CH 9 and 10 Managerial

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

Commission expense is budgeted to be $16,000 at a planned sales level of 4,000 units. If only 2,900 units are sold, how much commission expense will appear on the flexible budget, and is the activity variance favorable or unfavorable?

11,600 and favorable

A performance report shows that the planning revenue was $240,000, the flexible budget revenue was $225,000, and actual revenue was $230,000. The activity variance is $

15,000 U

A company's cost of supplies for when 5,000 units are sold is $7,500 of fixed costs plus $1.25 variable cost per unit. What is the increase in the total cost of supplies if 350 more units are sold than expected?

437.50

Which of the following are used to calculate the standard quantity per unit of direct materials?

Allowance for waste and spoilage Direct materials requirements per unit of finished product

Variable Overhead Rate Variance

The difference between the actual variable overhead cost incurred during a period and the standard cost that should have been incurred based on the actual activity of the period.

When using a standard cost system, BLANK

an undue emphasis on labor efficiency variances can create pressure to build excess inventory. the information in the variance reports may be too old to be useful.

Given planning budget revenue of $284,000, actual revenue of $275,000, and flexible budget revenue of $290,000, there is a(n) activity variance.

favorable

Revenues and costs are adjusted as the level of activity changes on a(n) BLANK budget.

flexible

Nonprofit organizations BLANK

may have revenue sources that are fixed usually have significant funding sources other than sales

Variances are more accurate when using BLANK

multiple cost drivers

A cost center's performance report does not include BLANK

net operating income revenue

A budget that is prepared before the beginning of the period for a specific level of activity is called a BLANK budget.

planning

The variance analysis cycle begins with the BLANK

preparation of performance reports

The difference between the amount of an input used and the amount that should have been used, all evaluated at the standard price for the input, is called a(n) BLANK variance

quantity

The difference between the standard and the actual direct labor wages per hour is reflected in the labor BLANK variance.

rate

The difference between what the total sales should have been, given the actual level of activity for the period, and the actual total sales is a(n) BLANK variance.

revenue

The difference between how much a cost should have been, given the actual level of activity, and the actual amount of the cost is a(n) BLANK variance.

spending

The amount of direct-labor hours that should be used to produce one unit of finished goods is the hours per unit

standard

The labor efficiency variance is the difference between actual hours used and standard hours allowed multiplied by the BLANK hourly rate.

standard

When calculating the labor rate variance, multiply the actual hours worked times the labor rate and compare it to the actual hours worked times the labor rate

standard and actual

Material requirements plus an allowance for normal inefficiencies are added together to determine the per unit of output for direct materials.

standard quantity

SH

standard rate x units made

The variance analysis cycle begins with BLANK

the preparation of performance reports

The same basic formulas used for materials and labor are used to analyze BLANK portion of manufacturing overhead.

the variable

If the actual cost is greater than what the cost should have been, the variance is labeled as BLANK

unfavorable

SQ

units made x standard rate

The prominent difference between performance reports in nonprofit and for-profit organizations is that nonprofit organizations BLANK

usually receive significant funding from sources other than sales

The same basic formulas used for materials and labor are used to analyze the portion of manufacturing overhead.

variable

When preparing a flexible budget, the level of activity affects BLANK costs only

variable

When comparing the static planning budget to actual activity, a problem that arises when actual activity is higher than budgeted activity is that BLANK

net income is higher than expected but all or most expense variances are unfavorable

Options to generate a favorable revenue and spending variance include BLANK

protecting the selling price increase operating efficiency reduce the prices of inputs

Most companies compute the material price variance when materials are BLANK and the material quantity variance when materials are BLANK

purchased, used

an unchanged planning budget is known as a(n) BLANK planning budget.

static

Companies use the BLANK BLANK cycle to evaluate and improve performance

variance analysis

Fancy Nails' budgeted revenue is $20 per manicure. The planning budget for June was based on 2,400 manicures. During June, the actual revenue was $49,750 for 2,500 manicures. The revenue variance for June is Blank______.

$250 U

Labor Rate Variance

(AH*AR)-(AH*SR)

labor efficiency variance

(AH*SR)-(SH*SR)

Materials Price Variance

(AQ*AP)-(AQ*SP)

Materials Quantity Variance

(AQ*SP)-(SQ*SP)

One option to generate a favorable BLANK variance for net operating income is to increase the number of clients.

activity

The difference between a revenue or cost item in the planning budget and the same item in the flexible budget at the actual level of activity is a(n) BLANK

activity

The difference between a revenue or cost item in the planning budget and the same item in the flexible budget at the actual level of activity is a(n) BLANK variance

activity

The difference between a revenue or cost item in the planning budget and the same item in the flexible budget at the actual level of activity is a(n) BLANK variance.

activity

A flexible budget performance report combines the BLANK

activity variances with the revenue and spending variances

The spending variance is labeled as favorable when the BLANK

actual cost is less than what the cost should have been at the actual level of activity

A price variance is the difference between the BLANK

actual price and the standard price multiplied by the actual amount of the input

what are standards

benchmarks for measuring performance set for each major production input or task compared to the actual quantities and costs of inputs

A quantity variance is BLANK

calculated using the standard price of input

A revenue variance is the BLANK

difference between what revenue should have been at the actual level of activity and the actual revenue

Performance reports for cost centers BLANK

do not include revenues or net income

When actual revenue BLANK what the revenue should have been, the variance is labeled favorable

exceeds

The standard hours per unit includes both direct and indirect labor hours.

false

True or false: A static budget is being compared to actual activity. The variance is F for net income but U for most expenses. This suggests that actual activity was lower than budgeted.

false

Using multiple cost drivers on a flexible budget report will generally BLANK

increase accuracy

Standard costs are a key element in the by approach utilized by some companies.

management by exception

A cost center's performance report does not include BLANK

net operating income

A performance report shows that the planning revenue was $200,000, the flexible budget revenue was $225,000, and actual revenue was $223,000. Which of the following statements are true?

The activity variance is $25,000 Favorable. The revenue variance is $2,000 Unfavorable.

Variable Overhead Efficiency Variance

The difference between the actual level of activity (direct labor-hours, machine-hours, or some other base) and the standard activity allowed, multiplied by the variable part of the predetermined overhead rate.

The materials price variance is generally calculated at the time materials are purchased because BLANK

it allows materials to be carried in the inventory accounts at standard cost it simplifies bookkeeping management can generate more timely variance reports

SR(AH - SH) is the formula for the BLANK variance

labor efficiency


संबंधित स्टडी सेट्स

Chapter 7 Quiz: Secondary Storage

View Set

PRO Reading system, Analytical reading

View Set

100Qw/exp Management of Patients With Dysrhythmias and Conduction Problems:Brunner Ch26:

View Set

Unit 7 Production Budget Concepts

View Set

Chapter 1: Nurse's Role in Health Assessment: Collecting and Anazlyzing Data

View Set