Activity 9-2
What scale is the first floor plan?
1/8" = 1'
What is the riser and tread information for the stairs to the mezzanine
20 risers/19 treads
What typical size are the metal studs to be for interior walls unless noted differently and what is the spacing to be used?
3 5/8" 20 guage / 16" OC
What is the overall size of the loading/shipping area?
48'10" x 29'2"
What is the slope of the rafter framing above the gate into the outside sales area?
6:12
What sheet is the roof plan on?
A2.1 or Del-8
Where are the compact fluorescent recessed can fixtures located?
Bathrooms and stairwells
What type of structure is above the checkout counters and what detail is referenced?
Cedar Trellis/ section one on page 6.1
What sheet are the supplemental notes on?
Del-4
What do the diagonal lines in the walls indicate?
Masonry walls 8" or 12"
Where are the stairs to the mezzanine located?
On the south east corner between the two rooms
What kind of glass is used in the counter room?
One way glass
Would that is in contact with concrete should be what type?
Pressure-treated
What type of roof is used above the covered entry?
Refinished IPS-SSP insulated standing seam roof
Which way is planned north facing to the right or left side of the drawings?
Right
Where is the roof access hatch located?
Storage room
What is the difference between the greenhouse salesfloor, and the outside salesfloor?
The outside sales has concrete curbs
What is to be done to the bar Joyce in the hardlines room?
They are to be painted
What is the cabinet contractor to do prior to construction?
Verify all dimensions and submit all drawings