home developers to go into low-cost housing projects by allowing them to tap pooled housing funds from the Government Service Insurance System, the Social Security System, and the Pag-lbig Fund. The program went full -blast under the Ramos administration, built many homes.

What Insurance borne by the Contractor will cover injuries, deaths and other unwanted incidents at the site?

Life Insurance

How is the Architect compensated if the clients asked for a Feasibility study?

Maximum of Direct Personnel Expenses (M.D.P.E)

It is the most fixable compensation for an Architect

Maximum of Direct Personnel Expenses (M.D.P.E)., LUMP SUM or Project Construction Cost (P.C.C.)

What is meant by R2 in residential Zone?

Medium Density

It is ethical and legal, for an Architect to hire employees on a per project basis since SSS and Medicare is not required but only group insurance and employees can be terminated even after 6 months?

No Contractualization

What law covers the Intellectual Property Rights?

RA 8293

Questions regarding the fees that an Architect is supposed to collect from his/her client under different types of projects.

Review for Methods of Compensation

The Code of Ethical Conduct is an integral part of?

Standards of Professional Practice (SPP)

What does the construction manager do in the Design Phase wherein he advices the Architect on material cost, construction techniques, and cost & time controls?

Technical Consultation

Definition/Function of NHA

The *National Housing Authority* (NHA) is the only government agency that engages in actual shelter production for low-income Filipino families. The NHA was created by virtue of *Presidential Decree No. 757*.

Definition/Function of NEDA

The National Economic and Development Authority (NEDA) is the country's premier socioeconomic planning body, highly regarded as the authority in macroeconomic forecasting and policy analysis and research. It provides high-level advice to policymakers in Congress and the Executive Branch. Its key responsibilities include: Coordination of such activities as the formulation of policies, plans and programs to efficiently set the broad parameters for national and sub-national (area-wide, regional and local development); Review, evaluation, and monitoring of infrastructure projects identified under the Comprehensive and Integrated Infrastructure Program (CIIP) consistent with the government's thrust of increasing investment spending for the growing demand on quality infrastructure facilities; and Undertaking of short-term policy reviews to provide critical analyses of development issues and policy alternatives to decision-makers.

When can a contractor terminate a contract?

The contractor may suspend work or terminate contract upon fifteen (15) days' written notice to the owner and the Architect for any of the following reasons: ▪If *an order of any court or other public authority* caused the work to be *stopped or suspended for a period of ninety(90)days through no act or fault of the contractor* or his employees. ▪If the *Architect* should *fail to act upon any Request for payment within (15) days* after it is presented in accordance with the general Conditions of the Contract. ▪If the *owner* should *fail to act upon any request for payment or certificate of payment within (15) days* after its certification by the Architect. ▪If the *Owner* should *fail to pay the contractor any sum within (30) days* after its award by arbitration.

What is Value Engineering? - It is an organized approach to the identification and elimination of unnecessary Cost or the acquisition of necessary function or services at the lowest Cost.

The following are functions of value engineering: - Preparing and administering maintenance programs. - Forecasting expenditure flows. - Advising on cost limits and preparing budgets. - Advising on Cash Flow Forecasting. - Advising on Life Cycle Costing. - Cost Analysis. - Cost Benefit Analysis. - Estimating - Evaluating alternative designs. - Undertaking Feasibility Studies. - Investment Appraisal - Measuring and describing construction work but only in terms of cost planning.

What is the difference between a Site Plan and a Master Plan?

Time Frame

b. At the Schematic Design Phase of the work or c. During Contract Documentation Note: Verify the Answer!

When must the Architect properly locate/site a building with respect to the Road (R.R.O.W.), legal easement and the like? a. Answer not among the choices b. At the Schematic Design Phase of the work c. During Contract Documentation d. Sometime during Design Development

Parking for R1,R2 and R3

a minimum of 1 Pooled off-site cum on-site for every 6 slots or dwelling units (1:6)

How is the Architect remunerated for basic services? a. % of Construction cost

a. % of Construction cost

Combustible liquid is any liquid having a flash point at or above ___ deg. Celsius a. 37.8 b. 93.3 c. 60.0 d. 100

a. *37.8 deg. Cel.* or no flames within *6.1m* while operation is conducted

The minimum number of elevator for a 4-storey building a. 0 b. 1 c. 2 d. 3

a. 0

For Buildings four (4) storeys in height, the maximum opening allowed at the fire wall is? a. 0.00 b. 1.00 c. 2.00 d. 4.00

a. 0.00

Height for convenience outlet a. 0.30 m b. 0.20 m c. 0.40 m d. 0.50 m

a. 0.30 m

According to BP 344, what is the comfortable clearance for knee and leg Space under tables for wheelchair users? a. 0.60 m b. 0.70 m c. 0.65 m d. 0.75 m

a. 0.60 m

Under BP 220, the minimum clear width of a Bathroom Door is a. 0.60 m b. 0.70 m c. 0.80 m d. 0.90 m

a. 0.60 m

What is the minimum clear width of a Door under BP 344? a. 0.80 m b. 0.60 m c. 1.00 m d. 0.90 m

a. 0.80 m

What is the minimum width of a door considering BP 344 only, a. 0.80 m b. 0.90 m c. 0.70 m d. 1.00 m

a. 0.80 m

Width of Drop Curb a. 0.90 m b. 1.00 m c. 0.80m d.

a. 0.90 m

The minimum number of doors used for egress a. 1 b. 2 c. 3 d. 4

a. 1

If an Architect performs full-time supervision, what is his professional fee? a. 1 - 1.5% b. 1.5 - 2% c. 3 % d. 5 - 6%

a. 1 - 1.5%

Dwelling units in Row Apartments shall be separated from each other by a Partition Wall having a Fire Resistance Rating of a. 1.00 hr b. 1.50 hrs c. 2.00 hrs d. 4.00 hrs

a. 1.00 hr

For a 3-Storey structure or less, the exit enclosure shall be protected by a separation with a Fire Resistance Rating of a. 1.00 hrs b. 1.50 hrs c. 2.00 hrs d. 4.00 hrs

a. 1.00 hrs

Considering office space, what is the minimum width that will also serve as access from the work unit to the wall? a. 1.00 m b. 1.20 m c. d.

a. 1.00 m

As per NBC. what is the minimum width for a Corridor? a. 1.10 m b. 1.20 m c. 1.40 m d. 0.90 m

a. 1.10 m

As per BP 344, what is the minimum size of an elevator car? a. 1.10 x 1.40 m b. 1.20 x 1.50 m c. 1.40 x 1.80 m d. 0.90 x 1.20 m

a. 1.10 x 1.40 m

Minimum door width for hospital nursing units a. 1.20 m b. 0.80 m c. 0.70 m d. 1.10 m

a. 1.20 m

Under the NBC, what is the minimum dimension of a kitchen? a. 1.5m b. 2m c. 1.20 m d. 0.90 m

a. 1.5m

What is the minimum dimension of a PWD toilet? a. 1.70 m b. 1.80 m c. 1.50 m d. 1.60 m

a. 1.70 m

What is the minimum floor area of the water closet stalls for the handicapped? a. 1.70 x 1.80 m b. 1.50x 1.70m c. 1.50 x 2.25 m d. 1.70 x 1.90m

a. 1.70 x 1.80 m

A Client wanted your services for his new house with a Total Project Cost of Three Million (3,000,000.00) pesos a. What is the Percentage of your Professional Fee b. Will the percentage of your fee change if the Client decides to postpone the Project the following year? c. How much will you get if the Client decides to defer the start of Construction for a year?

a. 10% b. No c. 90%

*SITUATION 13* 3. If Architect C is hired, how will she be compensated? a. 10% for the Architect's regular rate + 15% for ID's regular rate b. 10% for the Architect's regular rate + 10% for ID's regular rate b. 10% for the Architect's regular rate + 12% for ID's discount rate d. M.D.P.E.

a. 10% for the Architect's regular rate + 15% for ID's regular rate

Every room not provided by artificial ventilation shall be provided a window or windows with a total free area of opening equal to at least a. 10% of floor area b. 15% of floor area c. 20% of floor area d. 25% of floor area

a. 10% of floor area 5% for bathroom (of the floor area|)

In a Sidewalk with a width of 1.80m. how man elderly people can walk side-by-side at the same time? a. 2 b. 3 c. 4 d. 5

a. 2 Note: Provision for person with cane is approx 0.9 x 2: 1.80m answer is 2 ELDERLY PEOPLE.

What is the size of a Dry Stand Pipe if the height of the building is more than 23m? a. 2" b. 2 ½" c. 3" d.

a. 2" Note: Verify Answer! According to RA 9514 For Dry Standpipe: Less than 23m height of bldg. - *4 in* More than 23m height of bldg. - *6 in* For Wet Standpipe: Min. *2 1/2 in* For Combination Standpipe: *6 in* or *150mm*

As per BP 220, Doors for economic and socialized housing. shall have a minimum height of ___ except for Bathroom and Mezzanine Doors which shall have a minimum clear height of 1.80m. a. 2.00 b. 1.85 c. 2.10 d. 1.90

a. 2.00

Minimum Rear Setback for R-1 a. 2.00 b. 3.00 c. 4.00 d.

a. 2.00

Minimum Side Setback for R- 1 a. 2.00 b. 3.00 c. 4.00 d.

a. 2.00

A Fire Wall is a wall designed to prevent the spread of fire. It shall be designed to have sufficient structural stability to remain standing even if construction on either side collapses under fire conditions. Its minimum Fire Resistance Rating should be? a. 2.00 hrs b. 4.00 hrs c. 6.00 hrs d. 8.00 hrs

a. 2.00 hrs

Under BP 220, the required setback of the sides and front is 1.50 meters. What then is the required yard at the rear? a. 2.00 m b. 1.00 m c. 1.50 m d. 3.00 m

a. 2.00 m (Asked twice)

(from Qatar Exam) If the Residential Condominium units are to be Airconditioned, what shall be the minimum distance (in meters) between the Finished Floor Line (FFL) and the Finished Ceiling Line (FCL) at the 5th Floor? a. 2.40 m b. 2.70 m c. 2.10 m d. 1.80 m

a. 2.40 m (ans... if 2nd flr) b. 2.70 m (ans... if 1st flr) *c. 2.10 m (ans... succeeding storeys)* d. 1.80 m (for mezzanine)

What is the minimum RROW for access to Interior Lots? a. 3 m b. 4 m c. 6m d.

a. 3 m

Using the 1977 National Building Code, what is the minimum setback for R-1 a. 3.0 m b. 4.0 m c. 5.0 m d. none of the above

a. 3.0 m

For both economic and socialized housing under BP 220 with a density of 150 lots per hectare, how much in percentage of the gross area is allocated for Parks and Playgrounds? a. 3.5 b. 4.0 c. 5.0 d. 6.0

a. 3.5

For open market and medium cost subdivision Under PD 957 with a density of 20 lots per hectare, how much in percentage of the gross area is allocated for Parks and Playgrounds? a. 3.5 b. 4.0 c. 5.0 d. 6.0

a. 3.5 (21(4%) = +5(5%); +10(6%); +15(7%); +15(9%))

When should Building Operations Manual (B0M) be submitted to the owner by the contractor? a. 30 days after issuance of certificate of Occupancy b. As Soon as the building is finished and ready for occupancy c. As soon as the owner asks for it and all billings paid d.

a. 30 days after issuance of certificate of Occupancy

What is the maximum distance of Elevators considering the handicapped? a. 30 m b. 35 m c. 40 m d. 45 m

a. 30 m

Footings located at least 2.40m below grade national roads or public highway may project not more than how many millimeters beyond the property line? a. 300 b. 500 c. 600 d. 750

a. 300

Minimum Front Setback for R-1 a. 4.50 b. 6.00 c. 5.00 d.

a. 4.50

Angle of turn of embossed tiles for the blind a. 45 degrees b. 90 degrees c. 30 degrees d. 60 degrees

a. 45 degrees

As per PD 1096, how many sets of Architectural Plans and Specifications are needed for the purpose of obtaining a Building Permit? a. 5 b. 6 c. 7 d. 8

a. 5

Under the NBC, what is the minimum area of a room for Human Habitation? a. 6 sqm b. 3 sqm c. 1.20 sqm d. 8 sqm

a. 6 sqm

Maximum height of Spire, if made of combustible material, above the BBL? a. 6.0 m b. 7.0 m c. 6.50m d. limited only by Structural Design

a. 6.0 m Combustible - able to catch fire and burn easily.

If an Architect is hired to design a Supermarket with a construction cost of less than 50M pesos, how much he/she charge as a minimum basic fee? a. 7% b. 8% c. 9% d. 15%

a. 7%

An Architect, an Interior designer & an Engineer, who are all siblings, are planning to set-up an Architectural Firm. How many % will be the Architect's share? a. 75% b. 60% c. 70% d. 33.33%

a. 75%

What is the foremost role of an Architect with regards to his Client? a. Adviser b. Design Manager c. Design Consultant d.

a. Adviser

*SITUATION 19: As per Client's request, the Architect made some revisions. Since time is of the essence, he decided not to coordinate with the Engineering Consultants. After concrete pouring, he discovered that a beam is set lower than required headroom clearance. 1. What is the lesson learned? a. Always coordinate with consultants and project engineers b. Being the "Boss" other Allied practitioners should adjust their design to conform with yours. c. (Note: Sometimes the answer is already in the situation given and you just need your common sense) d.

a. Always coordinate with consultants and project engineers

In order to aid visually impaired persons to readily identify the men's washroom. this signage is use. a. An equilateral Triangle with vertex pointing upward b. An equilateral Triangle with vertex pointing downward c. A Circle whose diameter is 0.30m long d. An Oblong that is 7.5mm thick with a stick figure

a. An equilateral Triangle with vertex pointing upward

A Comprehensive Development Plan will include the ff. components except a. Appraisal b. Socio-Cultural c. Transport d. Legal and Administrative

a. Appraisal

*SITUATION 16* 2. Who is liable for the drawings under the law? a. Arch. A b. Arch B & C c. Arch A, B & C d. The Company

a. Arch. A

*SITUATION 16* 3. Who own the majority of the shares in the company? a. Arch. A b. Arch A, B & C c. The Company d. The Investors

a. Arch. A

A Client commissions you for a project. Since the Client has a hardware, he insisted that he should be the one to supply the materials and delivers them to the jobsite. The Contractor uses them and installs the same. Everything is fine until you noticed that the materials being used are substandard and does not follow the specifications you prepared. This angers you and you refused to sign the Contractor's billing. The Contractor complains to the Owner and stops all work. The Owner is angry too because of the work stoppage and also feels insulted by you. Now everybody is angry, and everything grinds to a halt. Who should say sorry first? a. Architect b. Owner c. Contractor d. No one. Let's settle this in court

a. Architect

A full-time supervisor hired by the Owner should report technical matters to the a. Architect b. Owner c. Contractor d. No one. He is the supervisor

a. Architect

An Architect makes a miniature model of the for his own design study. Who should pay for it? a. Architect b. Project Manager c. Contractor d. Owner

a. Architect

Approval of Samples of Finishing Materials is the sole function of the a. Architect b. Contractor c. Engineer d. Owner

a. Architect

Who prepares FALAR 1? a. Architect b. Engineer c. Contractor and Construction Manager d. Building Owner

a. Architect

Who should Orient the Contractor and make sure that he understands the Contract Documents? a. Project Manager b. Architect c. Owner d. None, its Contractor's responsibility

a. Architect

*SITUATION 16* 4. In the absence of a written stipulation to the contrary, who has intellectual proprietary rights over the Architectural documents? a. Architect A, he signed and sealed all the drawings b. Architect B & C, they are in charge of the designs c. Architect D & E, they are in charge of Production d. The Client, he paid for the documents

a. Architect A, he signed and sealed all the drawings

*SITUATION 16* 5. Who has the proprietary rights to the architectural works such as plans, design and other documents but is confined for the use of such documents for the execution/implementation of the works described therein for one(1) or the original project only? a. Architect A, he signed and sealed all the drawings b. Architect B & C, they are in charge of the designs c. Architect D & E, they are in charge of Production d. The Client, he paid for the documents

a. Architect A, he signed and sealed all the drawings

*SITUATION 9* 2. Architect B, being a neophyte Architect and in his desire to get the project, did not require Owner A to sign a formal contract. What will happen now that Owner A doesn't want Architect B for the project? a. Architect B won't get paid b. Architect B won't get just compensation c. Architect B will get just compensation d. Architect B will sue Owner A

a. Architect B won't get paid

*SITUATION 1* 2. Due to the numerous projects coming their way, the firm reached a point wherein they became undermanned vis-a-vis their projects. Engr. Popoy was tasked to supervise the construction as the client specifically asked him because of his reputation as a sought after engineer in Europe. There was an accident at the jobsite wherein a beam collapsed and it was found out that it was due to the inferior materials used by the Contractor. Who is liable under the Civil Code of the Philippines? a. Architect Basha b. Engr. Popoy c. Contractor d. Engr. Popoy and the Contractor

a. Architect Basha or d. Engr. Popoy and the Contractor Note: Verify Answer!

Who has a Civil liability under Article 1723 of the Civil Code for the Architectural document of a project? a. Architect-of-Record b. Consulting Architect c. Architect-in-Charge of Construction d. Civil Engineer

a. Architect-of-Record

Which is NOT part of Specialized Architectural Services (S.P.P. Doc. 203)? a. Architectural Interiors b. Acoustic Design c. Site Development Planning d. Site Utilization

a. Architectural Interiors *S.P.P. Doc. 203: Specialized Architectural Services* 1. Architectural Interiors 2. Acoustic Design 3. Architectural Lighting Layout and Design 4. Site Development Planning (S.D.P.) 5. Site Development Physical Planning Services (including Master Development Planning, Subdivision Planning and Urban Design) Note: Verify the answer!

If the Plans and Specifications Of the project does not conform with the requirements of the Fire Code of the Philippines, who disapproves it? a. BFP b. Owner c. Building Official d. Barangay

a. BFP

Which governs low cost housing projects? a. BP 220 b. PD 957 c. d.

a. BP 220

Which law provides for minimum design standards for economic and socialized housing projects? a. BP 220 b. PD 957 c. PD 1096 d. BP 344

a. BP 220

Specifications contain a. Bill of Materials b. Responsibility of Clients c. Quality of Materials d. Other Conditions of Services

a. Bill of Materials

What is given to the client by the contractor after all the work is done, to ensure a properly functioning and efficient building? a. Building operations manual b. post construction evaluation c. d.

a. Building operations manual

Design-build by maximum cost, how much is the architect remunerated? a. Built in the max cost exclusive of Architects reg fee b. 10% inclusive of Architects fee c. 7% inclusive of Architects fee d. Lump sum inclusive of Architects fee

a. Built in the max cost exclusive of Architects reg fee

Aside from the Bond, another instrument used by the Owner to ensure that the Contractor properly completes the activities required of them and that they make good any defect is to defer the release of payment (often 1-5%) until such time that the project is properly completed, and any defect made good. This tool is called a. Cash Retention b. Cash Deposit c. Cash Receivables d. Deposit-in-Escrow

a. Cash Retention

If the Owner wants to change the estimated cost after awarding to a winning bidder due to economic basis, what should he do? a. Change Order b. Revise scope of works c. Change Architect d.

a. Change Order

What should the Architect do if the Owner makes Change Orders? a. Check with Contractor b. Follow the Owner c. Neglect Owner d.

a. Check with Contractor

Where will they apply for a Business Permit? a. City Hall b. SEC c. DTI d. BIR

a. City Hall

A Fire is caused by Burning paper, Cloth, etc., what Type Of Fire is this? a. Class A b. Class B c. Class C d. Class D

a. Class A

It is also known as UAP Doc. 200 a. Code of Ethical Conduct b. Standards of Professional Practice c. Architect's Responsibilities d. Pre-Design Services

a. Code of Ethical Conduct

Drawing, specifications, budgetary cost, models, furnished by an architect are called a. Construction document b. Architect's proposal c. d.

a. Construction document

After completion of contract drawing, specifications and other documents upon submission to a client, what stage is this? a. Contract Document Phase b. Construction Phase c. Bidding or Negotiation Phase d. Design Development Phase

a. Contract Document Phase

Under Regular Design Services (S.P.P. Doc. 202), what comes next after Design Development Phase? a. Contract Document Phase b. Bidding Negotiation Phase c. Construction Phase d. Project Definition Phase

a. Contract Document Phase *S.P.P. Doc. 202: Regular Design Services* 1. Project Definition Phase 2. Schematic Design Phase 3. Design Development Phase 4. Contract Document Phase 5. Bidding Negotiation Phase 6. Construction Phase

Who prepares As-Built plans? a. Contractor b. Architect c. Engineer d. Owner

a. Contractor

Who prepares the Shop drawings? a. Contractor b. Architect c. Engineer d. Supplier

a. Contractor

What is now allowed by RA 9266 which was not allowed in RA 545? a. Corporate Practice b. Signing of plans by an architect not prepared by him c. Exp. B4 Graduation d.

a. Corporate Practice

Seek permit from the DENR when a. Cutting large trees b. c. d.

a. Cutting large trees (200 ?? - Verify Answer this one!)

What agency has jurisdiction over the quality of effluent from septic tanks? a. DENR b. Local Gov't c. DOH d.

a. DENR

Who is responsible for the administration of the provision of the Building Code and its IRR, including the imposition of penalties? a. DPWH Secretary b. Building Official c. Municipal Engineer/Architect d. PRBoA

a. DPWH Secretary

Which is not a qualification of a specs writer? a. Degree and experience in construction management b. Contact with suppliers c. Library of references d. Degree and experience in latest construction trends and materials

a. Degree and experience in construction management

*SITUATION 7: Juan has been working at Saudi Arabia for almost 15 years but he feels incomplete since he was not able to take the licensure examination when he was still in the Philippines. He heard that the PRBoA is going to conduct FLEA at Jeddah. He asks his family to send his Transcript of Records (T.O.R.), Birth Certificate and Diploma.* 1. What else does he need to be able to take FLEA? a. Diversified Training Logbook signed and sealed by a Filipino R.L.A. b. Certificate of Employment from his company showing his tenure and position c. Recommendation Letter from the Consulate d. NOTA

a. Diversified Training Logbook signed and sealed by a Filipino R.L.A.

When can an architect do design concepts parallel to other designing architects? a. During Design Competitions b. Before Project is Conceived c. During Design Development d.

a. During Design Competitions

Soil test is the duty of a. Engineer b. Construction Manager c. Architect d. Owner

a. Engineer

Where does Assessing the need of the Client fall? a. Feasibility Study b. Pre-design Services c. Regular Services d.

a. Feasibility Study

What are the qualifications of someone who wishes to take the Licensure Examination for Architects? a. Filipino Citizen b. A graduate of Architecture c. d.

a. Filipino Citizen (Jan. 2018 ito answer sa refresher) b. A graduate of Architecture (June 2018 ito answer sa refresher)

It is the active principle of burning, characterized by the heat and light of combustion. a. Fire b. Ember c. Blasting Agent d. Fulminate

a. Fire

What do you call the portion of a roadway or public-way that should be kept opened and unobstructed at all times for the expedient operation Of firefighting units. a. Fire Lane b. Carriageway c. Fire Hydrant Area d. RROW

a. Fire Lane

A person who enters into firefighting service through an organized group recognized by the BFP and undergoes the same discipline as that of BFP firefighters. a. Fire Volunteer b. Community Fire Brigade c. Fire Brigade d. Government Fire Brigade

a. Fire Volunteer

A group of firefighters performing fire suppression activities within a specified jurisdiction is called a. Fire Volunteers b. Barangay Fire Brigade c. Community Fire Brigade d. Fire Brigade

a. Fire Volunteers

You had a project for a client, a residential building. After the construction, you found out that the client used your design for another project without your consent. What will you do? a. Forgive and Forget b. Inform the Mayor c. File a case with the P.R.C. d.

a. Forgive and Forget

*SITUATION 12* 5. Your where hired by the firm as an Architect and they didn't require their employee to wear uniform. As an Architect working in the office, what would be your best attire? a. Formal/Business Attire b. Casual/Comfortable c. Rugged d. Any

a. Formal/Business Attire

If an Architect assumes the function of going to the project site for monitoring and supervision, what services is being provided? a. Full-time project supervision b. Project Supervision c. Construction Management d.

a. Full-time project supervision

Who prepares the Comprehensive Land Use Plan? a. HLURB b. Architect c. Environmental Planner d. Engineer

a. HLURB

*SITUATION 8: Juan just passed the ALE with flying colors and came back to his old job in Singapore. His boss was so impressed, that he wanted to put up an architectural firm here in the Philippines.* 1. What should Juan's boss do to practice architecture in the Philippines? a. He should collaborate with a Filipino Firm/Architect and be partners to be able to practice Architecture in the Philippines. b. He should register his firm and begin practicing architecture in the Philippines. c. He is not allowed to put up an Architectural firm in the Philippines. d. He could practice architecture in the Philippines anytime he wants.

a. He should collaborate with a Filipino Firm/Architect and be partners to be able to practice Architecture in the Philippines.

*SITUATION 14* 2. What can be done to remedy the problem? a. Hire a local Architect to sign and seal for him b. Determine if a reciprocity agreement exists between the Philippines and New York c. Pass the local Licensure Examination for Architects.

a. Hire a local Architect to sign and seal for him

It links the skills of human with existing and available resources for development a. Human Resource Development b. Bldg. Technology & Methodology c. Construction Skills Development d.

a. Human Resource Development

In which circumstance will a Building Permit become invalid? I — when construction has not commenced within 1 year from date of issue Il — when work is suspended for 365 days Ill — when work is suspended for I8O days IV — when work is suspended for 120 days a. II and III b. I and III c. I and Il d. I and IV

a. II and III (365 & 120 Days is beyond the limit of days) *Be careful with the choices. Read 3 times!!

*SITUATION 3* 5. When is the Architect's Creed not recited? a. I.A.P.O.A. meeting b. Mass Oath taking c. Induction to U.A.P. d. When it is needed

a. Integrated and Accredited Professional Organization of Architects (I.A.P.O.A.) meeting

For specialized Architectural services, what is the detailed planning and design of the interior/enclosed areas of any proposed building/structure? a. Interior Design Services b. Architectural Interior Services c. Architectural Programming d. Architectural Lighting layout

a. Interior Design Services (Read Carefully!)

A basis for Direct Selection of Architects a. Invitation b. Interview c. Verification d. Recommendation

a. Invitation or d. Recommendation Note: Verify Answer!

It refers to contracts or arrangements involving the transfer of systematic knowledge for the manufacture of a product, the application of a process, or rendering of a service including management contracts; and the transfer, assignment or licensing of all forms of intellectual property rights. a. Knowledge Transfer b. Franchising c. Foreign Counterpart d. Technology Transfer

a. Knowledge Transfer

What is the role of the Architect between the client and contractor? a. Mediator b. To execute judicial orders with impartiality c. Consultant d.

a. Mediator

It is the development of new technology, 3D and computer graphics has been widely used. What is the benefit? a. More efficient and realistic b. Cheaper c. d.

a. More efficient and realistic

*SITUATION 15* 2. For helping his friend market the project, what type of compensation should Arch. Casia recieve? a. Multiple of Direct Personnel Expenses b. Professional fee + Expense Reimbursable c. Professional Fee + Expense Reimbursable d. Percentage of Construction Cost

a. Multiple of Direct Personnel Expenses

Government agency for "slum dwellers" a. NHA b. HUDCC c. LGU d. DSWD

a. National Housing Authority (NHA)

It is charged with the main function of coordinating government housing agencies to ensure the accomplishment of the National Shelter Program. a. NHA b. HUDCC c. NEDA d. HLURB

a. National Housing Authority (NHA)

A newspaper editor approaches an Architect for an interview. a.Is it okay to ask to be paid for the interview? b. Is it ethical to endorse a product?

a. No b. No

These are areas often located in the country sides or rural areas where commercial/industrial and other buildings are sparsely constructed or may be clustered in small groups like farm lands wherein dwellings are built of indigenous materials such as bamboo, sawali, nipa, cogon, palm leaves and wood up to Types I and II Construction. a. Non-Fire Restricted Zone b. Moderate Fire Restrictive Zone c. Fire Restrictive Zone d. Highly Fire Restrictive Zone

a. Non-Fire Restricted Zone

In bidding, what is the Role of the Architect? a. Organizing the bidding b. Award the Project to the Contractor c. Choose the Construction Manager d.

a. Organizing the bidding

*SITUATION 2: Mr. Yao is a very studious person. He first graduated Civil Engineer and then after passing the Licensure Board Examination for Civil Engineers decided to continue his studies and ultimately became a Registered and Licensed Architect. Not yet contented, he also passed the Master Plumber Licensure Examinations. As a professional with so many licenses, he became very busy with his numerous projects as he too became a Contractor.* 1. Because Mr. Yao is so busy, he can no longer handle the construction of his own house. He hires a person to supervise its construction. To whom is this person technically under? a. Owner b. Contractor c. Architect d. Engineer

a. Owner

It is the document describing the relationship between Owner and Contractor a. Owner-Contractor Agreement b. Service Agreement c. Good Food Certificate d. Gentleman's Agreement

a. Owner-Contractor Agreement

Who is responsible for the implementation of RA 9266? a. PRBoA b. OBO c. DPWH d. The Commission and the Board

a. PRBoA

A foreign architect working in the Philippines without the necessary permits can be sued by a. PRC b. IAPOA c. Any Architect d. Anyone

a. PRC

Who accredits the national organization of architects? a. PRC b. PRBoA c. President d.

a. PRC

It is the most common method of compensation which is also fair both the Client and the Architect a. Percentage based on Project Cost b. Professional Fee plus Expenses c. Lump Sum d. M.D.P.E.

a. Percentage based on Project Cost

It is a bond that is an approved form of security furnished by the contractor as a guarantee to execute work in accordance with the terms of the contract a. Performance Bond b. Proposal Bond c. Payment Bond d. Guarantee Bond

a. Performance Bond

For violations of the NBCP. the Secretary is empowered to prescribe and impose fines not exceeding a. Php 10,000 b. Php 20,000 c. Php 50.000 d. Php 100,000

a. Php 10,000

Where does Planning services fall in the Architect's Services? a. Pre-design Services b. Regular Services c. d.

a. Pre-design Services

If an Architect is suspected of unethical practice. Where should the case be filed? a. Professional Regulation Commission b. Department of Labor and Employment c. Professional Regulatory Board of Architecture d. Municipal Trial Court

a. Professional Regulation Commission

Who is responsible for carrying out the Architectural Design Plans and Details in the actual construction? a. Project Architect b. Project Engineer c. Project Manager d. Owner

a. Project Architect

The first phase for Architect's Regular Design Services a. Project Definition Phase b. Schematic Design Phase c. Design Development Phase d. Contract Document Phase

a. Project Definition Phase

Other function of an Architect a. Project Manager b. Fabricator c. Manufacturer d. Supplier

a. Project Manager

Who determines time and cost of the project? a. Project Manager b. General Contractor c. Owner d. Architect

a. Project Manager

Who has more authority and responsibilities between a Project Manager and a Construction Manager? a. Project Manager b. Construction Manager c. Depends on the Job Specifications d. None they are the same person

a. Project Manager

When is the first payment for an Architect? a. Proposal

a. Proposal

What should you do if a subdivision is fronting a busy highway? a. Provide a 5m local street b. Provide a 3m local street c. d.

a. Provide a 5m local street

As a Registered and Licensed Architect (R.L.A.), you made a good working relationship with the Contractor ABC after awarding them several projects. Now, Contractor ABC (the Client) wanted your services as the Architect for their new building. All this went smoothly until the Client wanted you to alter your plans to accommodate their additional requirements. You implemented their revisions but the Client was not satisfied with the result. They requested for another set of changes to the plans but you disagree with the proposed changes since the alteration being ask will result to violation with the local zoning regulations and the building code. The conflict eventually leads to a dispute between you and the Client. a. Based on Architect's Code of Ethical Conduct, you have a responsibility to whom in this situation? b. Where should the Client go if they wanted to file a complaint against you? c. Who should initiate the first move to settle this dispute?

a. Public b. Professional Regulation Commission (P.R.C.) c. The Architect

In 2004, an act to institutionalize the Use of an Alternative Dispute Resolution in the country took effect. Under this law, Construction Disputes will now go to Arbitration/Mediation instead of the regular courts. What is this Law? a. R.A. 9285 b. R.A. 9262 c. R.A. 9858 d. R.A. 9255

a. R.A. 9285 - Construction Industry Authority of the Philippines (Answer) b. R.A. 9262 - Philippine Commission on Women c. R.A. 9858 - Legitimization of Children Born to Minor Parents d. R.A. 9255 - Illegitimate Children to Use the Surname of their Father

What is the Fire Code of the Philippines? a. RA 9514 b. BP 1096 c. BP 344 d. RA 1185

a. RA 9514 RA 1185 was repealed by RA 9514

Architects business are usually involved in a. Design-Build b. Teaching c. Real Estate Development d. Design Consultancy

a. Real Estate Development Note: Verify Answer!

The Architect has chosen a bidder but the Owner doesn't approve. What can be done? a. Rebid b. Ask the Bidder to adjust Bid c. d.

a. Rebid

*SITUATION 18* 3. Where should Architect Y file a complain? a. RTC b. PRC c. Mayor's Office d. NBI

a. Regional Trial Court (R.T.C.)

Who is the R.L.P. (Registered and Licensed Professional) require to sign the Kitchen Layout Plan of the house? a. Registered and Licensed Architect b. Registered Master Plumber c. Registered and Licensed Sanitary Engineer d. None of the above

a. Registered and Licensed Architect

Who is the R.L.P. (Registered and Licensed Professional) require to sign the T&B Layout Plan of the house? a. Registered and Licensed Architect b. Registered Master Plumber c. Registered and Licensed Sanitary Engineer d. None of the above

a. Registered and Licensed Architect

Who is the R.L.P. (Registered and Licensed Professional) responsible for the Architectural Design of a 3-Storey Residence? a. Registered and Licensed Architect b. Registered Master Plumber c. Registered and Licensed Sanitary Engineer d. None of the above

a. Registered and Licensed Architect

Mayor A wants to build a new Health Care Facility for his constituents. He asks his Municipal Architect, Arch. B, to design this facility given a specific budget Arch. B obliged but after completing his design, he found out that his design went over the specific budget allocated for the project. What should Arch B recommend to Mayor A. a. Replan and find a better solution that may meet the required budget b. Start the structure phase-by-phase as it is a common practice c. Remove less important space to meet the budgetary requirement d. Architect B can recommend 1 or all of the said options

a. Replan and find a better solution that may meet the required budget

*SITUATION 12* 3. Where should they register their business? a. SEC b. DTI c. City Hall d. BIR

a. SEC

What is covered by Comprehensive Architectural Services? a. SPP Doc. 201-205 b. SPP Doc. 202-206 c. SPP Doc. 202-207 d. SPP Doc. 203-208

a. SPP Doc. 201-205

Foreign Architects are can be allowed to practice in the Philippines provided that they secure a special/temporary permit from the Board subject to the approval of the Commission. Provided, further, that there is reciprocity afforded to Filipino Architects in their country, that they are legally qualified to practice architecture in their country, and that they must work with a Filipino counterpart. In which Section of RA 9266 will you find this provision? a. Sec. 37 b. sec. 38 c. Sec. 39 d. sec. 40

a. Sec. 37

Under the Revised IRR of the NBCP, what is the specific Subsection that provides for the signing and sealing of architectural documents? a. Section 302.3 b. Section 303.3 c. Section 303.2 d. Section 302.2

a. Section 302.3

Before submitting sketches to a client, what must the Architect first do? a. Sign a service agreement b. Discuss about image board for presentation c. d.

a. Sign a service agreement

A full-time supervisor hired by the Owner in behalf of the Architect-of-Record (A.o.R.) is called a. Site Architect b. Site Inspector c. Project Representative d. Project Engineer

a. Site Architect

What is the preferred design for a stair considering users of crutches? a. Slanted Nosing b. Projected Nosing c. Open Riser Stairs d. Right Angle Stairs

a. Slanted Nosing

Who is liable for a project if there is a Foreign Concept Architect hired by the Owner with a Registered and Licensed Architect (R.L.A) as an Architect of Record? a. The R.L.A. b. The owner c. The Foreign Concept Architect d.

a. The R.L.A.

*SITUATION 7* 2. After passing the FLEA, his company had a big project. He was the one to made all the drawings. To whom is he liable? a. To the Company b. To the Philippine Government c. To the Saudi Government d. None

a. To the Company

A 5th year Architecture student is asked and contracted by his aunt to design a 2 storey residence for her. After the student finished preparing all the Architectural plans, he ask his professor to sign and seal it. The professor agrees to do it for a sum of Php. 6000.00. a. Is there anything wrong with this practice? b. If yes, who is liable? c. What is the case if ever?

a. Unethical b. The Architect (Professor) c. Fraud / estafa

It is the basis for determining the MINIMUM sidewalk width for public convenience. a. Volume of people passing through b. Consider PWD and accessibility c. Space for vendors d. Shrubs, Trees and sidewalk accessories

a. Volume of people passing through b. Consider PWD and accessibility c. Space for vendors d. Shrubs, Trees and sidewalk accessories

In construction, what is usually awarded as a sub-contract by the contractor or the client and not part of the general contract? a. Waterproofing b. Tiling c. d.

a. Waterproofing

*SITUATION 3* 3. This is an "Alternative" Start to a career in Architecture. a. Work as an employee in an Architectural Firm to gain more experience b. Take a risk and establish your own firm c. Establish a firm with your friends d. Go abroad

a. Work as an employee in an Architectural Firm to gain more experience

Which Of the following is not part of RROW? a. Yard b. Curb c. Carriageway d. Sidewalk

a. Yard

*SITUATION 6: An architect drew up plans for a family... the owners went abroad... after a year, the owners returned but instructed the architect to help them find a new lot... the task would entail the architects personal time...* 1. What stage in the Architect's services will the Architect perform? a. Pre-design Services b. Regular Design Services c. Comprehensive Arch'l Services d. Specialized Allied Services

a. pre-design services (spp 201)

To be fair to the Contractor, the Architect must a. promptly inspect the work accomplishment b. reject inferior workmanship c. d.

a. promptly inspect the work accomplishment

As per BP 344 a ramp that leads down towards a sidewalk should be a. provided by railing across the full width of its lower end, not than 1.80m from the foot of the ramp. b. equipped with curbs on one side only with a minimum height of 0.20m c. provided by handrails on one side d. provided a 90-degree turn

a. provided by railing across the full width of its lower end, not than 1.80m from the foot of the ramp.

Under Sec. 22 of R.A. 9266, the board may refuse to issue a Certificate of Registration and Professional Identification Card to a person. a. who has paid money to secure a Certificate of Recognition b. who is of unsound mind c. who has falsely impersonated a practitioner or a former practitioner d. who has undertaken architectural services without a valid service agreement

a. who has paid money to secure a Certificate of Recognition

It is exempted from the provisions of the NBCP, a. Public Buildings b. Traditional Indigenous Family Dwellings c. Structures less than Php 20.000 d. Churches

b. *Traditional Indigenous Family Dwellings* - a dwelling constructed of native materials such as bamboo, nipa, logs, or lumber, the total cost of which does not exceed fifteen thousand pesos (P 15,000.00).

What is the maximum horizontal distance of a switch from the latch side of the door. a. 0.10 m b. 0.20 m c. 0.30 m d. 0.40 m

b. 0.20 m

Urinals should have an elongated lip whose maximum height is? a. 0.45 m b. 0.48 m c. 0.50 m d. 0.60 m

b. 0.48 m

The minimum height of knee recess for lavatories when considering PWD is a. 0.50 m b. 0.60 m c. 0.70 m d. 0.80 m

b. 0.60 m

Under BP 220, the minimum clear width of a Bedroom Door is a. 0.60 m b. 0.70 m c. 0.80 m d. 0.90 m

b. 0.70 m

Preferable height of Doorknobs a. 0.82 m b. 0.90 m c. 1.00 m d. 1.06 m

b. 0.90 m

Under the New Fire Code, if there are 50 or less occupants, what is the minimum stair width? a. 0.715 b. 0.915 c. 1.12 d. 1.42

b. 0.915

As per RA 9514, what is the minimum width of egress? a. 0.900 m b. 0.915 m c. 1.000 m d. 1.100 m

b. 0.915 m

Under the FCP, the minimum width of egress shan NOT be less than a. 0.900 m b. 0.915 m c. 1.120 m d. 1.420 m

b. 0.915 m

Under the Fire Code, what is the minimum width of stairs where there are less than 50 occupants? a. 0.900 m b. 0.915 m c. 1.120 m d. 1.420 m

b. 0.915 m

What is the width of a walkway as access going to the parking for the physically challenged? a. 1.50 b. 1.20 c. d.

b. 1.20

As per BP 344. what is the minimum width for a Corridor? a. 1.10 m b. 1.20 m c. 1.40 m d. 0.90 m

b. 1.20 m

For parking areas of PWD, a walkway between the front ends of parked cars shall have a minimum clear width of a. 1.10 m b. 1.20 m c. 1.30 m d. 1.40 m

b. 1.20 m

What is the minimum depth of a Central Refuge? a. 1.0 m b. 1.5 m c. 2.0 m d. 2.2 m

b. 1.5 m

What is the Fire Rating of Fire Exit Doors a. 1.00 hr b. 1.50 hrs c. 2.00 hrs d. 3.00 hrs

b. 1.50 hrs

A circle of ___ in diameter is a suitable guide in the planning of wheelchair turning spaces. a. 1.10 m b. 1.50 m c. 1.75 m d. 2.00 m

b. 1.50 m

What is the minimum dimension of a Kitchen? a. 2.00 m x 3.00 m b. 1.50 m x 2.00 m c. 1.50 m x 1.50 m d. 2.00 m x 2.00 m

b. 1.50 m x 2.00 m

Water Closet Stalls should have a minimum dimension of? a. 1.50 m b. 1.70 m c. 1.80 m d. 1.90m

b. 1.70 m

What is the unit area per occupant of a Classroom? a. 1.50 sqm b. 1.80 sqm c. 2.00 sqm d. 1.90 sqm

b. 1.80 sqm d. 1.90 sqm NOTE: as per PD 1096 = 1.80 as per RA 9514 = 1.90

After all the Contract Documents have been given to the Owner, how much is the liability from the remaining professional fee? a. 15% b. 10% c. 5% d.

b. 10%

For a simple residential project, how much of the Project Cost will you allocate for Contingencies? a. 5% b. 10% c. 15% d. 20%

b. 10%

The Architect, minimum basis fee for a Residential project? a. 12% b. 10% c. 6% d. 8%

b. 10%

For projects more than 1 hectare in area, how much is the minimum area allocated for Parks and Playgrounds? a. 50 sqm b. 100 sqm c. 125 sqm d. 150 sqm

b. 100 sqm

Air Space requirement for a school room per person a. 3 cum/person b. 12 cum/person c. 14 cum/person d. 16 cum/person

b. 12 cum/person

For Group A Dwellings, the minimum design Wind Load for the Roofs shall be a. 100 kg/sqm b. 120 kg/sqm c. 140 kg/sqm d. 150 kg/sqm

b. 120 kg/sqm

For how many years is the Civil Liability under Article 1723 of the Civil Code? a. 10 b. 15 c. 20 d. 25

b. 15 *The Civil Code, Article 1723, declares the liability for damages in any structure by reason of defects in its construction or use of inferior materials. The limited coverage of this provision allows the engineer, architect or contractor to avoid liability arising from nonobservance of plans and specifications or the use of materials of inferior quality. - Introduced by Senator Miriam Defensor Santiago *

After how many days can a Contractor stop work if the Architect's approval for the change of work is delayed? a. 10 days b. 15 days c. 30 days d.

b. 15 days

For Group A Dwellings, the minimum design load for the Floor at the Second Floor shall be a. 100 kg/sqm b. 150 kg/sqm c. 200 kg/sqm d. 250 kg/sqm

b. 150 kg/sqm

Under BP 344 the maximum slope/gradient for ramps is a. 1:10 b. 1:12 c. 1:14 d. 1:16

b. 1:12

For Group A Dwellings, how many (minimum) building Entrance/Exit should be provided? a. 1 b. 2 c. 3 d. 4

b. 2

Under the NBC, what is the minimum dimension of a room for Human Habitation? a. 1.5 m b. 2 m c. 1.20 m d. 0.60 m

b. 2 m

As per PD 1096, what is the minimum horizontal dimension of court in meters? a. 1.00 b. 2.00 c. 1.50 d. 3.00

b. 2.00 Every court shall have *a width of not less than 2.00 meters* for one (1) or two (2) storey buildings. However, if the court is treated as a yard or vice versa, this may be reduced to not less than 1.50 meters in cluster living units such as quadruplexes, rowhouses and the like, with adjacent courts with an area of not less than 3.00 sq. meters. Provided further, that the separation walls or fences, if any, shall not be higher than 2.00 meters.

As per BP 220, the minimum Ceiling height for habitable rooms Shall be a. 1.80 m b. 2.00 m c. 2.10 m d. 1.90 m

b. 2.00 m

Under BP 220, the maximum length of a Block is 400 meters. However, Block lengths exceeding 250 meters should be provided with an Alley approximately at midlength. How wide is this alley? a. 1.50 m b. 2.00 m c. 3.00 m d. 5.00 m

b. 2.00 m

What is the minimum headroom when a duct crosses the hallway a. 2.36 m b. 2.10 m c. 2.63 m d. 2.21 m

b. 2.10 m

Height of ceiling at 5th floor with Natural Ventilation a. 2.10 m b. 2.70 m c. 2.40 m d. 1.80m

b. 2.70 m

What is the minimum ceiling height at the ground floor for Habitable Rooms with Natural Ventilation? a. 2.10 m b. 2.70 m c. 2.40 m d. 1.80m

b. 2.70 m

As per BP 220, the prescribed % of Open Space for Residential Inside Lot is a. 50 b. 20 c. 10 d. 5

b. 20

Under PD 957 and BP 220, how many units shall be the maximum number for row houses per block/ cluster? a. 15 b. 20 c. 10 d. 30

b. 20

Maximum height for a stair riser a. 150 mm b. 200 mm c. 250 mm d. 300 mm

b. 200 mm

Under BP 220, what is the minimum floor area for a Single-Family Economic dwelling? a. 18 sqm b. 22 sqm c. 28 sqm d. 36 sqm

b. 22 sqm

Under the NBCP, what is the minimum width of run if it is to be used as an exit? a. 250 mm b. 275 mm c. 300 mm d. 325 mm

b. 275 mm

After Project Completion and making good any defect, a typical Retention is released after a. 1 month b. 3 months c. 6 month d. 12 months

b. 3 months

Under the NBC, what is the minimum area of a kitchen? a. 6 sqm b. 3 sqm c. 1.20 sqm d. 8 sqm

b. 3 sqm

Minimum signage height of a building that is NOT arcaded a. 4.0 m b. 3.0 m c. 5.0 m d. 6.0 m

b. 3.0 m

The minimum arcade height above the established sidewalk grade is a. 4.0 m b. 3.0 m c. 5.0 m d. 6.0 m

b. 3.0 m

Under BP 220, what is the minimum lot frontage for Socialized Row Houses? a. 8 m b. 3.5 m c. 4 m d. 6 m

b. 3.5 m

A. standard truck or bus parking/loading slot must be computed at a minimum of? a. 2.5001 x 6.00m b. 3.60m x 12.00m c. 3.60m x 18.00m d. 3.00m x 900m

b. 3.60m x 12.00m

What is the distance of the Building Main Entrance to the Elevator? a. 40 m b. 30 m c. 20 m d. 50 m

b. 30 m

Under BP 344, what is the minimum diameter of a Handrail that requires a full grip? a. 20 mm b. 30 mm c. 40 mm d. 50 mm

b. 30 mm

For both economic and socialized housing under BP 220 with a density of 200 lots per hectare, how much in percentage of the gross area is allocated for Parks and Playgrounds? a. 3.5 b. 4.0 c. 5.0 d. 6.0

b. 4.0 (151(4%) = +10(5%); +15(6%) ; +25(7%); +25(9%))

What is the minimum front setback for R-4? a. 3.0 m b. 4.5 m c. 5.0 m d. none of the above

b. 4.5 m

For a simple residential project, how much of the Project Cost will you allocated for Labor Cost? a. 30% b. 40% c. 25% d. 35%

b. 40%

The Architect's fee for repetitive housing (3rd Unit). a. 60% b. 40% c. 30% d. 20%

b. 40% 100% of R.P.F. for the type of building - 1st building 50% of R.P.F. for the type of building - 2nd building 40% of R.P.F. for the type of building - 3rd building 30% of R.P.F. for the type of building - 4th and succeding buildings

Minimum signage height of a building that is arcaded a. 4.0 m b. 5.0 m c. 3.0 m d. 6.0 m

b. 5.0 m

Foundations may be permitted to encroached into public sidewalk areas provided that the top of the said foundation is not less than 600mm below the established grade: and provided further, that said projections does not obstruct any existing utility such as power, communication, gas, water, or sewer lines, unless the owner concerned shall pay the corresponding entities for the rerouting of the parts of the affected utilities. What is the maximum width: in millimeters. allowed for such an encroachment? a. 300 b. 500 c. 600 d. 750

b. 500

As per RA 9514, how many sets of Architectural Plans and Specifications are needed for the purpose of obtaining a Fire Safety Evaluation Clearance (FSEC)? a. 5 b. 6 c. 7 d. 8

b. 6

Distance of parking for the disabled from building entrance a. 50 m b. 60 m c. 80 m d.

b. 60 m

For a simple residential project, how much of the Project Cost will you allocate for Material Cost? a. 70% b. 60% c. 55% d. 65%

b. 60%

Under the NBCP, private stairways serving an occupant load of less than 10 should have a minimum width of a. 600 mm b. 750 mm c. 800 mm d. 900 mm

b. 750 mm

A client is very happy with the Plans his Architect made for his house. He decided that he will use the Design/ Plans for his son's house. How much will the Client pay the Architect for his 2nd house? a. 90% b. 80% c. 70% d. 60%

b. 80% According to the *NEW* UAP-IAPOA Doc. 202: Group 6 100% of R.P.F. for the type of building - 1st building 50% of R.P.F. for the type of building - 2nd building 40% of R.P.F. for the type of building - 3rd building 30% of R.P.F. for the type of building - Succeeding According to *OLD* UAP-IAPOA Doc. 202: Group 6 100% of R.P.F. for the type of building - 1st building 80% of R.P.F. for the type of building - 2nd building 60% of R.P.F. for the type of building - 3rd building 40% of R.P.F. for the type of building - Succeeding

Group A Dwellings under PD 1096 on an inside lot should occupy no more than how many percent of the lot? a. 90% b. 80% c. 70% d. 60%

b. 80% For Corner lot: Not more than 90%

Mr. Juan Zubiri commissioned you for a restaurant project last year. Due to the success of the restaurant, he wants you to do a 2nd restaurant using the same design. What would be your fee? a. 60% of the basic fee b. 80% of the basic fee c. 30% of the basic fee d. 40% of the basic fee

b. 80% of the basic fee According to the *NEW* UAP-IAPOA Doc. 202: 100% of R.P.F. for the type of building - 1st building 50% of R.P.F. for the type of building - 2nd building 40% of R.P.F. for the type of building - 3rd building 30% of R.P.F. for the type of building - 4th and succeding buildings According to the *OLD* UAP-IAPOA Doc. 202: 100% of R.P.F. for the type of building - 1st building 80% of R.P.F. for the type of building - 2nd building 60% of R.P.F. for the type of building - 3rd building 40% of R.P.F. for the type of building - 4th and succeding buildings

As per NBCP (Only), what is the minimum dimension Of an Aisle serving only ONE side? a. 1200 mm b. 800 mm c. 1000 mm d. 900 mm

b. 800 mm

*SITUATION 10: Architect Guevarra was comissioned to do a residential project. Everything worked out until everything was done except that the owner ran out of budget to start the construction.* 1. According to the law, how much is Arch. Guevarra entitled to collect? a. 80% b. 90% c. 100% d. 85%

b. 90%

Under specialized architectural services, what involves the detailed planning and design to control sound transmission for compatibility with the architectural design concept? a. Architectural Interior Services b. Acoustic Design Services c. Architectural Programming d. Architectural Lighting layout

b. Acoustic Design Services

Who does the Architect approach for the Sound Control? a. Electronics Engineer b. Acoustic Engineer c. Electrical Engineer d. DJ

b. Acoustic Engineer

*SITUATION 14: A Contractor has a son who was born in the Philippines but was raised and educated in New York. His son, John, is a licensed architect in New York. Upon his father's prodding, Arch. John returned to the Philippines to be with his father. However, instead of joining his father's firm, he decided to set up his own firm.* 1. The son's firm submitted drawings to the OBO for building permit but the drawings were rejected. What went wrong? a. John's firm is not registered with DTI/SEC b. Arch. John is not allowed to practice Architecture in the Philippines c d

b. Arch. John is not allowed to practice Architecture in the Philippines

Who is liable for this unprofessional act? a. Allan b. Arch. Luna c. Owners d. All of them

b. Arch. Luna

Who can sign as the Professional-In-Charge of the Construction a. Master Plumber b. Architect c. Environmental Planner d. Mechanical Engineer

b. Architect

Who is responsible for making/producing Architectural Drawings a. Draftsman b. Architect c. Engineer d. Office Staff

b. Architect

Who own the plan? a. Engineer b. Architect c. Owner d. Contractor

b. Architect

Who prepares the Bill of Materials? a. Owner b. Architect c. Contractor d. Trainee

b. Architect

Who prepares the preliminary Estimates? a. Owner b. Architect c. Contractor d. Trainee

b. Architect

Who should sign Architectural Drawings a. Foreman b. Architect c. Consultant d. Draftsman

b. Architect

Who approves the PERT-CPM chart? a. Owner b. Architect c. Contractor d, Project Engineer

b. Architect *The program (or project) evaluation and review technique (PERT) is a statistical tool used in project management, which was designed to analyze and represent the tasks involved in completing a given project. First developed by the United States Navy in the 1950s, it is commonly used in conjunction with the critical path method (CPM).*

Who checks the Shop Drawings? a. Contractor b. Architect c. Engineer d. Supplier

b. Architect or a. Contractor Note: Verify the Answer!

This is an expensive and time-consuming method of selecting an Architect. a. Direct Selection b. Architectural Design Competition b. Comparative Selection d. Bidding

b. Architectural Design Competition

What is NOT usually employed by the Owner in commissioning a small residential project? a. Bidding b. Architectural Design Competition c. Direct Selection d.

b. Architectural Design Competition

Which is NOT part of Regular Design (S.P.P. Doc. 202)? a. Design Development b. Architectural Programming c. Contract Document d. Schematic Design

b. Architectural Programming

You were hired as an Architectural Research Writer. Of the following, which would you need to know the most? a. Design trends b. Architectural Writing and their Styles c. History of Architecture. d. Building Materials

b. Architectural Writing and their Styles

What is RA 9266? a. Architecture Act of 2003 b. Architecture Act of 2004 c. Architecture Act of 2005 d. Architecture Act of 2006

b. Architecture Act of 2004

*SITUATION 3* 4. You want to be updated on the latest trends in Building Construction. What should you do? a. Attend social activities of your Professional Organization b. Be an Active member of your Professional Organization c. Be the Organization d. You are the only one in the Organization

b. Be an Active member of your Professional Organization

*SITUATION 4: You are now a veteran Architect with your own firm...* 1. As an Architect, you have a responsibility to your people. Which of the following would you do to best show this? a. Train them to be good in their profession b. Be an example of how to become a good professional c. Give them overtimes d.

b. Be an example of how to become a good professional

When is the best time for an Architect to do several development projects? a. During Design Competitions b. Before Project is Conceived c. During Design Development d.

b. Before Project is Conceived

If an Architect is hired as a Building Administrator, what is his primary function? a. Collection of Rent b. Building Maintenance c. Supervision of Building Personnel d.

b. Building Maintenance

A permit secured prior to the Commencement of a Project. a. Excavation Permit b. Building Permit c. ECC d. Sidewalk Permit

b. Building Permit Note: *ECC - Environmental Compliance Certificate

What do you call the plan wherein it is viewed as if looking upwards instead of its normal view from the top a. Lighting Plan b. Ceiling Plan c. Electrical Plan d. Inverted Plan

b. Ceiling Plan

A CEI is issued if upon inspection it was found out that the building has met or complied with the necessary provisions of the code. CEI stands for a. Complete Electrical Installation b. Certificate of Environmental Inspection c. Certificate of Engineering Inspection d. Certificate of Electrical Inspection

b. Certificate of Environmental Inspection

After a Change of Use of a building, what should be secured? a. Fire Safety Inspection Certificate (FSIC) b. Certificate of Occupancy c. Building Permit d.

b. Certificate of Occupancy

After a Change of use (Renovation) Of the Building, what should be secured? a. Fire Safety Inspection Certificate b. Certificate of Occupancy c. Certificate of Completion d. Certificate of Final Payment

b. Certificate of Occupancy

Before a building can be used, what should be secured? a. Building Permit b. Certificate of Occupancy c. Sanitary Permit d. Certificate of Completion

b. Certificate of Occupancy

A Fire involving flammable liquids and gases is classified as? a. Class A b. Class B c. Class C d. Class D

b. Class B

Which type of fire extinguisher will you use for flammable liquids? a. Class A Fire Extinguisher b. Class B Fire Extinguisher c. Class C Fire Extinguisher d. Class D Fire Extinguisher

b. Class B Fire Extinguisher

*SITUATION 3* 2. Your friend, upon learning that you are now a Registered and Licensed Architect referred his Aunt to you who as fate would have it was looking for an Architect to design her dream house. You are going to meet your friend's Aunt for the first time, what attire will you wear? a. Business Attire - a suit to show that you are a professional and will approach this project in such a way thereby establishing a professional relation b. Clean, Presentable and Comfortable - to make the client comfortable and establish a friendly relation c. Rugged - to convey to the client that you are easy to talk to and is willing to negotiate and cut cost d. Any - client will hire me based on my skills as an architect and not on how I look

b. Clean, Presentable and Comfortable - to make the client comfortable and establish a friendly relation

A collective term that is used to refer to a group of firefighters primarily performing fire suppression activities in areas such as: but not limited to, community/barangay, company, and other government and non-government establishments. a. Fire Volunteers b. Community Fire Brigade c. Fire Brigade d. Government Fire Brigade

b. Community Fire Brigade

*SITUATION 13: Ana wants to build a rest house in her lot at Tagaytay. She talked with her friend, Arch. A, about the project. Ana's daughter also recommended Interior Designer B to her mom. However, while browsing a magazine, she learned about Architect C, who also happens to be an Interior Designer at the same time.* 1. What is the best method for her to select the designers? a. Select Architect A, since A is a friend b. Comparative Selection c. Design Competition d.

b. Comparative Selection

In medium-sized construction, who plans the time-schedule? a. Supervisor b. Construction Manager c. Architect d.

b. Construction Manager

Who is responsible for shortening the time of Construction a. Architect b. Construction Manager c. Construction Supervisor d. Owner

b. Construction Manager

A Registered and Licensed Architect permitted to practice under RA 9266 who is Professionally and Academically qualified and WITH exceptional or recognized expertise or specialization in any branch of architecture. a. Architect-of-Record b. Consulting Architect c. Architect-in-Charge of Construction d. Contractor

b. Consulting Architect

Who is NOT liable under Article 1723 of the Civil Code? a. Architect-of-Record b. Consulting Architect c. Architect-in-Charge of Construction d. Contractor

b. Consulting Architect *The Civil Code, Article 1723, declares the liability for damages in any structure by reason of defects in its construction or use of inferior materials. The limited coverage of this provision allows the engineer, architect or contractor to avoid liability arising from nonobservance of plans and specifications or the use of materials of inferior quality. - Introduced by Senator Miriam Defensor Santiago *

At what stage are specification done? a. Design Development Phase b. Contract Document Phase c. Schematic Design Phase d. Project Definition Phase

b. Contract Document Phase

What do you call Working Drawings, Specifications, Estimates and General Conditions? a. Construction Drawings b. Contract Documents c. d.

b. Contract Documents

What is needed in applying for a Building Permit if the applicant is the NOT the Owner? a. current Real Property Tax Receipt b. Contract of Lease/Deed of Absolute Sale c. CTC or TCT d. Tax Declaration

b. Contract of Lease/Deed of Absolute Sale fyi. Certified True Copies (CTC) - to ensure its authenticity of lot Transfer Certificate of Title (TCT) - lot boundaries

Who is responsible in asking for a Final inspection of a project? a. Architect b. Contractor c. Engineer d. Owner

b. Contractor

Who is the the applicant of a Building permit? a. Architect b. Contractor c. Engineer d. Owner

b. Contractor

Who should be held responsible for damages/accidents at the site? a. Owner b. Contractor c. Architect d.

b. Contractor

Who usually secures the Building Permit and pays for it? a. Architect b. Contractor c. Engineer d. Owner

b. Contractor

Whose responsibility is to obtain a Certificate of Occupancy upon completion of the project? a. Architect b. Contractor c. Owner d.

b. Contractor

*SITUATION 12* 2. What kind of business organization will they form? a. Single Proprietorship b. Corporation c. Conglomeration d. Partnership

b. Corporation

Mr. Ayala wanted to have the Interiors Of his house renovated. Upon learning that his long-time friend Arch. D is now an Architect, he went to give him a visit at Arch. D's office at D & Z Partners. Mr. Z, Arch. D's partner is an Interior Designer, After several visits, Mr. Ayala was convinced and decided to push through with the project since the estimated project cost was within his budget. To whom should the project be awarded? a. Arch. D, since Mr. Ayala is a personal friend b. D & Z Partners, since in a partnership they should share everything plus Arch. D was using his office/resources at the partnership to conclude the deal c. Mr. Ayala can rightfully hire another Designer and can use the estimates/suggestions provided by his friend d. Mr. Z. since he is the Interior Designer

b. D & Z Partners, since in a partnership they should share everything plus Arch. D was using his office/resources at the partnership to conclude the deal

The transportation of goods is very important. Which is in-charge? a. LTO b. DOTC c. Office of the President d. DPWH

b. DOTC

*SITUATION 17: A lot has a depth of 30m and a frontage of 15m facing northeast. It has a 20m RROW with 1.5m sidewalk at both sides. The left side of the lot is a school building while at the right is an office mid-rise building. Located in the middle part of the intended facade of your project is a post. The site is still vacant and there is no water connection yet.* 1. 2. Who do you approach to have the "post" removed? a. Meralco b. DPWH c. OBO d MWSS

b. Department of Public Works and Highways (D.P.W.H.)

A "business" Architect deals with? a. Architectural Design b. Design-Build c. Professional Services d. Real Estate Development

b. Design-Build or d. Real Estate Development Note: Verify the Answer!!!!

Where no repair work is done except exchange of parts and maintenance a. Division G-1 b. Division E-3 c. Division D-3 d. Division E-2

b. Division E-3

Plans, Models and Perspectives are a. Instruments of Practice b. Documents for Presentation c. d.

b. Documents for Presentation

Which is NOT part of Pre-Design Services (S.P.P. Doc. 201)? a. Feasibility Studies b. Equipment Evaluation c. Consultation d. Site Selection and Analysis

b. Equipment Evaluation - S.P.P. Doc. 204 (Construction Services) *S.P.P. Doc. 201: Scope of Services* 1. Consultation 2. Pre-Feasibility Studies 3. Feasibility Studies 4. Site Selection and Analysis 5. Site Utilization and Land use Studies 6. Architectural Research 7. Architectural Programming 8. Space Planning 9. Space Management Studies 10. Value Management 11. Design Brief Preparation 12. Promotional Services

Your client ask you to determine the viability if a proposed development by providing a detailed analysis of the project. What are you providing? a. Consultation b. Feasibility Studies c. Site Utilization and Land-Use Studies d. Value Management

b. Feasibility Studies

The active principle of burning, characterized by the heat and light of combustion. a. Flame b. Fire c. Combustion d. Pyrotechnics

b. Fire

A fire resistive door prescribed for openings in fire separation walls or partitions. a. Self-Closing Door b. Fire Door c. Panic Door d. Auto-Release Door

b. Fire Door

Any condition or act which increases or may cause an increase in the probability of the occurrence of fire, or which may obstruct. delay, hinder or interfere with firefighting operations and the safeguarding of life and property a. Fire Lane b. Fire Hazard c. Fire Trap d. Explosive

b. Fire Hazard

A Wall designed to prevent or delay the spread of Fire. a. Fire Block b. Fire Wall c. Partition Wall d. Curtain Wan

b. Fire Wall

Attribute of an Architect that is most needed today a. Always ahead of the project's deadline b. Firm in all decisions and undertakings c. Flexible in handling commitments d. Accepts as many project as possible

b. Firm in all decisions and undertakings

The following needs to be signed and sealed by the architect except a. Reflected Ceiling Plan b. Foundation Plan c. Site Development Plan d. Technical Specifications

b. Foundation Plan

Who "locates" the points a. Architect b. Geodetic Engineer c. Civil Engineer d. Geotechnical Engineer

b. Geodetic Engineer *Geotechnical engineering* uses principles of soil mechanics and rock mechanics to investigate subsurface conditions and materials; determine the relevant physical/mechanical and chemical properties of these materials; evaluate stability of natural slopes and man-made soil deposits; assess risks posed by site conditions

*SITUATION 4* 3. How do you treat new members of the profession? a. Do not give overtime b. Give equal opportunities like senior members c. Let them attend seminars and trainings d. NOTA

b. Give equal opportunities like senior members

What does an Appraisal Architect do? a. Estimates a proposed project b. Gives value to a bldg. c. Determines faults in design/construction methods d. Formulates safeguards in work activity

b. Gives value to a bldg.

It is the most common method of compensation which is better for the Client? a. Percentage based on Project Cost b. Guaranteed Maximum Cost

b. Guaranteed Maximum Cost

It is the lead agency in the provision of technical assistance to local government units in the preparation of comprehensive land use plans; regulation of housing, land development and homeowners association; and adjudications of disputes related thereto. It is run by a 9-man Board headed by an ex-officio Chairman of whoever is the Chairman of the HUDCC. a. NHA b. HLURB c. NHMFC d. HGC

b. HLURB

Where will you have a Subdivision Plan approved? a. HUDCC b. HLURB c. NHA d. Local Government Unit

b. HLURB

A large project sometimes required different phases involving different architect/consultants per phase. A Concept Architect does the overall concept of the project. What is his liability. a. Same as the Architect-Of-Record b. He has no liability c. He has civil/administrative liability d. They all share the same liability

b. He has no liability

What is meant by R3 in residential zone? a. Medium density housing b. High density housing c. General density housing d.

b. High density housing

*SITUATION 7: After graduating from a BS Architecture course in the Philippines, Juan decided to work in Singapore. He worked there for 2 years and dedicated to go back to the Philippines to take Architectural Licensure Exam.* 1. What should he do to file his requirements? a. Fill out the DTE and let his Singaporean mentor sign it for him b. His mentor should be a Filipino RLA if working abroad to qualify c. He should just take the ALE in Singapore if it was offered there d. Have his DTE signed by another Filipino Architect in the Philippines

b. His mentor should be a Filipino RLA if working abroad to qualify

It is a way of passage through or around a wall or partition to an Area of Refuge on approximately the same level in the same building which affords safety from fire or smoke from the area of escape and areas communicating therewith. a. Fire Lane b. Horizontal Exit c. Corridor d. Safety Exit

b. Horizontal Exit

It is tasked to *formulate national objectives* for *housing and urban development* and to design broad strategies for the accomplishment of these objectives; to determine the participation and coordinate the activities of the key government housing agencies in the national housing program; to monitor, review and evaluate the effective exercise by these agencies of their assigned functions: to assist in the maximum participation of the private sector in all aspects of housing and urban development and to recommend new legislation and amendments to existing laws as may be necessary for the attainment of government's objectives in housing. a. NBA b. HUDCC c. NEDA d. HLURB

b. Housing and Urban Development Coordinating Council (HUDCC)

In Specs writing, how do you refer to money? a. How many b. How much c. Amount d. Volume

b. How much

I.A.P.O.A. is an acronym for? a. Irish American Police officers Association b. Integrated and Accredited Professional Organization of Architects c. Integrated Association of Professional and Organized Architects d. Integrated Architects of the Philippines Organically Associated

b. Integrated and Accredited Professional Organization of Architects

*SITUATION 16: Architect A is the principal architect of an Architectural Firm. Architects B & C are Junior Partners and they are in charge of the Design Team. However, it is still Architect A who signs and seals all the drawings. Recently, they hired Architects D & E, both RLA's, to be incharge of the Production Team.* 1. What is the position of Architect D & E? a. Draftsman b. Junior Architect c. Junior Partner d

b. Junior Architect

Under BP 344. ramps whose length is longer than the maximum length set should be provided 1.5m a. Dropped Curbs b. Landings c. Lay-aways d. Berths

b. Landings

*SITUATION 1* 3. Due to the delay caused by the collapse of the beam, the project completion time was delayed by over a month. The OWNER is asking to be compensated for the failure to complete the work within the time frame set forth in the contract. What do you call this? a. Punitive damages b. Liquidated damages c. Performance damages d. Contractor's all risk damages

b. Liquidated damages

This method of compensation is based on technical hours spent and is only applicable to non-creative work since the value of creative design cannot be measured by the length of time the designer has spent on his work. This is usually used for works such as accounting, secretarial, research, data gathering, preparation of reports and the like. a. Project Construction Cost (P.C.C.) b. Maximum of Direct Personnel Fee (M.D.P.E.) c. Professional Fee + Expenses(P.F.P.E.) d. Lump Sum or Fixed

b. Maximum of Direct Personnel Fee (M.D.P.E.)

Basic function of an open door a. Fire safety b. Means of access c. d.

b. Means of access

What is another term for C-3 or Commercial 3? a. Metropolitan 3 b. Metropolitan Commercial c. Business and Mercantile d. Circumferential 3

b. Metropolitan Commercial

*SITUATION 17* 2.Where do you apply for a temporary/permanent water connection? a. Brgy. Chairman b. MWSS c. DPWH d. OBO

b. Metropolitan Waterworks and Sewerage System (M.W.S.S.)

Any person not duly licensed to engage in the practice of architecture or any person who violates any provision of RA 9266, its IRR, the Code Of Ethical Conduct and Standards Of Professional or any policy of the Board or Commission, shall upon conviction be sentenced to a fine of not less than Php 100,000.00 but not more than Php 5,000,000.00 or to suffer imprisonment for a period not less than 6 months or not exceeding 6 years or both, at the discretion of the Court. He/she is guilty Of what? a. Infraction b. Misdemeanor c. Felony d. Estafa

b. Misdemeanor

In this zone, buildings are prescribed to have exterior walls with at least two-hour fire resistivity. Usual locations in suburban areas are permitted to be built with at least one-hour fire resistivity THROUGHOUT as Types II, III to IV Construction. a. Non-Fire Restricted Zone b. Moderate Fire Restrictive Zone c. Fire Restrictive Zone d. Highly Fire Restrictive Zone

b. Moderate Fire Restrictive Zone

What type of street is used for pedestrian, animals and bikers? a. Sidewalk b. Narrow Lane c. Main Artery d. Alley

b. Narrow Lane

A government agency that ensures food security a. Dept of Agriculture b. NFA c. NEDA d. IFO

b. National Food Authority (NFA)

It is the housing program of the government only for the under privileged and homeless citizens a. National Housing b. Socialized Housing c. Resettlement Program d.

b. National Housing

*SITUATION 16* 6. A close friend of Architect A asked him to design a high-rise beach-front Hotel. However, just before he could finish the work, he suffered a heart attack and died. Can his work be continued by others in the absence of such contingency in the contract? a. Yes, by the same firm b. No c. Yes whoever the Owner chooses d. Maybe

b. No

Is the office of the Building Official one and the same as the Office of the City/Municipal Engineers? a. Yes b. No c. d.

b. No

Under RA 9266, can a Registered and Licensed Architect perform Interior Design for small projects? a. Yes b. No c. Yes, provided there is consent from PRBOA d. Yes, if personal project

b. No Architectural Interior check (/)

*SITUATION 3* 7. To get a replacement P.R.C. Identification Card, you need to pay Php. 250 and present your? a. Special power of Attorney b. Notarized Affidavit of Loss c. 4 pcs. 2x2 picture d. Community Tax Certificate

b. Notarized Affidavit of Loss

If the Owner request for a model of the project, who pays for it? a. Architect b. Owner

b. Owner

Who gives the directive to start the project? a. Architect b. Owner c. Project Manager d. Contractor

b. Owner

Who is responsible for the compensation of a Specialized Allied Professional? a. Architect b. Owner c. Contractor d. Sub-Contractor

b. Owner

Who is responsible for the fee of an additional Full-time Supervisors at the Project? a. Architect b. Owner c. Contractor d. Sub-Contractor

b. Owner

Which law was amended by PD 1216, by defining 'open space' and requiring Subdivision Owners to provide roads, alleys, Sidewalks and reserve open for park or recreational use? a. BP 220 b. PD 957 C. PD 1096 d. BP 344

b. PD 957

Under BP 220, it shall have a width of 3.00m intended only to provide pedestrian access to property for socialized housing projects. shall have a maximum length of 60 meters. a. Alley b. Pathwalk c. Sidewalk d. Collector

b. Pathwalk

*SITUATION 1: Newlywed Architect Basha and Popoy decided to put up a Design firm. Architect Basha will do the Architectural plans while Engr. Popoy will take care of the Structural Design. Due to their hard work, good working relations and a bit of luck, they were able to get several projects. However, since they were just starting out, they decided to get the services of a Master Plumber on a per project basis for all their projects.* 1. How should they pay the Master Plumber? a. Fixed monthly Since it will be cheaper as he is taking care of all the projects anyway b. Per fixture, per project c. Percentage of Cost d. Per liner meter

b. Per fixture, per project

*SITUATION 5* 2. Due to the flooding and leaks, the whole house had to be rewired. After a successful mediation, Architect "A" continued with the project. How are Electricians paid? a. Lump sum b. Per outlet, switches and complexity c. Ask the Contractor d. Based on the Material Cost

b. Per outlet, switches and complexity

Any person who violates any provision of the NBCP shall upon conviction be punished by a fine not exceeding ____ or by imprisonment of not more than two years or by both such fine and imprisonment. a. Php 10,000 b. Php 20,000 c. Php 50,000 d. Php 100,000

b. Php 20,000

For violating the Code of Ethics. what is the minimum fine? a. Php 100,000 b. Php 200,000 c. Php 1,000,000 d. Php 5,000,000

b. Php 200,000 *same with service agreement

Architectural Programming, Research, Site Selection and Analysis, Feasibility Studies, Space Planning, Space Management, and Value Management, etc. are part of what services? a. Specialized Architectural Services b. Pre-Design Service c. Comprehensive Architectural Services d. Full-time Services

b. Pre-Design Service a. Specialized Architectural Services - SPP Doc. 203 c. Comprehensive Architectural Services - SPP Doc. 206 c. Full-time Services - SPP Doc. 204a

What type of Architectural service is provided for site utilization and feasibility studies? a. Regular Design Services b. Pre-Design Services c. Specialized Architectural Service d. Pre-Construction Services

b. Pre-Design Services

Who is responsible for shortening the time and lessening the cost of the project? a. Architect b. Project Manager c. Contractor d. Client

b. Project Manager

In a 15-storey Highrise building situated within a through lot with a frontage of 20 meters facing a major road and 15 meters depth. The rear of the lot faces a service road. The front and side has a setback of 8 meters and 5 meters respectively. What is the minimum number of fire exits? a. 2 main exits including the service stair b. Provide 3 exits from ground to floor, and 2 exits from 9th to the 15th floor c. d.

b. Provide 3 exits from ground to floor, and 2 exits from 9th to the 15th floor

*SITUATION 4* 2. As an Architect, how do you compensate your subordinates? a. Provide good workplace/environment b. Provide salary commensurate to work c. Provide minimum wage d. Set an example/be a mentor

b. Provide salary commensurate to work

What known as the "Architecture Act of 2004? a. RA 9622 b. RA 9266 c. PD 1097 d. PD 1185

b. RA 9266

Where does Contract Document fall in the Architect's Services? a. Pre-Design Services b. Regular Service c. d.

b. Regular Service

Any physical change made on buildings/structures to increase the value, quality, and/or to improve aesthetics a. Remodeling b. Renovation c. Addition d. Repair

b. Renovation

Remedial work done on any damaged or deteriorated portion/s of building/structure to restore to its original condition a. Renovation b. Repair c. Addition d. Alteration

b. Repair

For a partnership, which agency should they register with? a. DTI b. SEC c. d.

b. SEC

*SITUATION 8* 4. If Juan and his boss were to be partners in a firm in the Philippines, were should their company be registered? a. DTI only b. SEC only c. DTI, SEC & PRC only d. DTI & SEC only

b. SEC only

Who adopts the land use plan when HLURB already approved it a. Office of the mayor b. Sangguniang panglunsod C- DPWH d.

b. Sangguniang panglunsod

An Architect needs to show his client the entirety of the project in full 3D and realistic form, what is the best way to do this? a. Animation b. Scale Model c. Perspective d. Manual Sketch

b. Scale Model

Which is not a Structural Plan? a. Foundation Plan b. Schedule of Beams c. Floor Framing Plan d. Roof Framing Plan

b. Schedule of Beams

Which Section in R.A. 9266 provides that a foreign citizen may take the Philippine Licensure Examination for Architect? a. Sec. 26 b. Sec. 27 c. Sec. 28 d. Sec. 29

b. Sec. 27

The "Prohibition in the Practice of Architecture" in under which section in R.A. 9266? a. Sec. 23 b. Sec. 30 c. Sec. 33 d. Sec. 40

b. Sec. 30

Which Section in RA 9266 refers to Continuing Professional Development? a. Section 27 b. Section 28 c. Section 31 d. Section 33

b. Section 28

Specifications should be clear and easy to understand. What must be avoided? a. Superlative Adjectives b. Sentence with double meaning c. Quantitative Description d.

b. Sentence with double meaning

Under RA 9266 a person who requires or compels a Registered and Licensed Architect to undertake any service under the General Practice of Architecture without valid agreement shall be guilty of misdemeanor and shall upon conviction be fined an amount not less than Php 200.000.00 or suffer imprisonment for a period not exceeding six (6) years or both. This agreement is referred to in RA 9266 Rule Section 3.4.10 as a a. Notarized Work Agreement b. Service Agreement c. Owner-Architect Agreement d. Scope of Work

b. Service Agreement

*SITUATION 13* 2. Why is it best to select Architect C? a. She can get discount on ID services b. She can best interpret the Architectural Drawings for the Interior Design c. It's not best to choose Architect since you don't know her d.

b. She can best interpret the Architectural Drawings for the Interior Desig

When must the Architect properly apply the pertinent principles and techniques of Tropical Design to much the hot-humid tropical environment in the Philippines? a. During Contract Documentation b. Sometime during Design Development c. At the Schematic Design Phase of the work d. Answer not among the choices

b. Sometime during Design Development

When must the Architect properly locate/site a building with respect to natural and man-made hazards that may be found or proximate to the site and like consideration? a. During Contract Documentation b. Sometime during Design Development c. At the Schematic Design Phase of the work d. Answer not among the choices

b. Sometime during Design Development

When must the Architect properly locate/site a building with respect to the topography of a site, natural drainage characteristics of a site and the like? a. During Contract Documentation b. Sometime during Design Development c. At the Schematic Design Phase of the work d. Answer not among the choices

b. Sometime during Design Development

When must the Architect apply the pertinent principles and techniques of orienting a building in the Philippine Setting? a. During Contract Documentation b. Sometime during Design Development c. At the Schematic Design Phase of the work d. Answer not among the choices

b. Sometime during the Design Development

Where does planning Services fall? a. Regular Services b. Special Services c. Design and Planing Services d.

b. Special Services

An integrated network of hydraulically designed piping installed in a building, structure or area with outlets arranged in a Systematic pattern which automatically discharges water when activated by heat or combustion products from a fire. a. Standpipe System b. Sprinkler System c. Suppressant System d. Pyrophoric System

b. Sprinkler System

In the Construction Industry, what is meant by S.O.P. a. Setting-Out Point b. Standard Operating Procedure c. Suhol O Patong d. Stock Option Plan

b. Standard Operating Procedure

In the construction Industry, it is a person, firm or corporation that provides guarantee or undertakes an obligation to pay in the event of failure on the part of the Contractor to fulfill his part. a. Co-maker b. Surety c. Financer d. Owner

b. Surety

You were commissioned to do a Masterplan. What should you do first? a. Study the existing laws b. Survey the location c. Coordinate with the local government for tracing of history d. Direct all department heads

b. Survey the location

What is needed to determine the lot boundaries? a. LRA Certificate b. TCT c. Tax Declaration d. Real Estate Tax

b. TCT

What is the best way to provide for the convenience of both people in wheelchair and blind persons? a. Railings b. Tactile surfaces/blocks in the immediate vicinity of crossings c. Brightly painted Zebra crossing d. Light controlled crossings with pedestrian phases and audible signals

b. Tactile surfaces/blocks in the immediate vicinity of crossings

If there is a discrepancy between the text and drawing, which one will prevail? a. Drawing b. Text c. Ask the designing Architect d. Ask the Contractor

b. Text

*SITUATION 18: Arch. X is celebrating the 25th year anniversary of his office. He wants to be featured on a magazine. To lessen the amount that will be spent on being published, with his consent, he allowed his friend who is a writer to solicit from advertisers under his name.* 1. Is there anything wrong here? If there is, what/who is wrong in the situation? a. Nothing is wrong. This was done with everybody's consent and nobody was coerced into doing anything. b. The Architect is liable. c. The writer friend of Architect X. d. The advertisers

b. The Architect is liable.

Who can change the member of the P.R.B.O.A? a. P.R.C. Chair b. The President of the Philippines c. I.A.P.O.A. d. P.R.B.O.A. chair

b. The President of the Philippines

*SITUATION 5: During the summer holidays, a couple decided to have their house repaired. They acquired the service of Architect "A" for this project. However, they specifically asked Architect "A" to give the Roofing Repairs to their father who happens to be the roofing contractor. Everything went well until the rains came. Now, the house is flooding leaks coming everywhere. They asked Architect "A" to make good the defects but the Architect refused.* 1. Who is liable for the damages? a. Architect "A", he should have checked the work of the Roofing contractor b. The Roofing contractor, he was the one who repaired the roof c. The couple, they were the ones who asked that their father do it d. NOTA

b. The Roofing contractor, he was the one who repaired the roof

Why does an Architect need an Accountant? a. To know if he/she is financially stable. b. To keep his books and accounts in order c. To hide his income d. To prepare his/her S.A.L.N.

b. To keep his books and accounts in order NOTE: Statement of Assets, Liabilities and Net worth (S.A.L.N.)

What is preferred to control the movement of people inside a building? a. Limit access to 4 b. Well lighted hallway and stair c. d.

b. Well lighted hallway and stair

*SITUATION 9* 3. Was there any violation commited? a. Yes by Architect B againts the Code of Ethics b. Yes by Architect B against RA 9266 c. None. The Architect can offer his services to anyone he desires and at a compensation he so desires as the construction industry reacts to market situations and he must adapt in order to get clients. d. Yes by Architect B against RA 9266 and the Code of Ethics and by Owner A against RA 9266.

b. Yes by Architect B against RA 9266

Roof covering for all buildings shall be either fire-retardant or ordinary depending upon the fire-resistive requirements of the particular type of construction. Is the use of Combustible Roof Insulation allowed? a. No under NBCP b. Yes, if covered with approved roof covering applied directly thereto c. NO under FCP d, Yes, if sprinkler is provided

b. Yes, if covered with approved roof covering applied directly thereto

The CLUP is the blueprint for future physical development of cities and municipalities that is mandated under the Local Government Code (RA 7160) and enacted by the Sangguniang Panglunsod through a a. CBD Plan b. Zoning Ordinance c. Urban Land Use Map d.

b. Zoning Ordinance

Under RA 9514, a dead-end corridor may be allowed provided that a. the Fire Exit signage is clearly visible end wen lighted b. it shall not extend more than 6m beyond the stairway or other means of exit c. there is a Fire Hose along the corridor d. a Sprinkler System is introduced

b. it shall not extend more than 6m beyond the stairway or other means of exit

As of 2008, who is in-charge of allowing/disallowing buildings near Philippine Airports a. ATO b. OBO c. CAAP d. FAA

c. (CAAP) Civil Aviation of the Phils a. (ATO) Air Transportation Office b. (OBO) Office of the Building Official d. (FAA) Federal Aviation Authority

Under the 1977 NBCP, what are the maximum Rise and minimum Run dimension (in meters) of a stairway? a. 0.175 and 0.275 b. 0.2 and 0.275 c. 0.2 and 0.25 d. 0.2 and 0.28

c. 0.2 and 0.25

What is the minimum width of a stair under PD 1096? a. 0.90 m b. 0.70 m c. 0.75 m d. 0.80 m

c. 0.75 m

For a room without artificial ventilation whose dimension is 2.50m x 3.00m, which is the required minimum window opening? a. 0.65m x 1.20m b. 0.50m x 1.20m c. 0.75m x 1.00m d. 0.75m x 2.00m

c. 0.75m x 1.00m

Considering PWD, what is the maximum height for lavatories? a. 0.60 m b. 0.70 m c. 0.80 m d. 0.90 m

c. 0.80 m

Under BP 220, the minimum clear width of a Main Door is a. 0.60 m b. 0.70 m c. 0.80 m d. 0.90 m

c. 0.80 m

What is the maximum lavatory counter height for the disabled? a. 0.60 m b. 0.70 m c. 0.80 m d. 0.90 m

c. 0.80 m

What is the minimum dimension of an elevator door width? a. 0.70 m b. 0.75 m c. 0.80 m d. 0.85 m

c. 0.80 m *(asked 3 times) *

What is the maximum height for a Water Fountain? a. 0.75 m b. 0.80 m c. 0.85 m d. 0.90 m

c. 0.85 m

*SITUATION 3* 6. Due to your excitement at being a new Architect, you misplaced your P.R.C. Identification Card. You applied at P.R.C. for the replacement I.D. How long will you get your I.D. card? a. 7 working days b. 1 Month c. 1 Day d. 2 Weeks

c. 1 Day

What is the fire rating for a hotel room door? a. 1.5 hrs b. 30 mins c. 1 hr d. 20 mins

c. 1 hr

Allowable projection for the signage of a building that IS arcaded. a. 0.90 m b. 0.60 m c. 1.00 m d. 1 20 m

c. 1.00 m

Considering office space, what is the minimum clearance of a service zone So as not to obstruct walkways between 2 work units? a. 0.60 m b. 0.80 m c. 1.00 m d.

c. 1.00 m

Public Telephones should have a clear, unobstructed space of 1.50m x 1.50m in front Wall-Mounted and Free-Standing units. Coin slots, dialing controls, receivers and instructional signs should be locked at a maximum height of how many meters above the floor? a. 0.80 m b. 0.70 m c. 1.10 m d. 1.50 m

c. 1.10 m

For a RROW of 9.00 meters or more, the minimum width of the sidewalk on each side shall be? a. 0.90 m b. 1.00 m c. 1.20 m d. 2 40 m

c. 1.20 m

Under BP 344, ramps should have a minimum clear width Of a. 0.80 m b. 1.00 m c. 1.20 m d. 1.50 m

c. 1.20 m

Under the NBC, what is the minimum area for a T & B? a. 6 sqm b. 3 sqm c. 1.20 sqm d. 8 sqm

c. 1.20 sqm

What is the preferable height of lighting switches? a. 1.50 m b. 0.90 to 1.20 m c. 1.20 to 1.30 m d. 1.30 to 1.40 m

c. 1.20 to 1.30 m

Under BP 220. how much in terms of % of Gross Area is allocated for Community Facilities if there are 152 Dwelling Units? a. 1.00 b. 1.25 c. 1.50 d. 2.00

c. 1.50

From BP 344, What is the maximum width of a carriageway where a central refuge is not required? a. 6 m b. 8 m c. 10 m d. 12 m

c. 10 m

Under Article 1723 of the Civil Code, what is the prescription period for filing of cases if a building collapses? a. 1 year b. 5 years c. 10 years d. 15 years

c. 10 years *The Civil Code, Article 1723, declares the liability for damages in any structure by reason of defects in its construction or use of inferior materials. The limited coverage of this provision allows the engineer, architect or contractor to avoid liability arising from nonobservance of plans and specifications or the use of materials of inferior quality. - Introduced by Senator Miriam Defensor Santiago *

As per NBCP (Only), what is the minimum dimension of an Aisle serving BOTH sides? a. 1200 mm b. 800 mm c. 1000 mm d. 900 mm

c. 1000 mm

If you purchased 1 Million worth of furniture and equipment for the new office that you just set up, how much did you pay for the VAT? a. 305,658.52 b. 132,845.10 c. 107,142.86 d. 267,857.14

c. 107,142.86 (Note: To solve for VAT., you need to get the VATable amount first.) VATable = Cost/1.12 To check: VAT = Cost - Vatable VAT - VATable(12%)

In the determination of Room sizes, the Air Space requirement for a Workshop a. 3 cum/person b. 8 cum/person c. 12 cum/person d. 14 cum/person

c. 12 cum/person

A building permit shall expire and become null and void after how many months from issuance if work is not commenced? a. 3 months b. 6 months c. 12 months d. 18 months

c. 12 months / 1 year

Under BP 220, cul-de-sac shall have a maximum length of a. 80.00 m b. 100.00 m c. 120.00 m d. 150.00 m

c. 120.00 m

*SITUATION 9: Owenr A hired Architect B to design his condominium located in a commercial area. After several meetings, Architect B was able to produce a Schematic Diagram which Owner A subsequently approved. However, Owner A has a change in heart and decided that he doesn't want Architect B for the project* 1. How much compensation is Architect B entitled? a. 15% of the Construct price plus 5% for Breach of Contract b. 15% of Construction Cost c. 15% of the Contract Price d. 10% of Construction Cost

c. 15% of the Contract Price

As per PD 1096, all inner courts shall be connected to a street or yard, either by a passageway or a door through a room or rooms. What is the minimum width of this passageway? a. 1 00 b. 1.20 c. 2.00 d. 2.20

c. 2.00

For Buildings four (4) storeys or more in height, enclosing walls of floor openings serving stairways or ramps shall have a Fire Resistance rating of a. 1.00 hr b. 1.50 hrs c. 2.00 hrs d. 4.00 hrs

c. 2.00 hrs

What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation at the Second Floor? a. 2.10 m b. 2.70 m c. 2.40 m d. 1.80m

c. 2.40 m

What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation of a single-storey structure? a. 2.10 m b. 2.70 m c. 2.40 m d. 1.80 m

c. 2.40 m

For Group A Dwellings, the minimum design load for the Floor at the First Floor shall be a. 100 kg/sqm b. 150 kg/sqm c. 200 kg/sqm d. 250 kg/sqm

c. 200 kg/sqm

Your client asked you to demolish his current 5,000sqm 1 -storey warehouse and design a 3-storey Call Center building having 1,500sqm per floor. How many Water Fountain (Drinking Fountain) will you provide if the Client Simply wants to comply with the provisions of BP 344? a. 1 b. 2 c. 3 d. 4

c. 3

Your client asked you to design and convert his current 5,000 sqm, 1 -storey warehouse into a Call Center. How many Water Fountain (Drinking Fountain) will you provide if the client simply wants to comply with the provisions Of BP 344? a. 1 b. 2 c. 3 d. 4

c. 3 At least one (1) fountain shall be provided for every 2,000 sq.m. of floor area and there shall not be less than one (1) on each floor. Maximum height: 0.85 m. from the floor. if higher than 0.85, either provide paper cups or another lower fountain.

An accessible parking slot should have a minimum width of? a. 2.70 m b. 3.00 m c. 3.70 m d. 3.85 m

c. 3.70 m

Circular Stairways. Circular stairs may be used as an exit provided the minimum width of run is not less than a. 250 b. 275 c. 300 d. 325

c. 300

Winding Stairways. In Group A occupancy and in private stairways in Group B occupancies. winders may be used if the required width of run is provided at a point not more than ____ mm from the side of the stairway where the treads are narrower but in no Case shall any width of run be less than 150mm at any point. a. 250 b. 275 c. 300 d. 325

c. 300

Under PD 957, what is the minimum lot frontage for Row Houses? a. 8 m b. 3.5 m c. 4 m d. 6 m

c. 4 m

The erection of electric neon signboards or other advertisements of similar nature projecting over roadways or public streets shall be allowed provided that clear distance between signboards erected on one building is NOT less than a. 2.00 b. 3.00 c. 4.00 d. 1.20

c. 4.00

The records of test materials and of concrete must be preserved after the completion of the project for at least a. 2 years b. 3 years c. 5 years d.

c. 5 years

What is the standard progress of payment for an Architect's fee based on project phase? a. 5% - 10% - 35% - 85% - 95% - 100% b. 5% - 15% - 35% - 85% - 95% - 100% c. 5% - 15% - 20% - 50% - 90% - 100% d. 5% - 10% - 35% - 85% - 90% - 100%

c. 5% - 15% - 20% - 50% - 90% - 100%

Automatic closing Vestibule Doors shall be actuated by a Smoke Detector located within how many meters away from the door? a. 3 m b. 5 m c. 6 m d. 9 m

c. 6 m

Under BP 344, the length Of a ramp should NOT exceed a. 3 m b. 5 m c. 6 m d. 8 m

c. 6 m

As per PD 1096, what is the maximum distance to exit of a building if it is equipped with sprinklers? a. 45 m b. 46 m c. 60 m d. 61 m

c. 60 m

Under BP 220, what is the minimum lot area of a single detached socialized housing? (Asked twice) a. 36 sqm b. 54 sqm c. 64 sqm d. 72 sqm

c. 64 sqm (Asked twice)

AS per RA 9266, how many sets Of Plans and Technical Specifications should an Architect provide to the Owner for purposes of obtaining a Building Permit? a. 5 b. 6 c. 7 d. 8

c. 7

Based on NSO standards, by how much number of population should a place have before it is categorized as a barangay? a. 5,000 persons / 1152 families b. 6,000 persons / 1153 families c. 7,000 persons / 1157 families d. 8,000 persons / 1158 families

c. 7,000 persons / 1157 families

*SITUATION 12: Three siblings decided to form their own architectural firm. One is and Architect, another is an Engineer and the last is an Interior Designer.* 1. How much should the architectural composition of the corporation? a. 50% b. 60% c. 75% d. 80&

c. 75%

A group newly licensed architects and their friends wanted to put-up an Architectural Firm, how many % of the corporation should be owned by the architects. a. 50% b. 70% c. 75% d. 60%

c. 75%

Grab bar for disabled (height in mm) a. 600 b. 900 c. 800 d. 700

c. 800

*SITUATION 6* 4.How much is the Architect compensated after he completed all plans and documents for construction? a. 65% b. 75% c. 85% d. 80%

c. 85% (Correct Anser is *90%*; The remaining 10% is for: 5% -Liability and 5% - Periodic Construction Supervision )

Under BP 344. walks should have ___ turn/groove in order to guide the blind a. 45 degrees b. 60 degrees c. 90 degrees d.

c. 90 degrees

Any new construction which increases the height and/or floor area Of existing buildings/structures a. Remodeling b. Renovation c. Addition d. Alteration

c. Addition

What is between 2 lots and is intended only for pedestrians? a. Corridor b. Walkway c. Alley d.

c. Alley

As per Supplemental I.R.R. of R.A. 9266, Standards of Professional Practice, what is the basis of the preparation of Contract Documents wherein the Architect prepares the detailed designs, Construction Drawings and Technical Specifications in seven (7) sets? a. Approved Schematic and Conceptual Plans b. Architectural Program c. Approved Design Development Documents d. Feasibility Studies

c. Approved Design Development Documents

Who can best interpret Architectural Drawing a. Foreman b. Trade Professional c. Architect d. Draftsman

c. Architect

A registered and licensed architect who is directly and professionally responsible for the total design of the project for the client assumes the civil liability for plans, specifications and contract documents he/she has signed and sealed a.Principal Architect b. Managing Architect c. Architect-of-Record d. Project Architect

c. Architect-of-Record

Which of the following does not fall under Specialized Architectural Services? a. Acoustic Design Services b. Architectural Interiors c. Architectural Programming d. Architectural Light Layout

c. Architectural Programming (SPP 201 - Predesign Services)

What do you call the space in another building provided just after a horizontal exit on approximately the same level? a. Fire Lane b. Egress c. Area of refuge d. Safety Exit

c. Area of refuge

In the performance of his duties, when can a Building Official enter any building or its premises within his jurisdiction to inspect and determine compliance with the Building Code? a. Anytime b. When somebody reports an anomaly c. At all reasonable times d. Upon the invitation of the Owner

c. At all reasonable times

*SITUATION 18* 2. After the magazine was issued, another Architect Y noticed that some of his works were claimed by Architect X in the magazine articles. Architect X said that he only did it because he wanted his writer friend to get more advertisers. Is there something wrong with this? If there is, who is liable? a. Nothing since Architect X is willing to settle with Architect Y. b. Architect X is liable of fraud for claiming Architect Y's works. c. Both Architect X and Writer d. The Publisher for not checking the veracity of Architect X's claims

c. Both Architect X (for fraud) and Writer (for not checking his source)

It is a group creativity technique by which efforts are made to find a solution for a specific problems through the exchange of ideas spontaneously contributed by its participants. a. Discussion b. Meeting c. Brainstorming d. Group S.

c. Brainstorming ..*S*tudy

You just finished the design for your very first project- a museum. Where Will you go next? a. OBO b. Zoning c. Brgy d. NCCA

c. Brgy

What should be secured first before applying for a Business Permit? a Mayor's Permit b. DOLE Permit c. Brgy Permit d. DTl Permit

c. Brgy Permit

Which is NOT considered in a Master Development Plan? a. Site Development b. Urban Planning c. Building Height d.

c. Building Height

*SITUATION 6* 3. What can the Architect suggest to the owners to minimize spending? a. Negotiate and cut the cost of the project b. Provide a bare finish for the project so that the client will have time to improve his/her house in the future c. Buy house and lot instead d. NOTA

c. Buy house and lot instead

Who or what body is responsible for Zoning Exemption, Reclassification. or Change of Zone Ordinance? a. Mayor b. Governor c. City Council d. HLURB

c. City Council

*SITUATION 12* 4. If they are to apply for a business permit, where should they go? a. SEC b. DTI c. City Hall d. BIR

c. City Hall

Fires involving energized electrical equipment are called? a. Class A b. Class B c. Class C d. Class D

c. Class C

Electrical Fire should be suppressed by? a. Class A Fire Extinguisher b. Class B Fire Extinguisher c. Class C Fire Extinguisher d. Class D, Fire Extinguisher

c. Class C Fire Extinguisher

What among the following should the Architect's fee Not be based? a. Project Construction Cost b. Contractor's Fee c. Client's Profile Directory d.

c. Client's Profile Directory

How long is the validity of a Special/Temporary Permit given to Foreign Architects? a. One Year b. Two Years c. Co-terminus with the Project d Depends on the permit applied for

c. Co-terminus with the Project

A plan was drawn by a company Draftsman under the supervision of a Registered and Licensed Architect (R.L.A.). Who owns the document? a. Draftsman b. R.L.A. c. Company d. Client

c. Company

This method of selecting an Architect involves: Invitation, Prequalification, Interview, Verification, Evaluation & Ranking an Negotiation. a. Direct Selection b. Architectural Design Competition c. Comparative Selection d.

c. Comparative Selection

What is being planned by the HLURB a. Housing and Development b. Urban Land Use Map (ULUM) c. Comprehensive Land Use Plan (CLUP) d. CBD Plan

c. Comprehensive Land Use Plan (CLUP)

What plan is approved by HLURB after such is adopted by the Sangguniang Bayan/Panlungsod? a. Subdivision Plans b. Site Development Plan c. Comprehensive Land use Plan d.

c. Comprehensive Land use Plan (CLUP)

What service is performed by an Architect if activities such as physical, economical, social and infrastructure are accomplished? a. Contract Document Phase b. Construction Phase c. Comprehensive Planning Phase d. Design Development Phase

c. Comprehensive Planning Phase

Preliminary drawings done by Architect a. Preliminary Sketches b. Preliminary Diagrams c. Conceptual Drawing d. Working Drawing

c. Conceptual Drawing

*SITUATION 3* 8. After practicing for several years, you noticed that your license is about to expire on your birthday. Which is now a requirement for renewing your license? a. Affidavit of Loss b. 4 pcs. 2x2 picture c. C.P.D. units d. Community Tax Certificate

c. Continuing Professional Development (C.P.D.) units

Who prepares the Shop drawings? a. Owner b. Architect c. Contractor d. Trainee

c. Contractor

Under RA 9514, FALAR 2 is submitted by the Building Owner. Who prepares it? a. Architect b. Engineer c. Contractor and Construction Manager d. Building Owner

c. Contractor and Construction Manager

It is a Type of Business Organization wherein if the company fails and has to close operation, the individual shareholders are NOT liable for the company's debts. Each shareholder loses only the money he spent in buying his shares. a. Partnership b. Single proprietorship c. Corporation d. Limited Liability Company

c. Corporation NOTE: the Limited Liability Company (LLC) does NOT exist in the Philippines.

What do you call the raised edge at the sidewalk? a. Zocalo b. Gutter c. Curb d.

c. Curb

If an Architect wants to register a "single proprietorship" firm, where will he register? a. UAP b. PRC c. DTI d. SEC

c. DTI

At what stage does the provision for the Fire Code Requirement adopted? a. Schematic b. Project Definition c. Design Development d. Contract Document

c. Design Development

During what stage are the provisions of B.P. 344 adopted? a. Schematic b. Project Definition c. Design Development d. Contract Document

c. Design Development

During what stage are the provisions of National Building Code incorporated in the design? a. Schematic b. Project Definition c. Design Development d. Contract Document

c. Design Development

At what phase will the Architect prepare the Architectural layout for Electrical, Mechanical and Plumbing System? a.Project Definition Phase b. Schematic Design Phase c. Design Development Phase d. Contract Document Phase

c. Design Development Phase

For a Building Permit to be legitimate, it should be a. Duly Signed b. Duly Sealed c. Duly Notarized d.

c. Duly Notarized

Who is responsible for the Site Development Plan? a. Architect b. Civil Engineer c. Environmental Planner d. Landscape Architect

c. Environmental Planner a.Architect (Less responsibility)

How do you Specify Pipes? a. Inside diameter b. Outside Diameter c. Gauge

c. Gauge a. For measurement b. "Tube"

Who seeks permits and licenses? a. Owner b. Architect c. General Contractor d.

c. General Contractor

*SITUATION 8* 2. If Juan's boss could put up an architectural firm in the Philippines, what should be his forst move to register his business? a. Register his company at DTI b. Register his company at SEC c. Get license to practice architecture in the Philippines as a Foreign partner at PRC d. Get license to practice architecture in the Philippines as a Foreign partner at UAP

c. Get license to practice architecture in the Philippines as a Foreign partner at PRC

*SITUATION 3: You just passed the Licensure Examination for Architects and...* 1. What do you do next? a. Go back to your old job and make it better b. Look for a greener pasture c. Get ready for the Oath taking d. Put-up your own firm

c. Get ready for the Oath taking (SOON! AT P.I.C.C. COMPLEX 2019!) -Ar. Emil Marvin R. Suerte, uap

As a good start in your practice as an Architect, which of the following should you do first? a. Explain to your client the scope of your services b. Accept projects from relatives before sombody else get them c. Give a service agreement before any works is commenced d. Accept a job that your friend has been offered first. He won't mind, he's a friend.

c. Give a service agreement before any works is commenced

What is a successful Architect? a. High Profile b. Many projects due to low fees c. Good workmanship and ethical d. Rich

c. Good workmanship and ethical

If an Architect is hired as a Facilities Manager, how is he compensated? a. Lump Sum b. Salary c. Gross Rental % d.

c. Gross Rental %

Prior to construction, a building permit should first be obtained. What may the Building Official allow even while the Building Permit application is still being processed subject to the payment of corresponding fees? a. Bending/Cutting of Rebars b. Fabrication of Forms c. Ground Preparation and Excavation d. Delivery of Materials

c. Ground Preparation and Excavation *NOTE: Other activities allowed but not in choices are covered under ACCESSORY PERMITS* like: 1. Encroachment of Foundation to Public Area 2. Fencing, for Fence NOT exceeding 1180m high 3. Sidewalk Construction 4. Temporary Sidewalk Enclosure and Occupancy 5. Erection of Scaffolding 6. Erecting, Repair and Removal of Sign 7. Demolition *NOTE: The question is WHAT the Building Official ALLOW... you don't need permission for a, b and d.*

Which of the following is NOT a qualification Of a Building Official? a. Duly registered Architect or Civil Engineer b. A member of good standing of a duly accredited organization of his profession for not less than five years c. Has a master's degree in building design and construction d. A Filipino citizen and of good moral character

c. Has a master's degree in building design and construction Additional: e. Has at least five (5) years of diversified and professional experience in building design and construction. f. Has attended and successfully completed a seminar workshop on PD 1096 and its IRR conducted by the DPWH.

The Architect is engaged in a profession which carries civic responsibilities towards the public. As such, which of the following must the architect do? a. He Shall explain the conditional character of his estimates and in no case, shall he guarantee any estimates or cost of the work in order to secure a commission b. He shall reject any offer of aid, gift, commission or favors from any contractor/subcontractor nor shall he offer free professional services c. He shall respect and help conserve the system of values and the natural, historic and cultural heritage of the community in which he/she creates architecture. d. He shall not render professional services without a professional service agreement.

c. He shall respect and help conserve the system of values and the natural, historic and cultural heritage of the community in which he/she creates architecture.

Under PD 1096, the following belongs to Group E except a. Open Parking Garage b. Gasoline Station c. Ice Plant d. Police Station

c. Ice Plant - Group F (Industrial)

Which among the choices is a C.P.D. provider as shown in R.A. 9266? a. U.A.P. b. P.R.B.O.A. c. I.A.P.O.A. d. P.I.A.

c. Integrated and Accredited Professional Organization of Architects (I.A.P.O.A.)

*SITUATION 8* 3. The firm is now setup and ready to operate with several employees. In order to clearly define each worker's duties and responsibilities, you should provide workers: a. A copy of the Labor Code b. Management's Rules and Regulations c. Job Description d. Organizational Chart

c. Job Description

How is the Architect compensated in his capacity as a consultant? a. Per Diem b. Maximum of Direct Personnel Fee (M.D.P.E.) c. Like a Lawyer c. Project Construction Cost (P.C.C.)

c. Like a Lawyer

Who manages the Sewage water treatment plant? a. DOH b. DENR c. Local Government d. DPWH

c. Local Government

Government agency for "street dwellers" a. NHA b. HUDCC c. LGU d. DSWD

c. Local government units (LGU)

When was RA9266 approved and signed into law? a. September 15, 2004 b. January 29. 2004 c. March 17, 2004 d. July 28, 2004

c. March 17, 2004 (by PGMA)

When planning to start an Architectural Firm in a certain locality, what should you secure? a. SEC Permit b. DTI Permit c. Mayor's Permit d.

c. Mayor's Permit

It is a scaled or full-sized model used for demonstration and design evaluation purposes. A popular one-linear explains its importance... You can fix it now on the drafting board with an eraser or you can fix it later on the construction site with a sledge hummer a. Display b. Built-up c. Mockup d. Sketchup

c. Mockup

Which is not a part of Contract Document? a. Agreement b. Contract Drawings c. Model d.

c. Model

*SITUATION 6* 2. What will be the ideal method of compensation that the Architect should use if he is to find a new site project? a. Percentage of Construction Cost b. Per diem plus reimbursable expenses c. Multiple of Direct Personnel Expenses (M.D.P.E.) d. NOTA

c. Multiple of Direct Personnel Expenses (M.D.P.E.)

After passing the Sanggunian, who implements it a. NHA b. DPWH c. OBO d

c. OBO

Where do you secure a Building Permit? a. DPWH b. MWSS c. OBO d. DENR

c. OBO - Office Of The Building Official

A permit secured prior to the Occupancy of a Building a. Building Permit b. ECC c. Occupancy Permit d.

c. Occupancy Permit

A releasing device installed in Fire Exit Doors that causes the door latch to open the door in the direction of exit travel once a force of no more than seven kilograms is applied a. Self-Closing Device b. Fire Door Closer c. Panic Bar d. Auto-Release Lock

c. Panic Bar

When any 2 living units abut each other, a ___ shall be required. It shall be of masonry construction, at least 100mm and shall extend from the lowest portion Of the Wall adjoining the 2 living units up to the point just below the roof covering or purlins. a. Firewall b. Fireblock c. Partywall d. Curtain Wall

c. Partywall

If the Owner continuously makes changes, what method of compensation should the Architect employ? a. Cost Method b. Lump Sum c. Percentage of Construction Cost

c. Percentage of Construction Cost

Which is NOT a standard method of payment for Pre-Design Services? a. Multiple of Direct Personnel Expenses b. Professional fee plus Expenses c. Percentage of Project Construction Cost d. Lump sum or Fixed fee

c. Percentage of Project Construction Cost

An agency attached to the Department of Labor and Employment, the PRC is mandated to regulate and supervise the practice of the professionals. The PRC stands for? a. Peoples Republic of China b. Professional Regulatory Regulatory Commission c. Professional Regulation Commission d. Professional Regulations Commision

c. Professional Regulation Commission

What is meant by Fabricate and Delivered to Jobsite? a. Install b. Furnish c. Provide d.

c. Provide

Who is the R.L.P. (Registered and Licensed Professional) require to sign the Architectural drawing of the house? a. Project Manager b. Structural Engineer c. Registered and Licensed Architect d. Registered and Licensed Engineer

c. Registered and Licensed Architect

Who is the R.L.P. (Registered and Licensed Professional) require to sign the Specification documents of the house? a. Draftsman b. Structural Engineer c. Registered and Licensed Architect d. Registered and Licensed Engineer

c. Registered and Licensed Architect

Who is the R.L.P. (Registered and Licensed Professional) require to sign the Electrical Plans of the house? a. Master Electrician b. Electrician c. Registered and Licensed Electrical Engineer d. None of the above

c. Registered and Licensed Electrical Engineer *BE AWARE OF THE SEQUENCE AND CHOICES!*

The Architectural Plans must bear the Architect-of-Record's Signature, Seal and the following with the exception of: a. IAPOA Membership Number b. PRC Registration Number c. Residence Certificate Number d. PTR Number

c. Residence Certificate Number

Which section in R.A. 9266 refers to "Ownership of Plans, Specifications and other Contract Documents?" a. Sec. 13 b. Sec 23 c. Sec. 33 d. Sec. 43

c. Sec. 33

*SITUATION 1* 4. After laying off several of their workers, Architect Basha took on more workload and that includes Structural Conceptualization. How can she contribute under this? a. She can do Building Programming b. She can make structural design computations to help lessen Engr, Popoy's work load c. She can conceive and develop the type, disposition, arrangement and proportioning of the structural elements d. She can help in Value Engineering

c. She can conceive and develop the type, disposition, arrangement and proportioning of the structural elements

All debris arising from a demolition should be kept damp by means of spraying water from a hose with a fine spray to prevent dust from arising, Why? a. To keep the workplace clean b. For the health of the workers c. So adjoining bldg. owners/occupants and pedestrians are not inconvenienced d. To avoid lawsuits that will delay the work

c. So adjoining bldg. owners/occupants and pedestrians are not inconvenienced

Who keeps the record on site? a. Owner b. Architect c. Supervisors d. Contractor

c. Supervisors

The following are needed for the application of Building Permit except? a. TCT and/or Contract of Lease b. Five (5) sets of Signed & Sealed Plans c. Tax Declaration d. Intended use or occupancy

c. Tax Declaration

Where the sidewalk is permitted by the building official to be fully occupied and fenced-off or enclosed, what is required to be placed adjacent to the curb line? a. Safety Net b. Protective Railing c. Temporary Walkway d. Protective Canopy

c. Temporary Walkway

*SITUATION 7* 3. After passing the FLEA, who can administer his Professional Oath? a. Any Registered and Licensed Architect working abroad b. The Ambassador of the Philippine Embassy c. The PRBoA who will hold a Special Oathtaking Ceremony d. NOTA

c. The PRBoA who will hold a Special Oathtaking Ceremony

*SITUATION 4* 5. As a veteran architect with your own firm, why do you need a secretary? a. To prepare contract documents and keep track of various ongoing projects b. To secure clients meetings c. To keep office records in order d. To prepare documents

c. To keep office records in order

Which is NOT part of Pre-Design Services (S.P.P Doc. 201) a. Site Selection Analysis b. Site Utilization and Analysis c. Urban Planning d. Space Management Studies

c. Urban Planning - under S.P.P. Doc. 206: Comprehensive Architectural Services

Space left in a lot between the building and the property line a. Court b. Building Line c. Yard d Dispersal Area

c. Yard

What is the unit area per occupant Of a Conference Room (Occupant Load)? a. 1.00 sqm b. 1.20 sqm c. l.40 sqm d. 1.60 sqm

c. l.40 sqm

The Architect is engaged in a profession which carries with it civic responsibilities to the public. As such, he a. shall explain the conditional character of estimates and in no case shall he guarantee any estimates of the cost of the work in order to secure a commission. b. shall reject any offer of free professional engineering or allied design service/s, or receive any substantial aid, gift, commissions, or favors from any contractor or subcontractor. c. shall respect and help conserve the system of values and the natural, historic, and cultural heritage of the community in which he/she creates architecture. d. shall not render professional services without a professional service agreement

c. shall respect and help conserve the system of values and the natural, historic, and cultural heritage of the community in which he/she creates architecture.

Percentage fee if the Owner gets all Contract Documents a. 75% b. 85% c. 100% d 90%

d 90% Upon Service Agreement: 5% of PF = (*5%* Cumulative Amount) Upon completion of Service Agreement: 15% = (*20%* Cumulative Amount) Upon completion of Design Development Phase: 20% = (*40%* Cumulative Amount) Upon completion of Contract Document Phase: 40% = (*90%* Cumulative Amount) Bidding of Negotiation Phase: 90% = (*5%* Cumulative Amount) Upon Completion of Work: 10 % (*5% Civil Liability*; *5% Periodic Construction Supervision*)

Under the NBC, what is the least dimension for a T & B? a. 1.5 m b. 2.0 m c. 1.2 m d. 0.9 m

d. 0.9 m

Which is NOT a Doorknob height? a. 1.06 m b. 0.82 m c. 0.90 m d. 1.10 m

d. 1.10 m (From BP 344 0.86-1.06 m)

As per FCP what is the minimum width of a Corridor for Apartments with a required capacity of MORE than 50 persons? a. 0.91 m b. 1.00 m c. 1.10 m d. 1.12 m

d. 1.12 m

Considering PD 1096, what is the maximum Door Leaf width? a. 0.90 m b. 1.00 m c. 1.10 m d. 1.20 m

d. 1.20 m

What is the minimum clear width of a hallway/corridor under BP 344? a. 0.90 m b. 1.00 m c. 1.10 m d. 1.20 m

d. 1.20 m

The minimum size of a PWD toilet? a. l.50 x 1.70 b. 1.60 x 1.80 c. 1.60 x 1.70 d. 1.70 x 1.80

d. 1.70 x 1.80

A person illegally practicing architecture, shall upon conviction and upon the discretion of the court, be sentenced to suffer imprisonment for a period of six (6) months but not exceeding six (6) years OR pay a fine OR both. How much is the fine? a. 10.000 to 20,000 b. 100,000 to 500,000 c. 10,000 to 50,000 d. 100,000.00 to 5,000,000.00

d. 100,000.00 to 5,000,000.00

A building permit Shall expire and become null and void after how many days since work is suspended or stopped after it has commenced? a. 30 days b. 60 days c. 90 days d. 120 days

d. 120 days / 4 months

Under Section 24 of RA 9266, an Architect's revoked Certificate of Registration/ Professional Identification Card may be reinstated by the Board, upon application and for reasons deemed proper and sufficient, after a period of? a. 6 months b. 1 year c. 18 months d. 2 years

d. 2 years

What is the dimension for an average automobile parking slot for perpendicular parking? a. 2.15m x 6.00m b. 2.50m x 6.oom c. 2.15m x 5.00m d. 2.50m x 5.00m

d. 2.50m x 5.00m 2.15m x 6.00m - for parallel 3 x 9 - Jeep 3.6 x 12 - Truck 3.6 x 18 - Articulated

What is the standard size Of Working Drawings? a. A3 b. 30X40 c. 10 x 15 d. 20 x 30

d. 20 x 30

Under BP 344. Handrails attached to walls should have a minimum clearance from the wall measuring a. 20 mm b. 30 mm c. 40 mm d. 50 mm

d. 50 mm

Under BP 220, Minor Roads shall have a minimum Right-of-Way Of a. 5.00 m b. 5.50 m c. 6.00 m d. 6.50 m

d. 6.50 m

As per NBCP, Footing for Group A dwelling should be at least 250mm thick and how many millimeters below the surface of the ground? a. 300 b. 400 c. 500 d. 600

d. 600

AS per RA 9514, what is the maximum distance to exit Of a building if it is equipped with sprinklers? a. 45 m b. 46 m c. 60 m d. 61 m

d. 61 m

*SITUATION 17* 4. What is the A.M.B.F. percentage of the site? a. 60% b. 50% c. 75% d. 80%

d. 80% (AMBF is also PSO)

What is the unit area per occupant of an Office? a. 18.60 b. 20.00 c. 22.40 d. 9.30

d. 9.30

A Client hires an Architect to prepare the Plans and corresponding documents for his project. However, after the completion of all Plans and Documents, the Client changes his mind and decided not to implement the Plans for Construction. How much is the Architect compensated? a. 85% b. 60% c. 75% d. 90%

d. 90%

An Architect refuses to give the original plan to the Owner. Why? a. The owner entitled only to the blueprint b. The Architect's is covered by intellectual property rights/law c. In order to prevent the owner from making duplicates and/or constructing without his knowledge d. All of the above

d. All of the above

What general conditions of design are important for the aged? a. Size, location, design b. Height Of lavatory is from the waist c. Grab Bar d. All of the above

d. All of the above

Who is liable for aiding this unprofessional act? a. Allan b. Arch. Luna c. Owners d. All of them

d. All of them

A public way with a width of 2.0m intended to break a block and to serve both pedestrian and emergency vehicles, both ends connecting always to streets. It shall be used as an access to property. a. Pathwalk b. Street c. Sidewalk d. Alley

d. Alley

Works in building/structures involving changes in the materials used, partitioning, location/size of openings, structural parts. existing utilities and equipment but does not increase the building height and/or floor area. a. Remodeling b. Renovation c. Addition d. Alteration

d. Alteration

During the U.A.P. Presidency of Ar. Robert S. Sac, who was the P.R.B.O.A. chair? a. Ar. Yolanda D. Reyes b. Ar. Rolando L. Cordero c. Ar. Robert M. Mirafuente d. Ar. Dominador N. Alli

d. Ar. Dominador N. Alli

What do you can the plans, sections. elevations, perspective, specifications and other outputs of an architect? a. Architectural Working Drawings b. Contract Documents c. Architectural Plans d. Architectural Documents

d. Architectural Documents

How Often does the Architect-of-Record visit the jobsite? a. Once a week b. Twice a month c. Never d. As often as he/she wants

d. As often as he/she wants

What Architectural Service/Phase is the part where the Architect and Client are choosing the Contractor? a. Contract Document Phase b. Construction Phase c. Design Development Phase d. Bidding or Negotiation Phase

d. Bidding or Negotiation Phase

Who is responsible for carrying out the provisions of the Building Code in the field as well as the enforcement of orders and decisions made pursuant thereto? a. DPWH Secretary b. PRB0A c. Municipal Engineer/Architect d. Building Official

d. Building Official

Who prepares FALAR 3? a. Architect b. Engineer c. Contractor and Construction Manager d. Building Owner

d. Building Owner

Under R.A. 8293 prescribing the Intellectual property Code, under what chapter will you find the Architectural works are Original Works and area protected from the moment of their creation? a. Chapter I b. Chapter II c. Chapter III d. Chapter IV

d. Chapter IV - Practice of Architecture a. Chapter I - Title b. Chapter II - Description of Policy c. Chapter III - International Conventions and Reciprocity e. Chapter IV - Final Provisions

Who prepares Soil Investigation on site? a. Contractor b. Architect c. Geodetic Engineer d. Civil Engineer

d. Civil Engineer

Fires involving combustible materials such as sodium, magnesium, Potassium, and other similar materials are? a. Class A b. Class B c. Class C d. Class D

d. Class D

A magnesium fire could result in an explosion if the wrong extinguishing agent is used. What should be used to extinguish such a fire? a. Class A Fire Extinguisher b. Class B Fire Extinguisher c. Class C Fire Extinguisher d. Class D Fire Extinguisher

d. Class D Fire Extinguisher

Fires in cooking appliances that involve combustible cooking media (vegetable or animal oils and fats) are called? a. Class H b. Class I c. Class J d. Class K

d. Class K

A change in the use or occupancy of buildings/structures or any portion/s thereof a. Remodeling b. Renovation c. Demolition d. Conversion

d. Conversion

Identify the kind of lot in the figure at right a. Through tot, b. Corner Lot c. Inside Lot d. Corner through Lot

d. Corner through Lot

Which government agency will oppose conversion of agricultural land to commercial land? a. Local Planning Authority b. Local Government Unit c. HLURB d. DAR and DA

d. Department of Agrarian Reform (DAR) and Department of Agriculture (DA)

Who prepares the budget for government projects? a. Central Bank b. Socialized Housing c. Resettlement Program d. D.B.M.

d. Department of Budget and Management (D.B.M.)

Government agency liable for the lack of public transportation a. LTO b. DPWH c. LTFRB d. DOTC

d. Department of Transportation and Communications (DOTC)

What is ECC? a. Environmental Climate Change b. Energy Cost efficiency Certificate c. Environmental Certificate of Compliance d. Environmental Compliance Certificate

d. Environmental Compliance Certificate

It refers to the local Philippine architect, partnership or corporation that must work in association with a foreign architect, partnership or corporation, on a project on Philippine soil. a. Filipino Architect b. Registered and Licensed Architect c. Consulting Architect d. Filipino Counterpart

d. Filipino Counterpart

A building unsafe in case of fire because it will bum easily or because it lacks adequate exits or fire escapes. a. Fire Exit b. Fire Proof c. Fire Hazard d. Fire Trap

d. Fire Trap

What is prohibited for low density residential (R-1) uses or occupancies? a. 3.20m abutment for carport support b. 7.0m long abutment c. an abutment 50% of prop line d. Firewall

d. Firewall

Responsibilities of an Architect: when she/he conducts the checking of materials and works done if in adherence with the specification a. Job site management b. Project supervision c. Quantity surveying d. Full time supervision

d. Full time supervision

A group of Firefighters rendering firefighting activities in the premises of a public office. a. Fire Volunteers b. Community Fire Brigade c. Fire Brigade d. Government Fire Brigade

d. Government Fire Brigade

The Certificate of Registration and Professional Identification Card will be suspended or revoked if a Registered and Licensed Architect a. Signed and Affixed his name or seal on Architectural Plans and Designs, Specifications, or other similar documents prepared by his subordinates b. Paid money for the regular fees provided for to secure a Certificate of Registration c. Has practiced under a registered Corporate name d. Has openly solicited projects by actually undertaking architectural services without a valid service agreement.

d. Has openly solicited projects by actually undertaking architectural services without a valid service agreement. - *Suspend or Revoked* Has paid money for the regular fees provided for to secure a Certificate of Registration - *May refuse to issue a Certificate of Registration and Professional Identification Card to a person*

Under PD 957, open market and medium cost subdivision having 1500 lots is required to have the following except. a. Multi-Purpose Hall b. Convenience Stores c. Tricycle Terminal d. High School

d. High School

It is a Zone wherein only non-combustible material of no less than three to four-hour fire resistivity are allowed to be used as construction material throughout the structure. Only Type IV and V constructions are permitted in this area. a. Non-Fire Restricted Zone b. Moderate Fire Restrictive Zone c. Fire Restrictive Zone d. Highly Fire Restrictive Zone

d. Highly Fire Restrictive Zone

After securing your company's Articles of Incorporation and By-law, where should you register before starting to operate your business? a. Professional Regulatory Board of Architecture b. Professional Regulation Commission c. Department of Trade and industry d. Local Government

d. Local Government

*SITUATION 4* 6. How do you compensate a "project-hired" Painter? a. Per Hour b. Per Day c. Per Square meter d. Lump Sum

d. Lump Sum

*SITUATION 4* 7. How do you pay a Painting Subcontractor? a. Per Hour b. Per Day c. Per Square meter d. Lump Sum

d. Lump Sum

If the project's budget is constrained, what means should be used to achieve 3D understanding of the project? a. Animation b. Scale Model c. Perspective d. Manual Sketch

d. Manual Sketch

*SITUATION 11: An architect specified a particular material for a project that will be sourced from a foreign supplier. Everything is going as scheduled until the Contractor reports to the Client that he will not be able to finish the project as scheduled since the materials needed and to be supplied by the foreign supplier is still not at the jobsite and delivery has been apparently delayed. There is an upcoming event and the building will not be ready in time for the scheduled upcoming activity. It will have to be canceled and the Client is very unhappy due to the project huge financial loss.* 1. Whose fault is it? a. The architect for specifying a product that is not available in the local market. b. The Contractor for not informing the Client and Architect about the delay before it became critical c. The Event organizer for scheduling events before the building was finished d. Nobody's fault, it's something nobody wanted

d. Nobody's fault, it's something nobody wanted

In determining the amount of fines to be imposed, the following are considered grave except a. Non-compliance with work stoppage order for construction/demolition without permit b. Unauthorized change in type from more fire restrictive to less fire restrictive c. Use or occupancy of the building/structure without appropriate Certificate of Occupancy d. Non compliance with order to demolish

d. Non compliance with order to demolish

The Building Official may order or cause the non-issuance, suspension or revocation of Building Permits on any or all of the following grounds except a. Errors in the Plans and Specifications b. Incorrect Assessment of Fees c. Incorrect Data Supplied d. Non-compliance with the Code

d. Non-compliance with the Code

If for the sake of argument, there was no Contract between Allan's Aunt and Uncle and Architect Luna, How much are the Owner's liable for? a. Php 100,000 to Php 5,000,000 b. PhP 50,000 to PhP 500,000 c. Php 200,000 d. None

d. None

During construction, a Building Official found out that the building work is contrary to the provisions of the Building Code. What may he do? a. Warn the Contractor b. Order the Discontinuance of the Occupancy c. Consult with the Architect d. Order the Work Stopped

d. Order the Work Stopped

The _________ can order changes in the construction any time. a. Architect b. Construction Manager c. Project Manager d. Owner

d. Owner

Before demolition is commenced, a Notice of Intention to Proceed Shall be provided to: a. The Architect b. The Engineer c. The Contractor d. Owners of Adjoining Building's

d. Owners of Adjoining Building's

Which will you least or NOT consider in making a Comprehensive Development Plan? a. Social b. Economic C. Transportation d. Political/Institutional

d. Political/Institutional

*SITUATION 15: Arch. Casia was commissioned by his friend as the Architect for a Townhouse Project. He was specifically asked to prepare brochures for the marketing of the project.* 1. What type of service did Arch. Casia rendered for the project? a. Regular Design Services b. Pre-Design Services c. Construction Services d. Post Construction Services

d. Post Construction Services

If the Architect assists the Owner in planning Promotional Services for the project, who should the Owner hire to coordinate the overall activities concerning the project? a. Building Administrator b. Full Time Supervisor c. Construction Manager d. Project Manager

d. Project Manager

A bond furnished by the Bidder is a form of security that is submitted to the party soliciting the bid. It guarantees that the bidder will enter into a contract within a specific period of time and will furnish any required performance, labor and material bonds. It is typically referred to as a bid bond. a. Performance Bond b. Guarantee Bond c. Surety Bond d. Proposal Bond

d. Proposal Bond

Sidewalks widths shall be based on the following considerations except: a. Volume of pedestrians b. Width of Planting Strips c. Types/Volume of Street furniture d. Provisions for Sidewalk Vendors

d. Provisions for Sidewalk Vendors

What is the purpose of Bill of Materials? a. Bidding b. Loan c. Construction Guide d. Reference on Cost

d. Reference on Cost

Who is the professional responsible for the design of the overall appearance of the project proposal? a. Project Manager b. Project Engineer c. Owner d. Registered and Licensed Architect

d. Registered and Licensed Architect

Who is the R.L.P. (Registered and Licensed Professional) require to sign the Structural Plans of the house? a. Civil Engineer b. Architect c. Registered and Licensed Architect d. Registered and Licensed Civil Engineer

d. Registered and Licensed Civil Engineer

An Outline Specification enumerating the type or trade names of materials to be used and finishes is known as a. Estimates b. PERT-CPM c. Bill of Materials d. Schedule of Materials and Finishes

d. Schedule of Materials and Finishes

Which is NOT part of Pre-Design Services (S.P.P. Doc. 201)? a. Space Planning b. Space Management c. Architectural Research d. Schematic Design

d. Schematic Design - under SPP Doc. 202: Regular Design

Under R.A. 9266, an Architect duly registered with the Board shall automatically become a member of the Integrated and Accredited Professional Organization of Architects upon payment of the required fees and dues. In which Section of R.A. 9266 will you find this provision? a. Sec. 37 b. Sec. 38 c. Sec. 39 d. Sec. 40

d. Sec. 40

When you form a corporation, you go to the SEC. What does it stand for? a. Security of Exchange Commission b. Securities of Exchange Commission c. Secondary Exchange Commission d. Securities and Exchange Commission

d. Securities and Exchange Commission (S.E.C.)

Your informed by your client that he already bought the Water Fountain units without consulting you. upon inspecting the specs of the units, you found Out that their height is SLIGHTLY MORE than the maximum allowed by BP 344. Your client was very adamant that he will not return the unit's and insist that you use them. He also said that he will not buy another unit of smaller height. What is the solution to this dilemma? a. Eke out the slab to provide ample height for the Water Fountain units b. Stand your ground. Either he replaces them, or you resign c. Agree with the Owner and provide no solution. Nobody will inspect and it anyway d. Simply provide paper cups to make it accessible

d. Simply provide paper cups to make it accessible

The detailed analysis if the site that involves the identification of a site's development potentials through the proper utilization of land. It covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs. a. Feasibility Study b. Site Selection and Analysis c. Environmental Impact Study d. Site Utilization & Land-Use Study

d. Site Utilization & Land-Use Study a. *Feasibility Study* - project based on Pre-Feasibility w/c determines the viability of the project. b. *Site Selection and Analysis* - formulation of Site criteria, site evaluation, and analysis for the appropriate site for the project c. *Environmental Impact Study* - under S.P.P. Doc. 206: Comprehensive Architectural Services

A low budget presentation. a. Animation b. Scale Model c. Perspective d. Manual Sketch

d. Sketch

If the Owner asks you to be his representative for securing a Building Permit, what should you present to the OBO? a. Authorization Letter b. Letter of Delegation c. Endorsement Letter d. Special Power of Attorney

d. Special Power of Attorney

After initial meeting/conversation/correspondence with the Client, the Architect must now submit his proposal for Pre-Design services which does not include: a. Scope of Works b. Manner of Payment c. Owner's Responsibilities d. Total Cost

d. Total Cost

Allan, a 5th year student of Architecture was asked by his Aunt and Uncle to prepare Architectural Plans for their dream house. Both parties mutually agreed on their Contract stipulations as the Contract price. However, since Allan is still NOT licensed, he asked his professor, Arch. Luna to sign and seal his work, Arch. Luna obliges after checking that everything is compliant with existing codes. He asks and receives a Signing Fee. Is there something illegal in this situation? If yes, what is it? a. Yes. Estafa b. Yes. Violation of Intellectual Property Rights c. None. Because even,/body involved mutuaily agreed as evidenced by their contract d. Yes, Misdemeanor

d. Yes, Misdemeanor

*SITUATION 4* 4. A well-managed office is like a car that a. is running smoothly b. is spick and span c. has plenty of gas and oil d. is in good condition

d. is in good condition

Maximum height of Spire, if made of incombustible material, above the BHL? a. 6.0 m b. 7.0 m c. 6.50m d. limited only by Structural Design

d. limited only by Structural Design Incombustible - consisting or made of material that does not burn if exposed to fire.

If Allan is guilty, how much is he liable for? a. Php 100,000 to Php 5,000,000 b. PhP 50.000 to Php 500,000 c. PhP 200,000 d. none coz he's not guilty

d. none coz he's not guilty

How do you apply for a Zoning Exception? Reclassification

https://www.wikihow.com/Obtain-a-Zoning-Permit

Interior Design

— a practice concerned with anything that is found inside a space (walls, windows, doors, finishes, textures, light, furnishings and fumiture). All of these elements are used by interior designers to develop a functional, safe, and aesthetically pleasing space for a building's user. The work of an interior designer draws upon many disciplines including environmental psychology, architecture, product design, and traditional' decoration (aesthetics and cosmetics). They plan the spaces of almost every type of building including: hotels, corporate spaces. schools, hospitals, private residences, shopping malls, restaurants, theaters, and airport terminals. Today, interior designers must be attuned to architectural detailing including: floor plans, home renovations, and construction codes.

WHO ARE THE CLIENTS OF HGC?

• Home Guaranty Corporation (HGC) • The primary clients of the HGC are lenders (NOT borrowers). These include banks, government and private financial institutions, housing developers, and Building and Loan Associations (BLAs). These lending institutions must apply for a Guaranty Line from HGC in order for them to be covered.

In Order for a Foundation to be allowed to encroach into public sidewalk areas

▪*National roads or public highways*: footings located at least 2.40m below grade may project 300mm (maximum) beyond the property line ▪*Public sidewalk*: Foundations may encroach 500mm into the sidewalk if top of foundation is at least 600mm below grade


Ensembles d'études connexes

digestive system secretion study

View Set

Pre-AP World History Second Semester Study Guide 2022

View Set

Chapter 4 Physics review questions

View Set