Midterm CM 2331

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

Americans with Disabilities Act

ADA

Architecture, Engineering, and Construction

AEC

American Institute of Architects

AIA

project manager team members managers resource managers executives senior management company owners investors sponsors financiers suppliers vendors consultants customers end user

project stakeholders

1. Paperwork Construction 2. Marking of Layout 3. Excavation 4. Foundation Work 5. Column Casting 6. Construction of Walls 7. Lintel 8. Roofing

sequence of construction activities

primavera p6

software used to make construction scheduling

steel

stl.

Square yard

unit of measurement for: Carpet

Square foot

unit of measurement for: Ceramic Tile

Cubic yard or Tonne

unit of measurement for: Concrete

Square foot

unit of measurement for: Countertop

Square foot

unit of measurement for: Driveways, sidewalks, parking lots

Square foot

unit of measurement for: Drywall

per unit of the item

unit of measurement for: Masonry products

Square foot

unit of measurement for: Painting

Square

unit of measurement for: Roofing

Cubic yard or Tonne

unit of measurement for: Sand and Gravel

Tonne

unit of measurement for: Steel

Board foot

unit of measurement for: Wood

preliminary cost estimation unit price cost estimation conceptual cost estimation detailed cost estimation

what are the types of construction cost estimating

Checking the work before it is distributed to the user. errors late in the process

what is quality control?

column

col.

The comprehensive documentation and associated calculations used to determine the expected cost of materials, labor, subcontractors, equipment and profit/overhead for a proposed construction projects.

construction cost estimating

Optimistic plan-with the least amount of time it will take to complete a task. assumes everything goes well without any interruptions and matching the estimated schedule. pessimistic plan-with the maximum amount of time to complete a task. Thinks everything will go wrong and wants to have backup plans for everything. realistic plan-the plan with the best estimate for how long a task will take.

ESSAY QUESTION: what is Optimistic Plan, Pessimistic Plan, Realistic Plan

Life cycle cost are more important Initial cost-fixed, one-time expenses incurred on the purchase of land, buildings, construction, and equipment used in the production of goods or in the rendering of services Life cycle cost-helps to reduce the overall cost of a project by selecting best alternative designs and components to minimize the cost not only at the time of construction, but also the over the full life of the project.

Explain Initial cost and Life-Cycle cost - Which one is more important.

creating a schedule that details every daily activity during the construction period, from day one to the project completion

Explain the construction scheduling stage of a construction project

the architect prepares the bid package, including the project design, plans, and specifications

Explain the planning stage of a construction project

create a wish list and project requirements and see if it will be feasible and within the budget

Explain the programming stage of a construction project

planning communication perform revise as needed

how can the construction scheudling be improved

Oversee the supply chain of an organization

job of logistic manager

design and specification construction contract type Constructability material order Labor Availability of Equipment weather defective work Payment Accidents vandalism management change order

list 10 elements of delay

A contract with a fixed total price for a well-defined product or service; also called a fixed-price contract

lump sum contract

Floor

Flr.

Certified (40-49) Silver (50-59) Gold (60-79) Platinum (80+)

Four levels of certification for projects (LEED)

Green Building Certification Institute

GBCI

General Contractor

GC

site plans Plot plans Excavation plans Floor plans Elevation plans MEP plans Section drawings Detail drawings Finishing drawings Reflected ceiling drawings Perspective drawings

List 10 different set of drawings included in a construction project

Mechanical Electrical Plumbing

MEP

metal

MTl.

occupational Safety and Health Administration

OSHA

Project engineer

PE

polyvinyl chloride

PVC

Tell what results the final construction assembly must achieve, but they give the contractor some choice in how they will be achieved.

Performance Specifications

Tell exactly what product or material the contractor must use by brand name

Prescriptive Specifications

Specifications where products are specifically listed by name and # and there's no substitutions allowed.

Proprietary Specification

sick building syndrome

SBS

specification

Spec.

Technical Advisory Group

TAG

United States Green Building Council

USGBC

Wood

Wd.

Prescriptive specifications, performance specifications, Proprietary Specification

What are the three different types of construction specifications

Programming, planning, construction scheduling

What are the three stages of a construction project?

design, build, construction

What are the three stages of the design process?

it is a change order after the contract has been signed

What is a change order

it is a change order before the contract has been signed

What is addenda

prevents erros before they are made

What is quality assurance?

ceiling

CLG.

Concrete Masonry Unit

CMU

Critical Path Method an algorithm that schedules a set of project activities

CPM

Construction Specifications Institute

CSI

Beam

BM.

A type of cost-reimbursable contract where the buyer reimburses the seller for the seller's allowable costs (allowable costs are defined by the contract) plus a fixed amount of profit (fee).

Cost Plus Fixed Fee Contract (CPFF)

Includes all direct costs for building plus a percentage of those costs as the builder's fee

Cost plus percentage contract

The contractor or construction manager guarantees the owner a fixed, maximum price.

Guaranteed Maximum Price (GMP)

Heating, Ventilation and Air Conditioning

HVAC

Joist

Jst.

the area in an agreement where the work to be performed is described. contains milestones reports deliverables and end products

Scope of work

Green Associate LEED AP LEED Fellow

Three levels of certification for individuals (LEED)

Register with GBCI GBCI assigns TAG Apply for certification

Three stages of LEED certification process for projects

is quality assurance + quality control

Total Quality Management (TQM)


संबंधित स्टडी सेट्स

Anatomy Quiz #3: Bones and Bone Markings

View Set

CSCI 207, COP1220 Final, Midterm, Computer Programming 1500 Final

View Set

Tema 1 La crisis del Antiguo Régimen, Tema 7: La Segunda Guerra Mundial, Tema 6 La época de entreguerras (1919 - 1939), Tema 5. Imperialismo, guerra y revolución, Tema 3: La Revolución Industrial y los cambios sociales, Tema 2: Revoluciones liberales...

View Set

Blood Bank - Serologic and Molecular Testing

View Set

Midcourse Content Exam PDBIO 210

View Set