Michigan Builders License - All questions for the 60 Course

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

The Department shall charge a _________ late fee for failing to renew a license on time. $10.00 $20.00 $30.00 $60.00

$20.00

The Home Solicitation Sales Act 227 requires a written contract if the dollar amount is more than _______. $25.00 $100.00 $500.00 $600.00

$25.00

John Doe earned $560.00 on his last paycheck. At 6.2% for social security, what was the deduction for social security tax? $3.47 $6.20 $34.20 $34.72

$34.72 Here is the solution for the problem:$560.00 X .062 = $34.72

A builder who is working under a contract which is _________ must be licensed. $300.00 $400.00 or less $500.00 or more $600.00 or more

$600.00 or more

Combining money from several jobs to finish an existing job is an example of Money transfer Fraud Censure Commingling

Commingling

Best describes the temperature at which the air is completely saturated with moisture. Fog Condensation Vapor point Frost point

Condensation

Board of Appeals means Planning Board of Appeals Zoning Board of Appeals Construction Board of Appeals Residential & Maintenance Alteration Board

Construction Board of Appeals

Who shall provide, install, and maintain signals, signs, barricades, and tags, where an employee might be, or would likely be, injured if not alerted to the hazard? · Utility Company · Miss Dig. · Contractor · Homeowner

Contractor

Used to divert storm water around a chimney greater than 30 inches wide when the chimney is located at the eave or mid span of the roof. Gutter Flashing Storm stop Cricket/saddle

Cricket/saddle

What word best describes sheet metal used to protect the house from water leakage? Drip edge. Ice and water shield. Flashing. Vapor guard.

Flashing.

What is the best tool to use for removing a broken asphalt strip shingle? Flat pry bar. Shingle remover. Roofing knife. Flat shovel.

Flat pry bar.

What is prepared by the Department or Department of the Attorney General which discloses evidence of a violation of Act 299? Formal Complaint Subpoena Fine Trial

Formal Complaint

Used to protect workmen from electrical shock with tools and extension cords. G.F.I. Rubber gloves and boots Grounded plugs Grounding rod

G.F.I.

In order to comply with MIOSHA, all power cords must be · Grounded · G.F.I. protected · On a separate circuit Yellow in color

G.F.I. protected

Costs related to the business of being a builder such as office rent, office staff, and insurances are best described as Down costs Indirect costs Direct costs Related costs

Indirect costs

Which type of exposure to asbestos fibers is considered the most hazardous to your health? Prolonged exposure to your eyes. Allowing asbestos fibers to enter your blood. External skin contact with asbestos fibers. Inhaling into the lungs.

Inhaling into the lungs.

The Board's duties include Making laws Interpretation of licensure requirements Regulation of building codes All of the above

Interpretation of licensure requirements

A builder is required to give his employees a W-2 form no later than January 31 April 15 June 06 December 31

January 31

A 1099 form must be given to subcontractors by what date? January 1st January 31st February 28th March 31st

January 31st

What is the top stone of an archway called? Lintel Key Stone Master Stone Crown Stone

Key Stone

In reference to the occupational code, the word "Department" refers to: Licensing & regulatory Affairs (LARA) Department of Education Department of Records Department of Construction Codes

Licensing & regulatory Affairs (LARA)

A requirement that all contracts of a licensee be reviewed by an attorney is an example of a Censure Complaint Limitation Probation

Limitation

Select the best term for the following definition. What is used to carry the weight of masonry units over a door or window? Lintel. Header. Corner stone. Bridge.

Lintel

Best describes loads produced by the use and occupancy of a building. Live load Dead load Occupancy load PSI load

Live load

Which type of mortar would be used for masonry subjected to high compressive loads, severe frost action, high lateral loads and structure below grade? M N O S

M

Which type of drywall would be required above a bath tub? Fire coded D.W. Regular 1/2" D.W. M.R. D.W. Wet plaster

M.R. D.W.

The Residential Builders license expires every 3 years on January 01 May 31 June 01 December 31

May 31

From the choices below, select what is used to attach brick veneer to wood framing. Veneer clips. Metal ties. Construction adhesive. Mortar nails.

Metal ties.

A builder may use funds from one project for another project Anytime the builder chooses If the amount of money is less than $10,000 If the amount of money is less than $50,000 Never

Never

A builder is installing replacement windows that do NOT contain safety glazing. If the bottom edge is less than 10 inches above the floor, what is the maximum permissible size of a single pain in these replacement windows according to code limits? 6 square feet. 9 square feet. 12 square feet. Not Premitted

Not Premitted

A "strong back" would be used in which of the following locations? On top of truss bottom cords Bottom of floor joists Outside corners of wall framing On top of trusses before sheathing

On top of truss bottom cords

A salesperson may work for One builder Two builders maximum Any manufacturer As many builders as they are licensed

One builder

A person who has failed to renew his license within 3 years may Continue to practice trades Retest Use the license of another contractor Pay all the late and registration fees

Pay all the late and registration fees

12 x 12 fiber board ceiling tiles require _____ staples 9/16 long along each flanged edge. Per the manufacturer's specifications. 4 6 7

Per the manufacturer's specifications.

Definition of control & possession Limitation Physical dominion Licensee Certificate of Occupancy

Physical dominion

The Department has ______________ over the files from each Board Right to know Full authority Censure Physical dominion

Physical dominion

When building a slab on grade, what action would be performed last? Fine grading. Excavating. Forming. Placing reinforcing steel.

Placing reinforcing steel.

Best describes the form work for wet plaster Bead boards Guides Lathe Plaster grounds

Plaster grounds

Another name for this basic type of framing also called western framing is Balloon Rough Platform Stud

Platform

As the general contractor for a project, you are responsible for overseeing the pouring of the concrete slab foundation. When should the subgrade be lightly moistened prior to pouring the slab? One day before concrete is poured to allow the water to penetrate. Prior to pouring the concrete. When temperatures will exceed 90° F. When Type III concrete is being used.

Prior to pouring the concrete.

A construction company must file his estimated income taxes Quarterly Bi-annually Yearly By April 15th

Quarterly

Insulation is rated for heat reflectivity using which symbol? E I K R

R

For zone #1 (Lower half of Michigan's Lower Peninsula) the insulation requirements for walls is R-11 R-13 R-15 R-21

R-21

For zone #1, the insulation requirement for roof/ceiling area (attic) are: R-20 R-30 R-49 R-60

R-49

When concrete is placed during hot weather, cracks resulting from surface shrinkage can be caused by? Excess wetting of the subgrade. Failure to broom the surface. Rapid drying of the concrete at the slab surface. Excessive water in the concrete.

Rapid drying of the concrete at the slab surface.

Your company is constructing a deck for a customer. Pressure-treated wood is not available due to a shortage, so an alternative type of lumber must be used. What lumber will meet the Michigan Residential Code, requirements for durability and resistance to decay? Douglas fir. Birch. Redwood. White pine.

Redwood.

The principle design of the W or fink truss is based on Weight to span calculations Rigidity of the triangle Half the length x height E of the structural members

Rigidity of the triangle

Powder activated tools should not be used on Steel Wood Concrete Rock

Rock

When pouring concrete, what type of aggregate would allow concrete to pump easier? Pea gravel. Rounded such as river gravel. Sand. Crushed concrete.

Rounded such as river gravel.

_____________ must be maintained for each hazardous chemical in a work place or job site.

Safety Data Sheet

You are beginning the initial stages of excavating for the foundation. What type of soil has the greatest chance of shifting during excavation? Gravel Sand Clay Topsoil

Sand

The Director is appointed with the advice and consent of the Senate Governor Board Department of Labor and Economic Growth

Senate

The Governor appoints the members of the Board with the advice and consent of the Board Director Senate Department

Senate

City ordinances can indicate the distance from a property line to the home. This is called a: Strong back Elevation Horizontal run Setback

Setback

You are beginning construction of a new home for a customer. What is the test called to determine the bearing capacity of undisturbed ground? · Floatation · Percolation · Slump · Soil boring

Soil boring

Truss design drawings shall include: Span Spacing Loads Span, spacing, and loads

Span, spacing, and loads

As a general contractor, MIOSHA rules state you do not need to supply which of the following to an employee? Safety glasses. Steel toe shoes. Hand protection such as gloves A written safety program.

Steel toe shoes.

Which tool would be most appropriate for determining grade for a slab? Tape Measure. Tamper. Strike-off board. Level.

Strike-off board.

The overhanging part of a rafter that extends beyond the exterior wall is defined as the · Overhang · Soffit · Tail · Fascia

Tail

A complaint is sent to who?

The Department (LARA)

What must happen if a complaint is brought against a contractor and it is settled during an informal conference? The contractors license will be suspended for 30 days minimum. A letter of warning will be issued which remains in the builders file for 1 year. Settlement must include a minimum fine of $100.00. The Department and parties involved must agree on the settlement.

The Department and parties involved must agree on the settlement.

Calculate how much tax should be refunded or paid based on the following information: Federal Income tax you have paid for the year= $4,754Federal Income tax owed for the year = $5,797 The contractor owes $7500 The contractor gets a refund of $7500 The contractor owes $1043 The contractor gets a refund of $1043

The contractor owes $1043

An employer must keep detailed records of all non exempt employees. From the choices below select what record is not required to be kept according to the Minimum Wage Law of 1964. Total amount paid to each employee. The time the employee left work each day. Total hours worked by the employee each day. Deductions and additions to paycheck.

The time the employee left work each day.

Nylon or polyester bristle paint brushes are best suited for use with Varnish Oil based paints Water based paints Lacquers

Water based paints

Which does NOT require the use of safety glasses? When using a manual screwdriver. When using a drill press. When using a drill press. When using a band saw.

When using a manual screwdriver.

Stool and apron trim would be found at which location Floor area Door area Window area Ceiling area

Window area

You are in the process of constructing a block wall. Due to the size of the wall, reinforcement will be required to support the bearing loads. What is the best method to reinforce a block wall? Adding hardener to the concrete mix. Rerod. Masonry Ties. Wire mesh.

Wire mesh.

Minors are required to have a ___________ in order to be employed, unless specifically exempted. Work permit Parents approval Michigan Driver's License All of the above

Work permit

The purpose of a story pole when used for framing is A) a 2 x 4 stud used as a guide marking heights of horizontal members and lengths of vertical members B) a mark on a pole for checking elevations C) a stud on site used to leave notices for other trades D) the location that inspection stickers are posted

a 2 x 4 stud used as a guide marking heights of horizontal members and lengths of vertical members

At a hearing, the respondent may be represented by the Hearing Examiner an attorney an Investigative Officer the Complainant

an attorney

The first course of block is laid on top of a ____________ which is placed on top of the footing. bed of cement bed of mortar thin layer of cement layer of lime

bed of mortar

Per EPA 747-B-99-004, the lead pre renovation rule (PRE) applies to residential homes built before 1978 after 1978 before 1990 after 1990

before 1978

When constructing a brick veneer wall, which of the following statements would meet proper construction and code requirements? a) The wall cavity must be greater than 3". b) Both wythes are must be designed to equally share the load. c) Supporting structure is built before attaching the veneer. d) The veneer may be attached directly to the supporting structure.

c) Supporting structure is built before attaching the veneer.

In order to be effective, foil faced insulation must have the foil side ____________. exposed to a 1" or more air space be in contact with the drywall facing the exterior siding have contact with another vapor barrier

exposed to a 1" or more air space

The visible part of overlapped shingles is called ____________ end-lap. exposure. drip line. cap.

exposure.

In standard kraft-faced insulation, the vapor barrier must face the exterior siding face the heated area be removed in a crawl space be in contact with the drywall

face the heated area

You are responsible for insulating part a job. How should a vapor barrier on blanket (batts) insulation be installed? face the cold side of the wall. face the warm side of the wall. be removed before installation. insulation facing the interior of the structure.

face the warm side of the wall.

The foundation wall is supported by slab pier footing pilaster

footing

Define the following: What is the structural wood component called that is used to span a door or window and support structures above the opening? lintel. header. beam. support

header.

A person must have a Salesperson's license to sell jobs if his or her sales are more than occasional. his or her sales are less than occasional. never. none of the above.

his or her sales are more than occasional.

What is used to check the depth of an excavation when using a builders level? dipper stick. leveling rod. measuring rod. tape measure.

leveling rod.

The _________ applies for the salespersons license. Board salesperson licensed residential builder Department of Labor and Economic Growth

licensed residential builder

With painted wood siding, peeling results when ______________ in siding is drawn from the wood by the suns heat and pushes the paint from the surface. moisture wood sap dirt heat

moisture

When using an extension ladder, what is the last rung you may stand on according to MIOSHA standards? the first rung below the top of the ladder. the second rung below the top of the ladder. must be at least 24" from the top of the ladder. must be at least 36" from the top of the ladder.

must be at least 36" from the top of the ladder.

Toe boards should be located no higher than 12 facing the working area on each end of planking on top of planking along the edges

on top of planking along the edges

The depth of notches in solid lumber joists shall not exceed _________ of the depth member. one sixth one third one quarter one tenth

one sixth

The main purpose of flagged tips in bristles is to create a smoother finish provide greater paint holding ability make for easier cleaning make the brush last longer

provide greater paint holding ability

The _________ of a corporation is responsible for full compliance to codes. Board of Directors corporate attorney chairperson qualifying officer

qualifying officer

Most lumber is cut so that the annular rings form an angle between 60 degrees and 90 degrees with the surface of the board. This is referred to as __________ sawn. flat miter quarter cross grain

quarter

The "R" value of an insulation product refers to heat capacity. heat reflectivity. resistance to heat flow. thickness of insulation.

resistance to heat flow.

Kitchen cabinets are installed by the use of bolts and nuts nails and construction adhesive toggle bolts into drywall screws through the cabinet into studs

screws through the cabinet into studs

Changes to plans and specs should be _________ and _________ by all parties involved in that phase of construction. signed and dated signed and sealed signed and witnessed approved and agreed to

signed and dated

The actual dimension of 2 X 6 framing lumber is 2" X 6" 1 1/2" X 5 1/2" 1 1/2" X 5 1/4" 1 3/4" X 5 3/4"

1 1/2" X 5 1/4"

The handgrip portion of a handrail shall have a circular cross section of _______ inches minimum to ______ inches maximum. 1 1/4, 2 1 1/2, 2 1/2 1 1/2, 2 3/4 1 1/4, 2 3/8

1 1/4, 2

Standard thickness for interior doors are 1" 1 3/8" 1 ½" 2"

1 3/8"

The minimum requirement for a door leading from the attached garage into the dwelling unit is..?

1 3/8" solid core

The minimum air space between the face brick & the sheathing is 1 inch 2 inches 3 inches 4 inches

1 inch

According to code, asphalt shingles may be applied over an existing roof which has mopped tar. 1 layer of cedar wood shakes. 1 layer of asphalt shingles. 2 layers of rolled roofing.

1 layer of asphalt shingles.

The installation of bevel wood siding requires a specific number of face-nailed nails per stud. Select the correct answer from the choices below for nailing 6 inch wide bevel wood siding. 1 per stud 2 per stud 3 per stud 4 per stud

1 per stud

After a claim of lien has been recorded, what is the minimum length of time enforcement of the lien must be started?

1 year

Subcontractors, suppliers and laborers have up to ________ to file a lawsuit to enforce the lien in court. 90 days 6 months 1 year 18 months

1 year

Determine the cost per square foot to construct the following concrete forms. Labor Required = 11 HoursCost per Hour = $10.64Total Square Feet of Concrete Forms = 100 square feet 0.83 0.95 1.07 1.17

1.17 Formula: Number of man-hours X cost per man-hour 11 X $10.64 = $117.04 Divide the answer by the number of square feet. $117.04 divided by 100 = $1.17 per square foot

Except as otherwise provided, after 40 hours of work an employee shall be compensated not less than __________ times the regular rate. 1.5 2 50% 100%

1.5

The ends of each joist shall have not less than ______ of bearing on wood or metal. 1.5 inches 2 inches 2.5 inches 3 inches

1.5 inches

Calculate the solution to the following problem.Horizontal run = 85 feetChange in elevation per foot = -1/4"What is the change in elevation over 85 feet? .5 feet 1.8 feet 21.25 feet 85.0 feet

1.8 feet Determine the change in elevation. For every foot the elevation drops 'bc" Multiply 85 feet by .25.85 ft. X .25" = 21.25" Convert inches to feet = 21.25" / 12" = 1.77 feet Closest answer is 1.8 feet

An attached garage shall be separated from the dwelling unit by a minimum of _______ drywall applied to the garage wall side. 3/8 " 1/2 " 5/8 " 2 layers 1/2"

1/2 "

Anchor bolts in the core of masonry or concrete shall be at least _____ inches in diameter and extend a minimum of _______ inches into the foundation system. 1/2 and 7 3/8 and 12 3/8 and 6 1/2 and 12

1/2 and 7

When the entire side of the wall that is notched or cut is covered with ________, a mending plate is not required. styrofoam sheeting 1/2" structural plywood celotex sheeting brick veneer

1/2" structural plywood

According to code, wood beams, rafters, and joists may NOT be notched in the middle 1/4 1/3 1/2 3/4

1/3

The diameter of holes bored into joists shall not exceed ___________ the depth of the member. 1/4 1/3 1/2 3/4

1/3

Residential plan views are generally drawn _________ scale. 1/8 1/4 3/8 1/2

1/4

The most common thickness of underlayment for vinyl flooring is _______. 1/4" 1/2" 5/8" 3/4"

1/4"

Plywood roof deck sheathing should be spaced from each other sheet by 1/8" 3/16" 1/4" 3/8"

1/8"

A licensed builder shall report major changes of his or her license within 10 days 30 days 6 months 1 year

10 days

As the safety officer for a project, you are responsible for making sure all MIOSHA rules are complied with. A tubular steel scaffold must have a guardrail if it is above what minimum height? 6' 10' 12' 20'

10'

MIOSHA rules dictate the minimum distance between power lines and a portable non-metallic ladder. What is the minimum distance allowed? 5' 10' 12' 15'

10'

10 pieces of 1"x12"x10' long = _________ board feet. 12 100 120 1200

100 (Number of pieces x Height x Width x Length in feet) / 12" = Board feet(10x1x12x10) / 12" = 100 Board feet

What tax form does a builder send to his sub contractors? 941 1099 Not required W-2

1099

Basic wind speeds for 50 year mean recurrence interval for Michigan is · 60 mph · 70 mph · 80 mph · 115 mph

115 mph

As related to foundation drainage, gravel drains must extend outward from the footing a minimum of ______ inches. 6 12 24 36

12

In reference to scaffolds, planking should overlap at least 6" 8" 12" 16"

12"

In reference to scaffolds, planking should overlap at least · 6" · 8" · 12" · 16"

12"

Scaffold planking should overlap other planks by 3" 6" 12" 24"

12"

Scaffold planking should overlap other planks by · 3" · 6" · 12" · 24"

12"

What is the size of a standard shingle? 12" X 24" 12" X 36" 14" X 24" 14" X 36"

12" X 36"

Calculate how many cubic yards of concrete are needed for a trench footing 24' x 24' x 4' deep by 1' wide. 14 cubic yards 14.22 cubic yards 15 cubic yards 15.5 cubic yards

14 cubic yards Step 1 - Calculate the total length of the walls. 2 walls x 24 feet = 48 feet 2 walls x (24 feet - 2 feet) = 44 feet Total length = 48 feet + 44 feet = 92 feet Note: You have to subtract two feet from two of the walls to account for the thickness of the other two walls. Step 2 - Use the cubic yard formula and round your answer to the next highest cubic yard. The formula is: (Length x Width x Thickness) / 27 cubic feet = (92 x 4 x 1) / 27 cu.ft. = 368 / 27 = 13.63 or =14 cu. yd.

A new construction home requires 20,000 square feet of common brick. How many bricks will be required? 70,000 90,000 120,000 140,000

140,000 Formula: Total square footage x 7 Note: There are 7 brick per square foot 20,000 square feet x 7 = 140,000 bricks

A new construction home requires 20,000 square feet of common brick. How many bricks will be required? 70000 90000 120000 140000

140000 Use the following formula: Total square footage x 7 Note: There are 7 brick per square foot 20,000 square feet x 7 = 140,000 bricks

2 pieces of 1 1/4" x 10" x 8' long = _________ board feet. 5 13.33 16.67 200

16.67 Formula: (Number of pieces x Height x Width x Length in feet) / 12" = Board feet (2 pieces x 5/4 x 10 x 8) / 12" = 800/48 = 16.67 Board feet Note: Change 1 1/4" to a fraction which is 5/4

Non-treated floor joists must be a minimum of ___________ inches from the exposed soil in a crawl space. 12 inches 16 inches 18 inches 24 inches

18 inches

A complaint filed against a licensed builder must be within _______ of job completion. 1 year 18 months 2 years anytime

18 months

General public means anyone Other than a licensed occupation 18 years or older Who resides in Michigan 18 years or older, who resides in Michigan, and other than a licensed occupation

18 years or older, who resides in Michigan, and other than a licensed occupation

In reference to block foundation waterproofing the parging coat would be the ______ layer of cement plaster. 1st layer 2nd layer final inside layer

1st layer

According to code, the minimum required clearance between wood framing and an interior chimney when the within the exterior wall is: 1 2 3 4

2

According to code, the minimum required clearance between wood framing and an interior chimney within the exterior wall is: 1 2 3 4

2

The Board shall meet no less than _____ times per year. 2 4 6 12

2

Excavated soil and rock must be stored at least ________ from the edge of an excavation. · 2 feet · 3 feet · 4 feet · 10 feet

2 feet

MIOSHA defines a "hole" as a gap or void in a work surface with the least dimension of · 2 inches · 3 inches · 4 inches a. 5 inches

2 inches

Any portion of an interior masonry chimney shall have a minimum air space clearance to wooden beams or joists of 3/4" inch. 1 1/2 inches. 2 inches. 3 inches.

2 inches.

According to the Michigan Residential Code, each wood shingle or wood shake should be attached by 2 nails. 3 nails. 4 nails. 5 nails.

2 nails.

An unlicensed residential contractor who violates Act 299 a second time is punishable by a fine of not more than $25,000.00, or imprisonment for not more than __________ or both. 90 days 2 year 18 months 5 years

2 year

What minimum size planking can be used for scaffolds? 2" x 6" 2" x 8" 2" x 10" 2" x 12"

2" x 10"

According to Table 402.2 in the Michigan Residential Code, what is the minimum compressive strength of concrete for foundations not exposed to weather? 1,000 PSI 2,500 PSI 2,800 PSI 3,000 PSI

2,500 PSI

In masonry veneer walls, there shall be at least one metal face brick tie for each _____ square foot of block wall area. 2.67 7.5 8 10

2.67

What is the diagonal measurement of a 12 x 16 wood deck? 18.75 feet 20 feet 20.5 feet 21 feet

20 feet Formula = A squared + B squared = the square root of H where A = Run, and B = Rise Run = 16, Rise = 12 = 16 squared + 12 squared = square root of H = 256 + 144 = square root of 400 = square root of 400 = 20 feet

MIOSHA rules state that the maximum permissible height for ladder jack scaffolds is? 6' 10' 16' 20'

20'

Face brick metal wall ties attached to wood framing shall be not less than number ________ U.S. gage by 7/8 inch corrugated. 16 22 30 32

22

1 cubic yard of concrete equals ______________. 9 cubic feet 27 cubic feet 1 1/2 tons 2000 pounds

27 cubic feet

Combustible insulation shall be separated a minimum of ________ inches from heat producing devices. 2 3 4 6

3

To make the insertion of ceiling tiles easier, what is the recommended minimum spacing between the bottom of framing members and the top edge of the drop ceiling grid? 1" 2" 3 - 4" 4 - 5"

3 - 4"

A ventilating opening within a crawl space shall be located within __________ of each corner of a building. 3 feet 6 feet 8 feet 10 feet

3 feet

The amount of overlap for a ladder up to and including 32 feet is · 2 feet · 3 feet · 4 feet · 5 feet

3 feet

The ratio of backspan to cantilever floor joists shall not be less than ______ when supporting light frame exterior bearing walls and roof only. 2 to 1 3 to 1 4 to 1 5 to 1

3 to 1

The construction code is updated every 2 years 3 years 5 years As needed

3 years

A benchmark on a site plan has an elevation of 118.42 feet. Finish grade has an elevation of 115.22 feet. The finish grade is how many feet lower or higher than the benchmark? 3.20 feet higher. 3.20 feet lower. 5.20 feet higher. 2.20 feet lower.

3.20 feet lower. To determine the difference in elevation subtract the finish grade from the benchmark: = 118.42 - 115.22 = 3.20 feet lower

Wood shakes shall not be installed on slopes less than __________. 2/12 3/12 4/12 5/12

3/12

If stairway nosing is required, then the minimum depth is ______ inches and the maximum depth is ______ inches. 3/4, 1 1/4 1/2, 3/4 1, 1 1/2 3/4, 1 1/2

3/4, 1 1/4

A person who has received a limitation may petition the department within _____ days for a review of the decision. 10 15 30 60

30

A building board of appeals shall render its decision not more than _____ days after submission of appeal.

30 days

A licensed builder shall report minor changes of his license within 10 days 15 days 30 days 45 days

30 days

A licensed builder shall report minor changes of his/her license within how many days?

30 days

A person who has received a limitation may petition the department within how many days?

30 days

After notice by the Department, financial statements of a licensee shall be submitted within 10 days 15 days 20 days 30 days

30 days

If a limitation has been placed on a license, how long does that person have to submit a petition to the department in writting?

30 days

The investigative unit must report the status of a complaint to the Director within how many days?

30 days

The investigative unit of the department must report the status of the investigation to the Director within how many days?

30 days

The minimum unobstructed head room above the roughed frame access opening for the attic is ___________. 24 inches 30 inches 36 inches 42 inches

30 inches

The span rating on a 15/32 sheet of O.S.B. is labeled 32/16. This material is sufficient for the decking of the roof trusses if the trusses are ________ or less on center. · 16 inches · 24 inches · 30 inches · 32 inches

32 inches

Maximum spacing of weep holes is _________ inches. 24 30 33 36

33

The required stairway shall not be less than _______ inches in clear width 32 36 42 48

36

According to code, what is the minimum height permitted for finished guardrails (NOT used as handrails) in residential one- and two-family dwellings? 30 inches 36 inches 38 inches 42 inches

36 inches

The minimum width of a hallway shall be not less than 32 inches 36 inches 42 inches 48 inches

36 inches

According to code, what is the minimum height permitted for finished guardrails (NOT used as handrails) in residential one- and two-family dwellings? 30 inches. 36 inches. 38 inches. 42 inches.

36 inches.

You are constructing a wall using 2 X 4 wood. If the wall will be 48-feet long, how many studs will be needed for spacing 16 inches on center? 36 37 60 63

37 Step 1: Convert the number of feet in the length of the wall to inches. = 48 feet x 12 inches per foot = 576 inches Step 2: Divide by 16 inches for stud spacing. 576 / 16 = 36 + 1 = 37 studs (One stud is added for the beginning of the wall)

You are constructing a wall using 2 X 4 wood. If the wall will be 48-feet long, how many studs will be needed for spacing 16 inches on center? 36 37 60 63

37 Step 1: Convert the number of feet in the length of the wall to inches.= 48 feet x 12 inches per foot = 576 inches Step 2: Divide by 16 inches for stud spacing.576 / 16 = 36 + 1 = 37 studs (One stud is added for the beginning of the wall)

Ladders or steps are used to enter trenches more than ________ deep 3 feet 4 feet 6 feet 8 feet

4 feet

Ladders or steps are used to enter trenches more than ________ deep · 3 ft · 4 ft · 6 ft · 8 ft

4 ft

When roofing, what is the proper way to fasten 3-in-1 asphalt strip shingles? 2 nails along the top of the shingle. 3 nails, one at each end and one in the center. 4 nails, one at each end and one in each cutout. 4 nails equally spaced along the nailing strip.

4 nails, one at each end and one in each cutout.

The minimum openable area to the outdoors shall be ______ of the floor area being ventilated. 4% 6% 8% 10%

4%

Floor joists under bearing partitions shall be blocked a minimum of _____ inches on center. 16 24 36 48

48

The required ventilation for a 3,000 square foot roof is 1/300 of the horizontal roof projection area. The ventilation will be evenly split between ridge vents and soffit vents. How many square feet of soffit vent are required to comply with the ventilation requirements? 3 5 8 20

5

A 3,000 square foot roof requires 10 square feet of ventilation. The ventilation will be divided equally between ridge and soffit vent. How many square feet of soffit vent will need to be purchased? 2 5 10 15

5 3,000 square feet is the total square footage. 3,000 divided by 300 = 10 square feet of total ventilation required. The ventilation will be split equally between ridge vents and soffit vents. 10 square feet divided by 2 = 5 square feet of soffit vent required.(5 square feet of ridge vent would also be required.)

A gable truss spans 40 feet if the slope is 3/12. What is the rise height at the ridge? 5 6 7 8

5 Rise = 3 Run = 12 1/2 of Run = 20 (based on the 40 ft truss length) Determine the Rise that corresponds with half of the length of the truss. Formula: (1/2 of Run multiplied by known Rise) / run = (20 ft x 3) / 12 = 60 ft / 12 = 5 ft

If a gable roof has a span of 40 feet and the rafter slope is 3 in 12, what is the height of the ridge? 3 feet. 5 feet. 7 feet. 9 feet.

5 Feet The formula to determine ridge height is as follows: Take 1/2 the length of the roof span. 40 feet divided by 2 = 20 feet Now multiply 20 feet by the slope which is 3 in 12. 20 X 3/12 = 60 / 12 = 5 feet

A ladder 20 ' high would be ____ from the building at the bottom. 3 feet 4 feet 5 feet 6 feet

5 feet the foot of the ladder should be a distance equal to one-fourth its working length from the building or other support

The net clear opening of a grade floor bedroom emergency escape window can be no less than ______. 5 sq ft 5.7 sq ft 7 sq ft 8.5 sq ft

5 sq ft

A bedroom emergency escape window located on the 2nd story must have a net clear opening of at least __________ sq ft. 5 5.7 10 12

5.7

If the bedroom emergency escape window was located on the second story, the clear net opening required is 5 square feet 5.7 square feet 7 square feet 8.5 square feet

5.7 square feet

Door heads and jambs are generally made of ________ thick wood stock. 3/4" 1" 5/4" 1 1/2"

5/4"

Minimum penetration for drywall screws should be_______ into wood. 1/2 5/8 3/4 1

5/8

Six pieces of lumber measure 1" x 8" x 14' What is the total board footage? 56 84 1/2 672 112 1/3

56

Six pieces of lumber measure 1" x 8" x 14' What is the total board footage? 56 84 1/2 672 112 1/3

56 Formula: 6 pieces of lumber x ( 1" x 8" x 14' ) / 12 6 pieces of lumber x (112) / 12 6 pieces of lumber x 9.333 = 56 board feet

Calculate the cubic yards excavated for a trench footing 60' x 38' x 4' deep, 2' wide. 56 cubic yards 91.20 cubic yards 570 cubic yards 320 cubic yards

56 cubic yards Step 1 - Calculate the total length of the walls. 2 walls x 60 feet = 120 feet 2 walls x (38 feet - 4 feet) = 68 feet Total length = 120 feet + 68 feet = 188 feet Note: You have to subtract 4 feet from two of the walls to account for the thickness of the other two walls. Step 2 - Use the cubic yard formula and round your answer to the next highest cubic yard. The formula is: (Length x Width x Thickness) / 27 cubic feet = (188 x 4 x 2) / 27 cu.ft. = 1504 / 27 = 55.70 or = 56 cu. yd.

Most exterior doors are _________ high. 6 feet 4 inches 6 feet 6 inches 6 feet 8 inches 7 feet

6 feet 8 inches

In reference to fall protection, a height above ______ requires fall protection. 6 ft 12 ft 20 ft 30 ft

6 ft

In reference to fall protection, a height above ______ requires fall protection. · 6 ft · 12 ft · 20 ft · 30 ft

6 ft

MIOSHA Part 12 Planking should extend beyond all supports at least · 6" · 8" · 12" · 16"

6"

After receipt of the Administrative Law Hearings examiners report, the Board shall assess penalties within 10 days 15 days 30 days 60 days

60 days

The director may impose a limitation on a license if the board fails to approve nor disapproves the imposition of a limitation within 10 days 15 days 30 days 60 days

60 days

When nailing 1/2" O.S.B. board to floor joists, what is the minimum nail size? 10D 8 penny 6D common 16D

6D common

Per the EPA lead pre renovation rule (PRE), if a contractor mails the lead pamphlet it must be done ______ days before renovation begins and documented with a certificate of mailing. 7 days 10 days 30 days 60 days

7 days

Ceiling joists are 16" on center, no adhesive is used, nail spacing for 1/2 inch drywall is 6" on center 7" on center 8" on center 12" on center

7" on center

Every family room shall have not less than __________ square feet of gross floor area. 50 70 90 100

70

Every dwelling unit shall have at least one habitable room not less than _________ of gross floor area. 80 S.F. 100 S.F. 70 S.F. 200 S.F.

70 S.F.

Fireplace dampers shall be located not less ______ inches above the top of the fireplace opening. 2 4 6 8

8

In reference to smoke alarms, if a home is required to have 8 alarm units, how many must be interconnected? 2 4 6 8

8

Wall studs are 16" on center and no adhesive is used. Nail spacing for 1/2" drywall is 6" on center 7" on center 8" on center 12" on center

8" on center

The Board is made up of 3 members 7 members 9 members 11 members

9 members

The Board is made up of 3 members 7 members 9 members 11 members

9 members 3 from the general public 6 licensed members

You are responsible for the grading and excavation on the work site. Your level (transit) reads 6.4 ft on a leveling rod that has been set up on top of a benchmark that has a given elevation of 100.0 ft. The finish grade as shown on the blueprints is 96.80 ft. Calculate what the rod reading should be on the finished grade after all fill has been placed, compacted, and graded? 3.20 ft -3.20 ft 6.40 ft 9.60 ft

9.60 ft Formula: The rod reads 6.40 at an elevation of 100.0 feet. At an elevation of 96.80 feet, what should the rod read? Take the difference in elevation: 100.0 - 96.80 = 3.20 feet Add the current reading to the difference in elevation to reach the finished grade level: 6.40 + 3.20 = 9.60 feet

Calculate the number of floor joists needed for a floor system 60' X 30' with a steel floor beam in the center. Use 16' joists. Do not include partition supports, headers, etc. 46 joists 60 joists 92 joists 120 joists

92 joists (Length of wall x .75) + 1 = Number of floor joists (Plus extras for headers, partitions, etc.) (60' x .75) + 1 = 46 joists 46 joists x 2 sides = 92 joists total

Money paid to a builder by a purchaser is considered to be Voidable consent A trust fund Escrow fund Void consent

A trust fund

Standard hinge spacing for a 2 hinged door is A) 7" from top 11" from bottom B) 8" from top 8" from bottom C) 11" from top 7" from bottom D) 12" from top 12" from bottom

A) 7" from top 11" from bottom

The Board sets minimal standards of Law Material strength Acceptable practice Building Codes

Acceptable practice

From the choices below, select the definition that best describes "place of business". Actual established physical location. Address submitted to the state when the business was established. Address of the CEO of the company. Mailing Address.

Actual established physical location.

Who hears contested cases?

Administrative Law Hearing Examiner

When are concrete control joints put into the moist concrete? After brooming As soon as possible While the water is on top After the sheen disappears

After the sheen disappears

A builder is required to deliver only _________ to his/her customer. Blue prints Agreements All agreements, plans and specs Sales agreement

All agreements, plans and specs

You have been awarded a project to restore a historical home. Part of the restoration requires painting and acid will be used to prepare and clean the surface. What must you as the contractor provide to your employees for protection on the job? Eyewash kit. First aid kit. Material Safety Data Sheets. (MSDS) All the above

All the above

From the choices below, select the best definition of subcontract. An agreement between the subcontractor and architect. An agreement between the subcontractor and material supplier. An agreement between the subcontractor and owner. An agreement between the subcontractor and prime contractor.

An agreement between the subcontractor and prime contractor.

At what location would Collar beams be found? Around the foundation Window openings 1st floor - floor joists Conventional roof framing

Around the foundation

The amount of heat needed to raise the temperature of 1 lb. of water 1 degree Fahrenheit best describes BTU U value R value K

BTU

This elevation point is used to determine all other elevations on the construction site. Off set stake Monument Brick ledge Bench mark

Bench mark

You are in the process of determining the cost for your job. An area measuring 14' x 16' will need 3/4 inch plywood floor decking. An area measuring 18' x 16' will need 1/2 inch plywood floor decking. The costs are $20 per sheet for 3/4" plywood and $12 per sheet for 1/2 inch plywood. Calculate the total cost for all of the plywood floor decking? Less than $200. Between $225 and $250. Between $251 and $299. More than $300.

Between $225 and $250 Step 1: Determine the cost of the 1/2" plywood. There is 32 square feet of plywood per sheet. = 18 x 16 = 288 square feet = 288 square feet / 32 = 9 = 9 x $12 = $108 Step 2: Determine the cost of the 3/4" plywood. There is 32 square feet of plywood per sheet. = 14 x 16 = 224 square feet = 224 square feet / 32 = 7 = 7 x $20 = $140 = $108 + $140 = $248

Where should vapor barrier be placed? Between the insulation and outside wall. Between the inside covering (drywall) and insulation. Between the siding and insulation. Between the sheathing and the siding.

Between the inside covering (drywall) and insulation.

The "cutout" on a conventionally framed rafter that rests on the top plate is called ___________. Tail cut Plumb cut Bird mouth Seat

Bird mouth

The Department and the __________ may remove a limitation. Hearing Examiner Director Board Commission

Board

One advantage of using trusses is that they can be engineered to carry specific loads. Prefabricated trusses that span the entire width of the house are designed to carry what loads? Roof loads only. Both ceiling and roof loads. Snow loads. Roof, attic, and ceiling loads.

Both ceiling and roof loads.

Truss design drawings shall be provided to the ______________ and approved prior to installation. Builder Engineer Building official All of the above

Building official

What is the best piece of equipment for removing topsoil for the excavation of a foundation? Bobcat Bulldozer. Backhoe. Grade-all.

Bulldozer.

A layer of new wood on a tree just under the bark is called __________. · Xylem · Sap · Cambium · Phloem

Cambium

What tool is used to measure vertical angles, run straight lines, and determine if a wall is plumb? Carpenter's level. Carpenter's square. Bubble level. Laser transit.

Carpenter's level.

A newly constructed building cannot be used or occupied in whole or part without Certificate of Occupancy A final inspection Use Permit Certification Seal

Certificate of Occupancy

The overhanging part of a rafter that extends beyond the exterior wall is defined as the overhang. soffit. tail. fascia.

tail.

A plot plan shows the foundation plan the building on the site types of materials to be used elevation views

the building on the site

In a home without a basement, the only egress doors are in the living room. Where would smoke detectors NOT be required? all bedrooms. all hallways next to bedrooms. each floor of the building. the kitchen

the kitchen

Dimension lines indicate the outside plane of the building the inside plane of the building distance from set backs plot plan location

the outside plane of the building

Respondent is the person who delivers the complaint the person who filed the complaint a board member the person whom a complaint has been filed against

the person whom a complaint has been filed against

The main purpose of the top plate is to increase height of wall add strength for the roof load added support for trusses tie in partitions and intersecting walls

tie in partitions and intersecting walls

The general practice is to make the footing _____________ as wide as the wall it supports. one and a half twice two and a half three times

twice

Bleeding" is defined as the release of trapped air in the concrete. water rising to the surface of the concrete. separation of sand from the finer concrete. separation of the sand from the coarser gravel.

water rising to the surface of the concrete.

A brick veneer wall should be constructed flush against the block. flush against the frame sheathing. with an air space between the brick and frame construction. without an air space between the brick and the frame construction.

with an air space between the brick and frame construction.

Spacing of trusses should be within what maximum tolerance specified by the plan? ¼ inch ½ inch ¾ inch 1 inch

¼ inch

An employer who fails to comply with the provisions of Act 317, Section 611 is guilty of a misdemeanor and may be fined not more than ________, or imprisoned for not more than _________, or both. Each day's failure to comply is a separate offense. $1,000 / 90 days $1,000 / 6 months $1,000 / 1 year $3,000 / 90 days

$1,000 / 6 months

What is the maximum fine for giving MIOSHA false information? $500 $1,000 $5,000 $10,000

$10,000

A licensed builder shall reply to a complaint within 10 days 15 days 20 days 30 days

15 days

After filing a lien at the County Registrar of deeds, subcontractors, suppliers, and laborers must notify the homeowner either in person or certified mail within how many days?

15 days

The Department shall acknowledge receipt of a complaint to the complainant within 5 days 10 days 15 days 30 days

15 days

The Department shall acknowledge receipt of a complaint within now many days?

15 days

The dept upon receipt of a complaint shall immediately begin its investigation of the complaint & make a written acknowledgement within how many days?

15 days

The minimum crawl space ventilation required is 1 square foot per each ______ square feet of under floor space without a vapor barrier. 100 150 300 600

150

Total "run" for a flight of steps is 12 feet. The "rise" is 8 feet. Which of the following 2 x 12 lengths is the most suitable? 12 feet 14 feet 16 feet 18 feet

16 feet Formula = A squared + B squared = the square root of H where A = Run, and B = Rise Run = 12, Rise = 8 = 12 squared + 8 squared = square root of H = 144 + 64 = square root of 208 = square root of 208 = 14.42 feet = most suitable length = 16 feet Since 14 feet would be too short, the next greater length sold is 16 feet.

Total "run" for a flight of steps is 12 feet. The "rise" is 8 feet. Which of the following 2 x 12 lengths is the most suitable? 12 feet 14 feet 16 feet 18 feet

16 feet Formula = A squared + B squared = the square root of Hwhere A = Run, and B = Rise Run = 12, Rise = 8 = 12 squared + 8 squared = square root of H = 144 + 64 = square root of 208 = square root of 208 = 14.42 feet = most suitable length = 16 feet Since 14 feet would be too short, the next greater length sold is 16 feet.

Wall studs are 16" on center and no adhesive is used. Spacing for screws for 1/2" drywall is (Drywall either direction) 12" on center 16" on center 24" on center 32" on center

16" on center

An access opening to a crawl space through a perimeter wall shall be a minimum size of 12" x 24" 16" x 24" 24" x 24" 32" x 24"

16" x 24"

Indicate the uniformly distributed live load for rooms other than sleeping rooms 10 pounds 20 pounds 30 pounds 40 pounds

40 pounds

Studs in non-bearing partitions may be notched to a depth not to exceed ______ of a single stud width. 10% 20% 30% 40%

40%

All exterior footings and foundation systems shall extend ______ below actual grade. 36 inches 42 inches 48 inches 50 inches

42 inches

What is the normal depth for a footing below grade? 24 inches. 36 inches. 42 inches. 48 inches.

42 inches.

You are constructing a gable roof on a new residential home. The roof measures 44 feet long. The 16-foot roof rafters are spaced 24" on center. What is the total number of 4 X 8 sheets of plywood are needed to deck the roof? 20 44 48 52

44 Multiply the gable roof measurement and the rafter height. 44 x 16 = 704 square feet 2. Since there are 2 sides to the gable roof, multiply by 2.704 x 2 = 1,408 square feet 3. Determine the size of the plywood. Multiply the plywood size. 4 x 8 = 32 square feet per sheet of plywood. 4. Determine the number of sheets. Area of the roof divided by the plywood size. 1,408 square feet of roof area / 32 square feet per sheet = 44 sheets of plywood required.

You are constructing a gable roof on a new residential home. The roof measures 44 feet long. The 16-foot roof rafters are spaced 24" on center. What is the total number of 4 X 8 sheets of plywood are needed to deck the roof? 20 44 48 52

44 Multiply the gable roof measurement and the rafter height. 44 x 16 = 704 square feet 2. Since there are 2 sides to the gable roof, multiply by 2.704 x 2 = 1,408 square feet 3. Determine the size of the plywood. Multiply the plywood size.4 x 8 = 32 square feet per sheet of plywood. 4. Determine the number of sheets. Area of the roof divided by the plywood size. 1,408 square feet of roof area / 32 square feet per sheet = 44 sheets of plywood required.

An unlicensed residential contractor who violates Act 299 for the first time is guilty of a misdemeanor punishable by A fine not less than $5000 or more than $25,000 or not more than 1 year in jail or both. A fine not more than $500.00 Not more than 90 days in jail A fine not more than $1000.00 and 30 days in jail

A fine not less than $5000 or more than $25,000 or not more than 1 year in jail or both.

Per the A.D.A., when is drug screening allowed? Not allowed at any time Only for pre-hiring Only after hiring Anytime

Anytime

As the general contractor on the job site, you are responsible for overseeing the excavation and grading of the site. The soil conditions on the site consist of mostly clay. From the choices below, select the answer that is not true concerning the compaction of clay. A compaction test will only be valid if the clay has the right amount of water. As water content of the clay increases, the density will also increase. If clay is too wet to pass a compaction test, drying the clay will probably allow it to pass the test on the second attempt. Particles of clay slide into place when water acts as a lubricant.

As water content of the clay increases, the density will also increase.

A builders license shall be displayed When required to show proof At the time of sales At the place of business In the builder's truck

At the place of business

Who approves the context and makeup of the builders test Department Board Department and Board Department, Board, & Attorney General

Department and Board

Books and records of a builder are open to inspection by Building Department Anyone Department of Licensing & Regulatory Affairs Local building inspector

Department of Licensing & Regulatory Affairs - LARA

As a licensed builder, you are applying for a permit to construct a new house. Which of the following is required to be submitted? License number of the subcontractor. Description of the work to be done. A copy of the contract. Completion date.

Description of the work to be done.

If the Board fails to determine the penalties within the set time limits, the ________ may determine the penalty. Hearing Examiner Board Director Commission

Director

Indicates types and location of siding, shingles, windows, and doors. Framing plan Site plan Elevation plan Foundation plan

Elevation plan

What tax is withheld from an employee's check in order to pay medical bills after retirement? Disability FICA Workers Compensation Unemployment

FICA

The Director is appointed by the Congress Governor Senate Department of Consumer & Industry Services

Governor

The Director is appointed with the advice and consent of the Senate Governor Board Department of Labor and Economic Growth

Governor

The _______________ appoints the members of the Board Director Governor Senate Department

Governor

Best describes a space in a building for living, sleeping, eating or cooking. Habitable space Living space Occupancy area Living area

Habitable space

Select the correct answer from the choices below. What is the definition of a brick laid across two wythes of masonry? Soldier Corner stone Header Block

Header

Why are toeboards used on a scaffold? Help prevent tools from falling. Provide a ridge to indicate the edge of the scaffold while working. Secure the scaffold to a building. Add rigidity and strength to the planking.

Help prevent tools from falling.

A person who violates Act 299 is subject to a civil fine not to exceed $1,000 $10,000 $100,000 $500,000

$10,000

An employer's "willful" violation of MIOSHA regulations may result in a fine up to $7,000.00 $10,000.00 $25,000.00 $70,000.00

$10,000.00

If death results from an injury, the employer without worker's compensation insurance shall pay reasonable expenses of the funeral and burial. Costs shall not exceed ____________. $3,000 $6,000 $9,000 $10,000

$6,000

As the safety officer for a project, you are responsible for making sure all MIOSHA rules are complied with. A tubular steel scaffold must have a guardrail if it is above what minimum height? · 6' · 10' · 12' · 20'

10'

What is the size of a standard shingle? · 12" x 24" · 12" x 36" · 14" x 24" · 14" x 36"

12" x 36"

According to Part 22 of the Safety Standards, what is the minimum permissible height for a saw-horse type barricade that will be used to direct traffic? · 24" · 30" · 36" · 40"

36"

According to the Michigan Residential Code, openings in a pool enclosure fence shall prohibit passage of a sphere what diameter or greater? 2" 4" 5" 6"

4"

What type of material should be used around drain tiles when building the foundation? Gravel Topsoil Peat Moss Sand

Gravel

Containers and drums without labeling should be considered? · Safe. No special handling is required · Safe, but handle as if hazardous material was present · Hazardous Material · As hazardous material and be buried or burned

Hazardous Material

What does figure #3 (below) refer to? · Cripple stud · Header · Sill · Top Plate

Header

A salesperson shall turn over money for a sale to their licensed builder Immediately Within 10 days Within 48 hours Anytime

Immediately

Who is responsible for notifying the department of a licensee's change of address? Licensee Bookkeeper Secretary of State Lawyer

Licensee

The project you are working on requires a poured concrete foundation and was originally scheduled to start in October. Due to circumstances beyond your control, the start of the project is delayed until December. When is it acceptable to pour concrete over frozen subgrade? Never If the ground is moistened before pouring If chemical additive is added to the concrete mix to lower the freezing point If the temperature of the concrete is maintained above freezing for 48 hours after it is poured

Never!

A contractor who with intent to defraud, upon conviction, shall be punished by a fine of Not less than $100.00 nor more than $5,000.00 and/or not less than 6 months or more than 3 years in the state prison $100.00 or less $100.00 and 90 days $6,000.00 and one year

Not less than $100.00 nor more than $5,000.00 and/or not less than 6 months or more than 3 years in the state prison

What is required of a non-resident of Michigan to obtain a builders license? $2,000 bond Passing the Michigan builders exam Irrevocable consent to service Passing the Michigan builders exam and filing an irrevocable consent to service

Passing the Michigan builders exam and filing an irrevocable consent to service

When building a slab on grade, what action would be performed last? · Fine grading · Excavating · Forming · Placing reinforced steel

Placing reinforced steel

What does fireblocking do? · Adds strength to the structure. · Prevent flame spread through concealed spaces. · Prevent bowing and warping of studs and rafters. · Dissipates heat build up and insulates around electrical fixtures.

Prevent flame spread through concealed spaces.

Where is it permissible to use shore or lean-to scaffolding? · Prohibited anywhere · Prohibited anywhere except underground · For interior use · For indoor or outdoor use

Prohibited anywhere

The director of the construction code commission sole statutory authority is to Oversee building inspectors Hold hearings Enforce building codes Promulgate rules

Promulgate rules

When concrete is placed during hot weather, cracks resulting from surface shrinkage can be caused by? · Excess wetting of the subgrade · Failure to broom the surface · Rapid drying of the concrete at the slab surface Excessive water in the concrete

Rapid drying of the concrete at the slab surface

The name of the board that regulates a residential builder is Building Board of Appeals Residential Builders & Maintenance and Alteration Contractors Board Consumer & Industry Service Board State Department of Labor Board

Residential Builders & Maintenance and Alteration Contractors Board

A.D.A. requirements do not apply to Five or more story hotels Nursing homes Movie theaters Residential private apartments and homes

Residential private apartments and homes

From the list below, select the piece of safety equipment that is not used for handling insulation. · Respirators · Gloves · Goggles · Safety belts

Safety belts

From the list below, select the material that has the greatest chance of shifting during excavation. · Fractured rock · Sand · Clay · Stone

Sand

Represents the total heat transmission loss through structural materials K R value U value BTU

U value

The most common type of truss used in homes today is the · X-truss · Scissor truss · Vaulted ceiling truss · W-truss (fink)

W-truss (fink)

Bleeding" is defined as the · Release of trapped air in the concrete · Water rising to the surface of the concrete · Separation of sand from the finer concrete · Separation of the sand from coarser gravel

Water rising to the surface of the concrete

All requirements for testing must be completed within 1 year after taking the test 1 year of filing the builders license application 18 months after mailing the application No time limit

1 year of filing the builders license application

According to OSHA, what is the minimum distance between power lines and a portable non-metallic ladder? · 5 · 10 · 20 · 25

10

A building permit shall be granted in whole or in part or denied within 7 business days 10 business days 2 weeks 30 days

10 business days

A 3,000 square foot roof requires 10 square feet of ventilation. The ventilation will be divided equally between ridge and soffit vent. How many square feet of soffit vent will need to be purchased? 2 5 10 15

5 Formula: 3,000 square feet is the total square footage. 3,000 divided by 300 = 10 square feet of total ventilation required. The ventilation will be split equally between ridge vents and soffit vents. 10 square feet divided by 2 = 5 square feet of soffit vent required. (5 square feet of ridge vent would also be required.)

According to the U.S. Department of Justice Civil Rights Division, A.D.A. refers to: Asbestos Disorders Act Alien Defense Act American Defense Act Americans with Disabilities Act

Americans with Disabilities Act

During construction it is noticed that water is seeping into the basement through the walls. What would be the best method of dealing with the problem? Backfilling with sand against the building. Applying a membrane to the exterior basement wall. Applying waterproof sealer to the interior wall. Applying tar to the outside of the wall before backfilling.

Applying a membrane to the exterior basement wall.

A formal complaint is filed against a builder for financial mismanagement. Select the organization responsible for investigating the complaint. Wage and Hourly Division Department of Licensing & Regulatory Affairs Local Building Department. Builders Investigative Unit.

Department of Licensing & Regulatory Affairs

The "stiffness" of lumber is known as E S MSR Allowable span

E

Indicates types and location of siding, shingles, windows, and doors. Framing plan Site plan Elevation plan Foundation plan

Elevation Plan

In standard kraft-faced insulation, the vapor barrier must · Face the exterior siding · Face the heated area · Be removed in a crawl space · Be in contact with the drywall

Face the heated area


संबंधित स्टडी सेट्स

The Progressive Era - Chapter 22

View Set

18: Formation of Sales and Lease Contracts

View Set

Marketing Chapter 14: Pricing Concepts

View Set