Section Reviews

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

The deflection at the center of a joist spanning 22 feet must not exceed ____.

0.73"

The nail size to be used when constructing built-up girder is ___.

10d

For the builidng descred in Question 1, how many lineal feet of 2 X10s are needed to construct a built-up beam of three plies?

114 lineal feet

The distance betweent he end of a sill plate and the first anchor bold should be no greater than ___.

12"

If joists are to be cantilevered 4' beyond a foundation wall, the joists should be at least ____.

12' long

How many lineal feel of sill sealer are required for a building measuring 24' X 38' ?

124 lineal feet

For the building described in Question 3, how many subfloor panels are required?

25

For post-and-beam framing, vertical supports are typically spaced _____.

48" OC

For the building described in Question 3, how many pieces of metal cross-bridging are required if one row of bridging is required for each span?

60

For a 20' X40' building, how many 2 X 8 joists are required if they are spaced 16" OC and two rows of joists are required?

62

IN a 15' joist span, bridgin should be installed at ___.

7 1/2"

When checking the foundation for squarenes, if the measured lengths of the opposite walls are equal and the diagonal measurements are unequal, the foundation is square. {True or False}

False

When installing cross-bridging, nail the bottom of the bridging into place first, but do not nail the top into place until the subfloor is installed. {True or false}

False

Which of the following is a key characteristic of balloon framing?

Full-length studs that extend from the sole-plate to the rafter plate

Which of the following is shown on the structural plans for a commercial building?

Location, size, and spacing of anchor bolts

Which of the following is not shown on the foundation plans?

Room layout

which of the following is not a purpose for the subfloor?

TO support the sill plate

Specifications are a legally binding contract that provide written descriptions of the owrk to be performed and the materials to be used. {True or false}

True

When installing a subfloor, the panels should be positioned so the joints are staggered.

True

The platform frame construction, the ends of all the joists are fastened to the _____.

header joist

Steel columns filled the reinforced with concrete are called ___.

lally columns

Ducts, louvers, and registers are typically shown on the ___.

mechanical plans

Most residential and light commercial construction uses___

platform framing

The lowest members of a structure's frame are____.

sill plates

The distance between two outside walls is referred to as the ___.

span

When laying out joist locations, mark an X on the sill plate to indicate ____.

the actual joist position

General information about a drawing in a set of prints is located in the ___.

title block

Metal troughs that are embedded in the concrete floor and used s feeder ducts for electrical power and telecommunication lines are referred to as ____.

trench ducts

When installing joists, ensure the crown points ___.

up


Ensembles d'études connexes

OSU Biology 1113 Final Exam - Mackey

View Set

Taniguchi: Slife: Chap 2-5 Vocab

View Set

Chapter 6 Section Review Questions

View Set

Health Insurance - Chapter 6: Health Insurance Policy Provisions

View Set

External Anatomy of Livestock: Terms & Terminology

View Set

Chapter 17 & 18 Art History, A-H 106 Exam 1, AP Art History Set 3, Art Review Set 5, ARH 115-Chapter 16-Quiz 16, ARH 151 Quiz 17- The Renaissance, ARH 115-Chapter18-Quiz18, ARH 115-Chapter 19-Quiz 19, ARH 115-Chapters 20-Quiz 20, ARH 115-Chapters 21-...

View Set

Construction Management Exam 3 - CH. 9

View Set