chapter 16 omg 322

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

Manufacturing cycle time is best defined as the: A. time from raw materials receipt to finished product exit. B. length of the work​ shift, expressed in minutes per day. C. sum of all the task times to make one unit of a product. D. time between the start of one unit and the start of the next unit. E. time it takes a unit to move from one workstation to the next.

A

How can a reduction of​ in-transit inventory be​ encouraged? A. supplier location near plants B. low carrying costs C. high setup costs D. use of​ trains, not trucks E. ​low-cost, global suppliers

A. supplier location near plants

Which of the following is NOT a source of variability? A. Engineering drawings are inaccurate. B. Employees, machines, and suppliers produce units that conform to standards. C. Drawings or specifications are incomplete D. Customer demand is unknown E. Employees, machines, and suppliers produce units late.

B

Which of the following is specifically characterized by continuous and forces problem solving via a focus on throughput and reduced inventory? Toyota Production System​ (TPS) B. ​Just-in-time (JIT) C. kanban D. Lean operations E. Material requirements planning​ (MRP)

B

Characteristics of​ just-in-time partnerships do NOT​ include: A. produce with zero defects. B. large lot sizes to save on setup costs and to gain quantity discounts. C. removal of​ in-transit inventory. D. focus on core competencies. E. ​long-term contracts.

B. large lot sizes to save on setup costs and to gain quantity discounts

which of the following is generally found in most Lean environments? A. push systems B. a push system for high margin items and a pull system for low margin items C. pull systems D. a push system for purchased parts and a pull system for manufactured parts E. a push or pull​ system, depending upon the rate of demand

C

The list of​ 5Ss, although it looks like a housekeeping​ directive, supports lean production​ by: A. eliminating wasted motion through ergonomic​ studies, in the​ "support" category. B. reducing​ inventory, in the​ "standardize" category. C. identifying​ non-value items and removing​ them, in the​ "sort/segregate" category. D. building good safety​ practices, in the​ "shine/sweep" category. E. increasing variability through standardized​ procedures, in the​ "standardize" category.

C. identifying​ non-value items and removing​ them, in the​ "sort/segregate" category.

Which one of the following is a concern expressed by suppliers in JIT​ partnerships? A. ​customers' infrequent engineering changes B. delivery to the point of use C. having too many customers D. having limited ability to respond to changes in product and quality E. large lot sizes

D. having limited ability to respond to changes in product and quality

what does TPS stand for? A. Total Process Simplification B. Transparent Processing System C. Total Production Streamlining D. ​Taguchi's Production​ S's E. Toyota Production System

E

Who is credited with coining the​ phrase, "Inventory is​ evil"? A. Taiichi Ohno B. Poka Yoke C. Kanban Polka D. Pat​ "Keiretsu" Morita E. Shigeo Shingo

E. Shigeo Shingo

A kanban system requires that the process has little variability in lead time because shortages impact the entire production system. T/F

T

which of the following is NOT one of the Seven Wastes? A. defective product B. assignment C. overproduction D. transportation E. motion

assignment

Which of the following is specifically characterized by a focus on continuous important, respect for people, and standard work practices? A. kanban B. ​Just-in-time (JIT) C. Toyota Production System​ (TPS) D. Lean operations E. Material requirements planning​ (MRP)

c

a push system means providing the next station with exactly what is needed when it is needed.

false

Which of the following is specifically characterized by elimination of waste through a focus on exactly what the customer wants? A. Toyota Production System​ (TPS) B. kanban C. Material requirements planning​ (MRP) D. Lean operations E. ​Just-in-time (JIT)

lean operations

Variability in manufacturing can occur because engineering drawings or specifications are incomplete or inaccurate.

true

the 5Ss-sort/segregate . simplify/straighten, shine/sweep, standardize, and sustain/self discipline - are important to lean production because they act as a means to reduce waste.

true

waste is anything that does not add value from the consumer's perspective

true

Which one of the following is not benefit of JIT implementation? A. rework reduction B. variability increase C. quality improvement D. cost reduction E. rapid throughput

variability increase

If the goals of JIT partnerships are met, which of the following is a result? A. ​In-transit inventory falls as suppliers are located closer to facilities. B. ​In-plant inventory replaces​ in-transit inventory. C. For incoming​ goods, receiving activity and inspection are outsourced. D. Suppliers maintain a variety of customers to reduce risk. E. All of the above are consequences of meeting the JIT partnership goals.

​In-transit inventory falls as suppliers are located closer to facilities.


संबंधित स्टडी सेट्स

𝕗𝕦𝕔𝕜 omg another 𝕓𝕚𝕥𝕔𝕙 𝕒𝕤𝕤 history test💀💀💀

View Set