The point of attachment of overhead premises wiring to a building shall be in no case less than___ ft above finished grade
the calculated load to be supplied
a building disconnecting means that supplies only limited loads of a single branch circuit shall have a rating of not less than
30 amps
for installations consisting of not more than two 2 wire branch circuits, the building disconnecting means shall have a rating of not less than
18 inches
if a set of 120/240 overhead feeder conductors terminates at a through the roof raceway or approved support with not more than 6 ft of these conductors, 4' horizontally, passing over the roof overhang, the minimum clearance above the roof for these conductors is not less than _______
access to the disconnecting means
in a multiple occupancy building, each occupant shall have access to his or her own________
10-8
open individual conductors shall be no smaller than_____AWG copper for spans up to 50'in length and_____AWG for a longer span, unless supported by a messenger wire
True
outside wiring shall not be installed beneath openings through which materials may be moved, and shall not be installed where they will obstruct entrance to these buildings' openings
between
overhead feeder and/or branch circuit conductors shall not be attached to a mast where the connection is_____a weatherhead or the end of the conduit and a coupling where the coupling is located above the last point of securement to the building or other structure, or where the coupling is located above the building or other structure.
6
overhead feeder conductors installed over roofs shall have a vertical clearance or not less than____above the roof surface unless otherwise permitted by an exception
12
overhead feeder conductors shall have a minimum of ____ft vertical clearance over residential property and driveways, as well as those commercial areas not subject to truck traffic, where voltage does not exceed 300 volts to ground
listed
raceways on exteriors of buildings or other structures shall be arranged to drain and shall be______for use in wet locations
opened or closed
the disconnecting means for a building supplied by a feeder shall plainly indicate whether it is in the_____position
24 1/2
the minimum clearance for overhead feeder conductors that pass over track rails of railroads is______ft
side of building below the roof
the requirement for maintaining a 3' vertical clearance from the edge of the roof shall not apply to the final feeder conductor span where the conductors are attached to_____
grouped in one location
the two to six disconnects for a disconnecting means for a building supplied by a feeder shall be_______
True
the type of disconnecting means specified in 225.31 shall be comprised of a circuit breaker, molded case switch, general use switch, snap switch, or other approved means.
10ft
the vertical clearance of final spans of overhead conductors above or within_____ft measured horizontally of platforms, projections,or surfaces that will permit personal contact shall be maintained in accordance with 225.18
building
underground raceways entering a _____from outside shall be sealed
overhead conductor spans
vegetation such as trees shall not be used for support of _____
power failure
when the disconnecting means for a building supplied by a feeder is a power operable switch or circuit breaker, it shall be able to be opened by hand in the event of a_______
True
where a mast is used for overhead branch circuit or feeder conductor support, it shall have adequate strength or be supported by braces or guys to safely withstand the strain imposed by the conductors