Accounting Information Systems Ch. 21 Review
The second step in developing a prototype is:
Develop an initial prototype into a fully functional system
One way to compare system performance is to use _____.
a benchmark problem
A BPMS can improve the following internal control:
authorization, application controls, and segregation of duties
Which of the following is NOT a principle underlying business process reengineering (BPR)?
business processes should use prototype technology
Organizations can improve their _____ and reduce ________ by selling assets to an outsourcer.
cash position; expenses
CASE tools provide the following important advantage(s):
cost savings
A consequence of the application of CASE tools is reduced program quality.
false
Prototyping is the analysis and redesign of business processes and information systems to achieve significant performance improvements.
false
End user computing (EUC) involves many risks. Among these risks are:
inefficient systems and logic and development errors
What question(s) might be asked during a hardware evaluation?
is the vendor financially stable?
Which of the following is NOT a reason for issuing a request for proposal (RFP)?
it can help company avoid benchmarking their system
What is (are) a disadvantage(s) of developing custom software?
its is difficult and error-prone and it consumes a great deal of time and resources
What is (are) a benefit(s) of outsourcing?
less development time
Which of the following is NOT an advantage of prototyping?
more costly
The following is not an appropriate example of end user development:
process payroll
Which of the following are duties of the help desk?
providing hotline assistance to help resolve problems, evaluating new end-user hardware and software products, and assist with application development
Outsourcing the system has the following advantages:
reduced competitive advantage, loss of control, and inflexibility are not advantages gained
The systems development life cycle (SDLC) process includes which of the following:
systems analysis, conceptual systems design physical design, and operations and maintenance
Prototyping is best used when:
the system to be developed is needed quickly, users' reactions to the system are important development considerations, requirements are hard to define, inputs and outputs are not known, and tasks are unstructured
An advantage of EUC is _____ whereas _____ is a disadvantage.
timeliness; system incompatibility
A benefit of end-user computing is that it frees up systems resources.
true
Computer-aided software (or systems) engineering (CASE) tools are used to maintain an information system.
true
One advantage of outsourcing is more less development time because outside industry specialists can implement systems faster.
true
Which of the following is NOT an advantage of computer-aided software (or systems) engineering (CASE) tools?
unmet expectations
Which of the following is a way to compare system performance?
use of a benchmark problem, point scoring, and requirement costing