ISQS BURNs exam 1 HW

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

Project managers who do not understand the role that their project plays in accomplishing the organization's strategy tend to make all the following mistakes except ________.

-focusing on low priority problems -overemphasizing technology as an end in and of itself. -focusing on the immediate customer -trying to solve every customer issue -----All of these alternatives are likely mistakes.

In the urgency/importance matrix, which quadrant should we be living in?

Quadrant II

Which of the following is not a commonly heard comment of project managers?

Why is this project so strongly linked to the strategic plan?

Strategy, when considered to be under purview of senior management, is ________. a. old school thinking b. a new school of management thought c. necessary in a company structure d. beneficial to the Project Manager e. depended on company goals

a. old school thinking

The two major elements of the enterprise environment in which projects are implemented include ________ and ________. a. organizational structure | culture b. corporate governance | core competencies c. corporate governance | culture d. corporate primary processes | best practices e. corporate strategy | core competencies

a. organizational structure | culture

At the time, that the UDE symptoms of mainframe computers were encountered, two other technological developments were happening that made fixing these UDE symptoms possible. They were: a. Data communications and data storage was becoming very cheap. b. Desktop and notebook computers were becoming less expensive. c. Windows operating system and software applications were becoming more prevalent. d. Printers and peripherals were becoming less expensive.

a. Data communications and data storage was becoming very cheap.

Use the above scenario. What act would be chosen if the student is an inbetweenist with α = .5? (The in-betweenist criterion is calculated as the average of the row-max and row min columns). a. Do Project 1 b. Do Project 2 c. Do Project 3 d. Do Project 4 e. None of these alternatives is correct.

a. Do Project 1

Use the above scenario. What act would be the optimal choice if the student is a pessimist (the largest of the row minima) and does not know the probabilities of the states of nature? a. Do Project 1 b. Do Project 2 c. Do Project 3 d. Do Project 4 e. None of these alternatives is correct.

a. Do Project 1

Use the above scenario. What act would be the optimal choice if the student is a regrettist, again assuming uncertainty? (Find the Regret numbers in the Regret table and find the Row Max Regret for each alternative in the Regret table, for the Row Max column, pick the smallest. The Regret numbers are given by Regretij = Pj - Payoffij, and Pj is the column max; i is the row index for the four project choices and j is the column index for the three states.) a. Do Project 1 b. Do Project 2 c. Do Project 3 d. Do Project 4 e. None of these alternatives is correct.

a. Do Project 1

Use the above scenario. What act would be the optimal choice if the student is an optimist, (the largest of the row maxima) again assuming uncertainty? a. Do Project 1 b. Do Project 2 c. Do Project 3 d. Do Project 4 e. None of these alternatives is correct.

a. Do Project 1

When utilized, dedicated project teams operate in conjunction with which organizational structure? a. Functional organizational structure b. Balanced matrix organizational structure c. Projectized organizational structure d. Strong matrix organizational structure e. Weak matrix organizational structure

a. Functional organizational structure

The first step in the risk management process is ________. a. Identify the risks b. Assess the risks c. Develop responses to the identified risks d. Control the responses to the risks e. All of the alternatives are true.

a. Identify the risks

Which of the following is not an advantage of matrix organizational forms? a. Matrix organizational forms are fast, without stress. b. Matrix organizational forms have a strong project focus. c. Matrix organizational forms provide for easier post-project transition. d. Matrix organizational forms are flexible. e. Matrix organizational forms are efficient.

a. Matrix organizational forms are fast, without stress.

Which of the following would not be considered a threat? a. Meeting the project schedule b. Economic conditions c. Inflation d. International disruptions e. Competition

a. Meeting the project schedule

Most change requests fall within all but one of the following categories? a. Operations changes to widen the types of equipment the software will run on b. Scope changes coming from stakeholders, customers c. Implementation or contingency plans d. Improvement changes suggested by project team members e. None of these alternatives is correct.

a. Operations changes to widen the types of equipment the software will run on

n the multi-attribute table that follows, which project should be chosen? .15 .2 .15 .15 .15 .2 Alignment Benefit Economic Feasibility Technical Feasibility No Conflict User Acceptance Total Project 1 85 80 70 30 90 90 Project 2 80 78 90 75 80 75 Project 3 75 88 85 85 85 75 Project 4 80 55 41 65 75 50 a. Project 3 b. Project 4 c. Project 1 d. Project 2

a. Project 3

Which of the following is not part of the tradeoff triangle? a. Quality b. Scope c. Time d. Cost e. All of these alternatives are parts of the tradeoff triangle.

a. Quality

Which of the following is not a generally-recognized type of risk a. Quality risks b. Cost risks c. Schedule risks d. Technical risks e. Funding risks

a. Quality risks

Which of the following is not true of risk? a. Significant amounts of planning will overcome risks. b. Risk management attempts to recognize and manage potential and unforeseen trouble spots. c.Risks are uncertain events or conditions, which if they happen, has a positive or negative effect on the project. d. Risks create causes and consequences. e. Some potential risk events can be identified before the project starts.

a. Significant amounts of planning will overcome risks.

In which step is a RBS (Risk Breakdown Structure) created? a. Step 1 b. Step 2 c. Step 3 d. Step 4 e. Step 5

a. Step 1

What is the greatest enemy of the 'best' thing we could do with our lives? a. The many good things we can do b. Distractions c. Not having enough resources d. The many bad things we can do e. None of these alternatives is correct.

a. The many good things we can do

The Goldratt methodology addresses three questions. Which of the following is not one of those questions? a. Who will effect the change? b. How to cause the change? c. What to change? d. What to change to?

a. Who will effect the change?

The weaknesses of a projectized organization include all but ________. a. completion of projects is slow b. project costs tend to be expensive c. there is possible internal strife d. there is limited technological expertise e. None of these alternatives are weaknesses.

a. completion of projects is slow

In terms of managing one's calendar, it is important to ________. a. do planning and scheduling once a week b. put the unimportant activities on your calendar first c. do planning and scheduling once a month d. All of these alternatives are true. e. Only a. and b. are true.

a. do planning and scheduling once a week

When creating a WBS, we stop breaking the work down when we get to parcels of work that can be ________. a. done by a single person in one to four weeks b. the bottom of the page c. tasks or activities d. All of these alternatives are correct. e. Only a. and c. are correct.

a. done by a single person in one to four weeks

A(n) ________ is a risk event that can have a positive impact on project objectives. a. opportunity b. threat c. weakness d. milestone e. strength

a. opportunity

Construction firms and consulting firms, where most of the work is project work, the most appropriate organizational structure is ________. a. projectized organizational structure b. matrix organizational structure c. dedicated project teams d. functional organizational structure e. None of these alternatives is correct.

a. projectized organizational structure

The greatest enemy of the best things we could do with our time is ________. a. the good things we can do with our time b. the urgent things we do with our time c. those periods of time in which we relax, play video games and read our Facebook entries d. None of these alternatives is correct. e. the not urgent, unimportant things we can do with our time

a. the good things we can do with our time

When identifying risks, one common mistake made early in the process is ________. a. to focus on objectives and not on the events that could produce consequences b. to not consider all possibilities c. for participants to be overly-pessimistic d. to give too much attention to past events e. for participants to be overly-optimistic

a. to focus on objectives and not on the events that could produce consequences

Which of the following is not a stakeholder group? a. Competitors b. Fellow employees who oppose the project c. Customers d. Project team e. Project sponsor

a.Competitors

Which of the following choices is not one of the driving forces behind the increasing demand for project management? a. Development of third world and closed economies b. Increased customer focus c. Knowledge explosion d. The triple bottom line (planet, people, profit) e. Compression of the product life cycle

a.Development of third world and closed economies

Which of the following is not a project a. Manufacturing an iPhone b. Developing a spreadsheet template c. Writing a term paper d. Creating a PowerPoint presentation e. Setting up a sales kiosk for a meeting

a.Manufacturing an iPhone

In which of the following phases is it determined what the project effort will be, when the project will be scheduled, whom it will benefit, and what the budget will be? a. Planning b. Closing c.Monitoring and controlling d. Initiating e. Executing

a.Planning

Which of the following tasks/activities is not considered a project? a. Production of automobile tires b. Developing a new advertising program c. Developing a new software program d. Designing a space station e. Preparing the site for the Olympic Games

a.Production of automobile tires

Which of these is not part of the "sociocultural dimension" of project management according to Larson and Gray? a. Resource allocation b. Negotiation c. Customer expectations d. Leadership e. Politics

a.Resource allocation

Which of the following is the number one characteristic that is looked for in management candidates? a. Works well with others b. Experience c. Good references d. Past successes e. Overall intelligence

a.Works well with others

To determine what's best for us we need to ________. a. clarify our values b. ask a mentor c. write a vision statement d. establish goals e. None of these alternatives is true.

a.clarify our values

From 1994 to 2009 the phenomena of project lateness or of projects being over budget were ________. a. decreased somewhat (fewer projects were late or over budget) b. about the same c. significantly increased d. significantly, substantially decreased e. slightly increased (more projects were late or over budget)

a.decreased somewhat (fewer projects were late or over budget)

Which of the following was a root cause of the current reality tree? (Root causes appear at the bottom of the tree and do not have arrows directed toward them.) a. Mainframes were computational bottlenecks. b. Applications had to reside entirely within the mainframe. c. Customer and competitive environments were changing rapidly. d. Sales cannot see who among its clients are current on their payments.

b. Applications had to reside entirely within the mainframe.

What intermediate phenomenon appears to be particularly troublesome and has to do with lead time to perform change requests on existing apps? a. Mainframes were computational bottlenecks. b. Centralized MIS shops had lead times extending out to 36 months. c. Customer and competitive environments were changing rapidly. d. Applications had to reside entirely within the mainframe.

b. Centralized MIS shops had lead times extending out to 36 months.

Which of the following is not necessary to have trustworthiness? a. Character b. Confidence c. Competence d. Integrity e. All of these alternatives are not necessary to have trustworthiness

b. Confidence

According to PMBOK, which of the following is not one of the five phases that comprise the project lifecycle? a. Monitoring and Controlling b. Defining c. Planning d. Executing e. Closing

b. Defining

Which of the following is not true of project management structures? a. They appropriately balance the needs of both the parent organization and the project. b. In selecting a management structure, the culture of the organization is not a huge consideration. c. The project itself should be considered when determining which structure is best. d. They provide a framework for launching and implementing projects. e. They help determine who has most authority in regard to managing the project.

b. In selecting a management structure, the culture of the organization is not a huge consideration.

Which of the following organizational structure superimposes a project structure upon an existing organizational structure? a. Projectized organizational structure b. Matrix organizational structure c. Dedicated project teams d. Functional organizational structure e. None of these alternatives is correct.

b. Matrix organizational structure

In the multi-attribute table that follows, which project should be chosen? .15 .15 .15 .15 .15 .25 Alignment Benefit Economic Feasibility Technical Feasibility No Conflict User Acceptance Total Project 1 80 80 60 30 80 90 Project 2 65 78 90 75 80 75 Project 3 70 88 85 85 85 75 Project 4 85 78 95 89 85 95 a. Project 3 b. Project 4 c. Project 1 d. Project 2

b. Project 4

Which of the following is an undesirable effect emanating from the structure of the current reality tree? (Undesirable effects usually appear at or near the top of the current reality tree.) a. Customer and competitive environments were changing rapidly. b. Sales cannot see who among its clients are current on their payments. c. Mainframes were computational bottlenecks. d. Applications had to reside entirely within the mainframe.

b. Sales cannot see who among its clients are current on their payments

In which step is the likelihood (probability) and impact (severity) of the risk determined? a. Step 1 b. Step 2 c. Step 3 d. Step 4 e. Step 5

b. Step 2

Which of the following is not an advantage of a functional organizational structure? a. The level of flexibility is high. b. The level of focus is low. c. There is in-depth expertise. d. There is an easy post-project transition. e. There is no change to the organizational structure.

b. The level of focus is low.

Which of the following is not a disadvantage of a functional organizational structure? a. Progress is slow. b. There is in-depth expertise. c. There is poor integration. d. There is lack of ownership. e. There is lack of focus.

b. There is in-depth expertise.

In multi-attribute problems, what do the weights sum to? Why? a. They sum to 10 as to make the overall grade fall into the range 0 to 1. b. They sum to 1 so as to make the overall grade fall into the range 0 to 100. c. They sum to 1 so as to make the overall grade fall into the range 0 to 1. d. They sum to any number so as to make the overall grade maximized.

b. They sum to 1 so as to make the overall grade fall into the range 0 to 100.

Which of the following is not a negotiated issue when it comes to matrix organizational structures? a. Why will the task be done? b. What has to be done? c. Is the task satisfactorily completed? d. Who will do the task? e. Where will the task be done?

b. What has to be done?

Organizational structure issues get addressed ________. a. after the project leadership is determined b. after the corporate strategy has been determined c. after a project team has been assigned d.after project estimates are in place e. after the project is defined

b. after the corporate strategy has been determined

Delineation of a WBS should take place ________. a. after a network chart is created b. before a Gantt chart is composed c. concurrently with the Gantt chart d. All of these alternatives are correct. e. Only a. and c. are correct.

b. before a Gantt chart is composed

Empowerment is ________. a. encouragement b. delegation with detachment c. giving authority to do something d. governed by negotiations e. possible without alignment

b. delegation with detachment

Before you can apply the regret criterion, you have to do all of the following except ________. a. determine the payoffs b. determine state probabilities c. determine column maximums d.determine a regret number for each state/alternative pair e. All of these alternatives have to be done.

b. determine state probabilities

Covey suggests that we put the important stuff on our calendars ________. a. last and twice a week b. first and once a week c. last and once a week d. everyday e. first and twice a week

b. first and once a week

Once the decision to pursue a project has been made, then the next question is ________. a. who (what team members) will do the project b. how will the project be implemented c. what resources will be needed d. how much time and how much cost e. All of these alternatives are correct.

b. how will the project be implemented

Good project management structures balance the needs of both the ________ and ________. a. organizational structure | culture b. parent organization | the project c. corporate primary processes | best practices d. corporate strategy | core competencies e. corporate governance | culture

b. parent organization | the project

IT projects differ from construction projects in all of the following ways, except ________. a. with IT projects, requirements are less definitive b. with IT projects, there is more visibility c. with IT projects, there is more newness d. with IT projects, there is more risk e. with IT projects, the technology is changing more rapidly

b. with IT projects, there is more visibility

There are ten knowledge areas within PMBOK; which one is not one of the ten? a. Cost b. Budget c. Scope d. Time (schedule) e. Quality

b.Budget

Which of the following has to do with personal leadership? a. Doing everything b. Doing the right thing c. Doing nothing d. Doing the least harm e. Doing the thing right

b.Doing the right thing

In which lifecycle phase are schedules, budgets, risks, resources and staffing defined? a. Executing b. Planning c. Initiating d. Monitoring e. Closing

b.Planning

Corporate downsizing has increased the trend toward ________. a. shorter project lead times b. outsourcing significant segments of project work c. reducing the number of projects a company initiates d. longer project lead times e. using dedicated project teams

b.outsourcing significant segments of project work

A series of coordinated, related, multiple projects that continue over extended time intended to achieve a goal is known as a ________. a. campaign b. program c. venture d. crusade e. strategy

b.program

Covey is a strong proponent of once a ________ planning. a. day b. week c. year d. quarter e. month

b.week

Use the above scenario. What is the payoff of the optimal EV criterion? What is the optimal expected value? (In thousands of $.) a. 66 b. 55 c. 82 d. 47 e. None of these alternatives is correct.

c. 82

Which of the following was not one of the top three suggestions for how to be a star at work by Kelly? a. Aggressively self-manage your life and your career b. Network with peers and bosses c. Continually clarify your values and vision d. Take initiative e. All of these alternatives are not suggestions for how to be a star at work by Kelly.

c. Continually clarify your values and vision

Which of the following is not a criterion for decision making under uncertainty? a. Optimist criterion b. Regrettist criterion c. Expected value criterion d. In-betweenist criterion e. Pessimist criterion

c. Expected value criterion

Every application regardless of whether it is a mobile one or a web-based application has three components. Which of the following is not one of the three? a. Business-logic management b. Presentation management c. Interface/integration management d. Data management

c. Interface/integration management

In what phase of the project lifecycle should a project charter be drawn up? a. Phase 4 b. Phase 5 c. Phase 1 d. Phase 2 e. Phase 3

c. Phase 1

Which of the following is the strategy for mitigating risk? a. Reducing the awareness of the risk b. Reducing the likelihood of detection of the risk c. Reducing the probability and the impact of the risk d. Reducing the visibility of the risk e. Total elimination of the risk

c. Reducing the probability and the impact of the risk

Which of the following is not one of the steps in the risk management process (either Larson & Gray or PMBOK)? a. Risk assessment b. Risk response development c. Risk tracking d. Risk identification e. Risk response control

c. Risk tracking

Which of the following is one of Covey's seven habits? a. Personal mastery b. Team learning c. Sharpen the saw d. Shared vision e. Mental models

c. Sharpen the saw

Which of the following is not a tool we use to identify risks? a. Brainstorming b. SWOT Technique c. Simulation d. Delphi technique e. Interviewing

c. Simulation

Which risk response step develops a strategy for reducing possible damage and develops a contingency plan? a. Step 1 b. Step 2 c. Step 3 d. Step 4 e. Step 5

c. Step 3

Which of the following is not true of dedicated project teams? a. The team is usually located offsite. b. A full-time project manager is designated to manage the team. c.Team members have other, outside responsibilities. d. The team is physical separated from the parent organization. e. Team members are usually selected by the project manager.

c. Team members have other, outside responsibilities.

Which of the following is not one of Covey's seven habits? a. Put first things first b. Synergize c. Think win/lose d. Begin with the end in mind e. Be proactive

c. Think win/lose

The risk graph (Larson & Gray, Figure 7.1) informs us of all of the following but ________. a. the chances of risks occurring decrease over the lifetime of the project b. initially, the chances of a risk occurring within a project are high c. at the delivering phase the cost to fix a risk event is low d. the cost to fix a risk event goes up over the lifetime of a project e. All of the alternatives are true.

c. at the delivering phase the cost to fix a risk event is low

A WBS is created from scratch by ________. a. users exclusively b. defining phase exits c. decomposition of the work d. choosing siblings of legitimate parents e. identifying milestones

c. decomposition of the work

A critical factor to ensure the success of integrating the strategic plan with projects lies in a process that ________. a. starts with top management's directives b. with projects first and integrates them with the strategic plan c. is open and published for all participants to review d. Both b. and c. are correct. e. All of these alternatives are correct.

c. is open and published for all participants to review

Within PMBOK, almost every knowledge area begins with a ________ process and ends with a ________ process. a. identifying | controlling b. planning | closing c. planning | controlling d. identifying | closing e. mediating | delivering

c. planning | controlling

A WBS delineates ________. a. cost b. schedule c. scope d. All of these alternatives are correct. e. Only a. and b. are correct.

c. scope

Some ways to generate lists of possible risks include all but ________. a. RBS b. problem identification c. simulation d. risk profiling e. brainstorming

c. simulation

In a matrix organizational structure, every team member has ________. a. confusion as to which project to work on b. two or more projects to work on c.two reporting authorities—two chains of command d. two desks e. someone who can substitute for him or her

c. two reporting authorities—two chains of command

Which of the following is not a project characteristic? a. Accomplished in teams b. Has a definite stopping time c. Creates resources d. Has a definite starting time e. Has an objective or goal

c.Creates resources

What is the name of the software tool that delineates a timeline chart showing all of the activities and their start and stop dates? a. Work breakdown structure chart b. Network chart c. Gantt chart d. Control chart e. Flowchart

c.Gantt chart

In which off the following lifecycle phases is a project charter created? a. Monitoring b. Planning c. Initiating d. Closing e. Executing

c.Initiating

Which of these is not part of the "technical dimension" of project management? a. Schedules b. Status reports c. Problem solving d. WBS e. Budgets

c.Problem solving

Empowerment is ________. a. encouragement b. possible without alignment c. delegation with detachment d. governed by negotiations e. giving authority to do something

c.delegation with detachment

If the expected payoff of perfect information is $100,000 and the expected return without additional information is $40,000, the expected value of perfect information is ________. a. $40,000 b. $30,000 c. $50,000 d. $60,000 e. $80,000

d. $60,000

Good goal statements should ________. a. have a target date b. be measurable c. begin with the infinitive to d. All of these alternatives are correct. e. Only a. and b. are correct.

d. All of these alternatives are correct.

Alignment is necessary because ________. a. while we are working on our firms' goals we must also be working on our goals b. our goals must align with our personal vision statement c. without alignment, empowerment leads to chaos, anarchy d. All of these alternatives are true. e. All of these alternatives are false.

d. All of these alternatives are true

Goal setting is important because ________. a. it sets a direction for our lives b. it causes us to focus on the future c. it programs our success mechanism d. All of these alternatives are true. e. Only a. and c. are true.

d. All of these alternatives are true.

To establish vision and mission statements, we need to ________. a. determine what is needed within our domain of influence b. determine our values c. determine what we really enjoy doing d. All of these alternatives are true. e. Only a. and b. are true.

d. All of these alternatives are true.

Giving consideration to the discussion about Burns, Figures 5.3a, 5.3b, and 5.6, what is the focal point and ultimate answer to the question 'What to change?' a. Centralized MIS shops had lead times extending out to 36 months. b. Customer and competitive environments were changing rapidly. c. Mainframes were computational bottlenecks. d. Applications had to reside entirely within the mainframe.

d. Applications had to reside entirely within the mainframe.

ccording to Burns, Figure 5.1, which of the following is not part of feasibility assessment? a. Test resource availability b. Identify dependencies with other projects c. Test alignment with and impact on corporate strategy d. Assemble team

d. Assemble team

Which of the following is a main reason why project managers need to understand their organization's mission and strategy? a. They can better focus on the immediate customer. b. They can make appropriate decisions and adjustments. c. They can be effective project advocates. d. Both b. and c. are correct. e. All of these alternatives are correct.

d. Both b. and c. are correct.

Which of the following is not a stakeholder in most projects? a. Line managers b. Users c. Upper-level management d. Competitors e. Customers

d. Competitors

Which of the following is not a tool we use to perform qualitative risk analysis? a. Probability/impact matrices b. Top-ten risk item tracking c. Expert judgement d. Decision Trees/simulation e. All of the alternatives are tools used for qualitative risk analysis.

d. Decision Trees/simulation

SCENARIO: A portfolio manager must decide among four different projects. He has funds sufficient only to do one of the projects. This decision must be made in the context of a risky future involving three possible states of the economy: economy remains strong, moderate, and recession. The manager estimates these states at .4, .5, and .1 respectively. Assuming a five-year horizon, the manager has determined that the following payoff table applies (NUMBERS ARE IN THOUSANDS OF $): Economy Row Min Row Max In-Betweenist In-sufficient Expected Value Payoff Table Strong Moderate Recession a. Do Project 1 50 60 100 b. Do Project 2 90 70 30 c. Do Project 3 80 40 50 d. Do Project 4 80 90 50 Probability 0.4 0.5 0.1 row sum Column Max 90 90 100 Regret Table Row Max Expected Regret a. Do Project 1 40 30 0 b. Do Project 2 0 20 70 c. Do Project 3 10 50 50 d. Do Project 4 10 0 50 Use the above scenario. What act would be the optimal choice under the principle of insufficient reason (all states considered equally likely—the largest of the row sums)? a. Do Project 1 b. Do Project 2 c. Do Project 3 d. Do Project 4 e. None of these alternatives is correct.

d. Do Project 4

Use the above scenario. What would be the optimal choice under EV, expected value or return? (The sum of the products involving the state probabilities and the payoffs associated with any given decision alternative.) a. Do Project 1 b. Do Project 2 c. Do Project 3 d. Do Project 4 e. None of these alternatives is correct.

d. Do Project 4

Key questions organizations must ask in conjunction with which organizational structure include all but ________. a. What resources are available? b. What percentage of core work involves projects? c. How important is the project? d. How much will the project cost and how will it take? e. Will projects be outsourced?

d. How much will the project cost and how will it take?

What is the number one cause of failed projects? a. Lack of cohesion, consensus b. Changing requirements c. Poor planning d. Lack of user involvement e. Incomplete requirements

d. Lack of user involvement

Which of the following statements is not true about risk management? a. Risk management improves chances of reaching project performance objectives. b. Risk management reduces surprises and negative consequences. c. Risk management provides better control over the future. d. Risk management is a reactive rather than a proactive approach. e. Risk management prepares a project manager to take advantage of risks.

d. Risk management is a reactive rather than a proactive approach.

After we have created a list of things to get done in the next week, we should ________. a. put the important stuff on our calendar last b. scrub the unimportant stuff from the list c. put the important stuff on our calendar first d. check the list for completeness e. prioritize the list from most to least important

d. check the list for completeness

For most organizations, the existing organizational structure is a ________. a. projectized organizational structure b. matrix organizational structure c. dedicated project teams d. functional organizational structure e. None of these alternatives is correct.

d. functional organizational structure

The expected value and expected regret criteria always ________. a. tell you what the expected payoff of perfect information is b. tell you what the expected payoff of sample information is c. produce the same number or value d. select the same alternative e. tell you what the expected benefits of using either is

d. select the same alternative

Boxes on the bottom-most level of the WBS are called ________ and should be ________ in duration. a. roots | 4-6 weeks b. products | 1-2 months c. leaves | 1-5 days d. work packages | 1-4 weeks e. deliverables | 1-2 weeks

d. work packages | 1-4 weeks

Projects with vague visions, objectives are ________. a. likely to fail b. more common than many project managers like to admit c. examples of reactive project management d. All of these alternatives are correct. e. Only a. and c. are correct.

d.All of these alternatives are correct.

In which of the following phases is a major portion of the physical and mental project work performed? a. Delivering b. Initiating c. Monitoring and Controlling d. Executing e. Planning

d.Executing

From the list below which chart shows the sequence in which activities must be performed? a. Work breakdown structure chart b. Gantt chart c. Burndown chart d.Network chart e. Timeline chart

d.Network chart

According to Thomas Friedman, how often does project management get offshored a. Always b. Rarely c. Sometimes d. Never e. Frequently

d.Never

Integration of all project processes and practices to improve Project Management is due to ________. a. the organization's environment and culture b. project management system c. customer expectations d. centralization e. environmental analysis

d.centralization

In Larson and Gray, the two dimensions within project management are ________ and ________. a. planned | unexpected b. cost | time c. established | new d. technical | sociocultural e. unique | reoccurring

d.technical | sociocultural

Which of the following is not a major issue that risk management endeavors to address? a. What can go wrong b. How to minimize the risk event's impact (consequences) c. What can be done before a risk event occurs (anticipation) d. What to do when the risk event occurs (contingency plans) e. All of the alternatives are major issues.

e. All of the alternatives are major issues.

If you are getting into project management for the first time, you should pick a project that is ________. a. small b. short in duration c. limited in scope d. involves a half-dozen or fewer people e. All of these alternatives are correct

e. All of these alternatives are correct

The importance and significance of project management has increased due to ________. a. the movement of manufacturing operations out of the U.S. b. time to market c. the movement toward flatter and leaner organizations d. Both a. and b. are correct. e. All of these alternatives are correct.

e. All of these alternatives are correct.

The intended outcome of strategy/projects integration is ________. a. clear organization focus b. best use of scare organization resources c. improved communication across projects and departments d. Both a. and b. are correct. e. All of these alternatives are correct.

e. All of these alternatives are correct.

Which of the following would not serve the interests of a high priority project in which the firm wants completed as quickly as possible? a. The project lacks a compelling vision. b. Team members must multitask. c. The project manager is managing several projects concurrently. d. There is confusion as to how the project fits with the overall strategy of the firm. e. All of these alternatives are impediments to a quick completion of a high priority project.

e. All of these alternatives are impediments to a quick completion of a high priority project.

Which of the following is not typically the responsibility of a project manager? a. Meeting budget requirements b. Meeting schedule requirements c. Meeting performance specifications d. Coordinates the actions of the team members e. All of these alternatives are typical responsibilities.

e. All of these alternatives are typical responsibilities.

An activity is a(n) ________. a. task b. step c. event d. All of these alternatives are correct. e. Both a. and b. are correct.

e. Both a. and b. are correct.

In the pessimist criterion we pick ________. a. the worst case scenario within each alternative b. the best case scenario within each alternative c. the best of the worst case scenarios d. the worst of the best case scenarios e. Both a. and c. are correct.

e. Both a. and c. are correct.

Organizations have difficulty in creating a system for managing projects because ________. a. contrary to typical operations, projects are one-time efforts b. projects are not focused on profits c. projects are multidisciplinary while organizations are usually departmentalized by discipline d. Both a. and b. are correct. e. Both a. and c. are correct.

e. Both a. and c. are correct.

In the optimist criterion, we pick ________. a. the worst case scenario within each alternative b. the best case scenario within each alternative c. the best of the best case scenarios d. the worst of the best case scenarios e. Both b. and c. are correct.

e. Both b. and c. are correct.

For projects that have been completed many times before, it is helpful to start the development of the WBS with ________. a. decomposition b. a clean sheet of paper c. a WBS template for the project type d. old WBSs taken from past similar projects e. Both c. and d. are correct.

e. Both c. and d. are correct.

________ and ________ are frequently used to cover project risks—identified and unknown. The former is used to lesson budget risk, while the latter is used to diminish schedule risk. a. Testing | time buffers b. Contingency funding | walkthroughs c. Prototyping | walkthroughs d. Walkthroughs | testing e. Contingency funding | time buffers

e. Contingency funding | time buffers

Which of the following is not one of the sections of the project charter? a. Discussion of problem or opportunity b. Success criteria c. Purpose or goal of a project d. Assumptions/risks/obstacles e. Detailed list of tasks that make up the project

e. Detailed list of tasks that make up the project

Which of the following is not an advantage of a dedicated project team? a. The existing organizational structure remains intact. b. Progress on the project is fast because team members devote their entire time to the project. c. The cost of the dedicated project team will be expensive. d. There will likely be internal strife between the team members and the rest of the organization. e. Neither c. nor d. are advantages.

e. Neither c. nor d. are advantages.

Projects create ________. a. products b. services c. results d. All of the alternatives are correct e. Only a. and b. are correct

e. Only a. and b. are correct

An item with a WBS code of 2.1.3.4 ________. a. is on the third level b. has an immediate parent with a code of 2.1.3 c. is one of at least four siblings d. All of these alternatives are correct. e. Only b. and c. are correct.

e. Only b. and c. are correct.

A simple explanation of organizational culture is that it reflects the ________ of an organization. a. hierarchy b. management style c. background d. reporting relationships e. personality

e. personality

Which of the following is not a phase in any project lifecycle? a. Initiating b. Planning c. Executing d. Closing e. All of these alternatives are phases of the project lifecycle.

e.All of these alternatives are phases of the project lifecycle

Which of the following is not part of the Covey strategy for personal planning? a. None of these alternatives is part of the Covey strategy for personal planning. b. Continually clarify what is important to you c. All of these alternatives are parts of the Covey strategy for personal planning. d. Once a week create a prioritized to do list e. Determine your true south direction

e.Determine your true south direction

What's more important? a. Doing the least harm b. Doing everything c. Doing nothing d. Doing the right thing e. Doing the thing right

e.Doing the right thing

A professional organization for project management specialists is the ________. a. MBA b. MIS c. PMBOK d. IPM e. PMI

e.PMI

If your project starts with existing code, rather than from scratch, then your project is considered to be a ________. a. agile or adaptive project b. development project c. predictive project d. integration project e. maintenance project

e.maintenance project

Projects are ________ endeavors. a. perpetual b. substantial c. repetitive d. enduring e. temporary

e.temporary


संबंधित स्टडी सेट्स

History of Television: Window to the World

View Set

Block 10 Module 9 Iggy Questions: ED/Trauma/Burns

View Set