Q02

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

Which protocol is used by a browser to get a web page from a server?

HTTP

Agile methods are based around incremental development and delivery. A. True B. False.

A. True

Extreme programming influenced the principles of AGILE development A. True B. False

A. True

In agile development we use TEST AUTOMATION and CONTINUOUS INTEGRATION A. True B. False

A. True

The PB is organized with the most important items to be implemented are on the top of the list. A. True B. False

A. True

User stories mainly focus on iteration through customer and user input A. True B. False

A. True

We want deliverables at regular intervals, around every 2 weeks A. True B. False

A. True

Which of these are all part of the code completeness checklist? A. reviewed, tested, accepted B. created, integrated, accepted C. reviewed, tested, maintained D. created, tested, accepted

A. reviewed, tested, accepted

Which of the following HTML tags should be used for hypertext links? A. <hypertext> B. <anchor> C. <link> D. None of the above

B. <anchor>

The HTML <head> tag is a structural element that determines where the page header should be displayed. A. True B. False

B. False

The HTML tags <bold> and <emphasis> have the same formatting outputs and can be used interchangeably. A. True B. False

B. False

The three W's of user stories is who, what, where A. True B. False

B. False

User requirements should answer questions of how to do something, not what A. True B. False

B. False

Which of these is NOT a practice of extreme programming? A. small releases B. Individual ownership C. simple design D. incremental planning

B. Individual ownership

To create a horizontal line we use the <hr> </hr> tags. A. true B. false

B. false

Which of these is NOT one of the three main benefits of timeboxed SPRINTS? A. demonstratable progress B. problem solving C. work planning D. problem discovery

B. problem solving

Extreme programming used which of these practices? A. code reviews and simplicity B. testing and design C. both A and B D. none of the above

C. both A and B

The advantages of pair programming are? A. learning from each other B. catching mistakes C. both A and B D. none of the above

C. both A and B

Which order do the project phases occur in? A. brainstorming, design, implementation, deployment, maintenance B. requirements, design, creation, deployment, maintenance C. requirements, design, implementation, deployment, maintenance D. none of the above

C. requirements, design, implementation, deployment, maintenance

SPRINTS typically last how long? A. 5 - 8 weeks B. 1 - 2 weeks C. 3 - 5 weeks D. 2 - 4 weeks

D. 2 - 4 weeks

which of these is NOT part of user stories? A. short statements B. requirements from a user's point of view C. mapping to a time box D. getting right up front

D. getting right up front

Which of these is NOT a PBI - Product Backlog Item ? A. improvements B. features C. activities D. none of the above

D. none of the above


Ensembles d'études connexes

Mathematics Methods and Instruction for Students with Mild/Moderate Exceptionalities - D237

View Set

Fundamentals of Success - Legal and Ethical Issues

View Set

Intermediate Accounting - Chapter 1 SB

View Set