Module 7 exam Infosec
A device that assures the delivery of electric power without interruption is a(n) __________ GFCI HVAC GPS UPS
UPS
__________ occurs when an authorized person opens a door, and other people, who may or may not be authorized, also enter. Crowdsurfing Tailgating Freeloading Hitchhiking
Tailgating
Tasks or action steps that come after the task at hand are called __________ predecessors successors children parents
successors
Fire __________ systems are devices installed and maintained to detect and respond to a fire, potential fire, or combustion danger. detection suppression protection prevention
supression
Electronic monitoring includes __________ systems. Question 10 options: blocked video local video open-circuit television closed-circuit television
Close circuit television
One of the leading causes of damage to sensitive circuitry is __________. CPU EPA ESD HVAC
ESD
The most sophisticated locks are ____ locks. Question 14 options: manual programmable electronic biometric
biometric
__________ sprinklers are the newest form of sprinkler systems and rely on ultra-fine mists instead of traditional shower-type systems. Pre-action Water mist Water-free Air-dry
water mist
The goal of the __________ is to resolve any pending project-related issues, critique the overall effort of the project, and draw conclusions about how to improve the project management process for the future. direct changeover wrap-up phased implementation pilot implementation
wrap up
UPS devices typically have capacities that may run up to __________ VA. Question 6 options: 100 250 500 1,000
1000
Effective planning for information security involves: Question 24 options: collecting information about an organization's objectives. collecting information about an organization's information security environment. collecting information about an organization's technical architecture. All of the above
All of the above
The Lewin change model includes __________. unfreezing moving refreezing All of the above
All of the above
Class __________ fires are extinguished by agents that remove oxygen from the fire. A B C D
B
Class __________ fires are safely extinguished with non-conducting agents only. a b c d
C
Computing and other electrical equipment used in areas where water can accumulate must be uniquely grounded using __________ equipment. UPS HVAC GFCI ESD
GFCI
Project managers can reduce resistance to change by involving employees in the project plan. In the systems development parts of a project, this is referred to as __________. Question 30 options: DMZ SDLC WBS JAD
JAD
In the __________ UPS, the internal components of the standby models are replaced with a pair of inverters and converters. line-interactive ferroresonant true online offline
Line interactive
A __________ is usually the best approach to security project implementation direct changeover phased implementation pilot implementation parallel operation
Phased implementation
The __________ level of the bull's-eye model establishes the ground rules for the use of all systems and describes what is appropriate and what is inappropriate; it enables all other information security components to function correctly. Policies Networks Systems Applications
Policies
A(n) __________ is used to justify that the project will be reviewed and verified prior to the development of the project plan. Question 29 options: RFP WBS SDLC CBA
WBS
The __________ methodology has been used by many organizations and requires that issues be addressed from the general to the specific, and that the focus be on systematic solutions instead of individual problems. parallel direct changeover bull's-eye wrap-up
bulls eye
Some cases of __________ are simple, such as requiring employees to begin using a new password on an announced date. Question 16 options: phased implementation direct changeover pilot implementation wrap-up
direct changeover
A __________ system is designed to work in areas where electrical equipment is used. Instead of containing water, the system contains pressurized air. wet-pipe dry-pipe deluge sprinkler
dry pipe
Technology __________ guides how frequently technical systems are updated, and how technical updates are approved and funded. Question 26 options: wrap-up governance turnover changeover
governance
The date for sending the final RFP to vendors is considered a(n) __________, because it signals that all RFP preparation work is complete. intermediate step resource milestone deliverable
milestone
In the __________ process, measured results are compared against expected results. Question 20 options: negative feedback loop wrap-up direct changeover turnover
negative feedback loop
__________ sensors project and detect an infrared beam across an area. Question 5 options: Photoelectric Smoke Air-aspirating Thermal
photoelectric
In a __________ implementation, the entire security system is put in place in a single office, department, or division before expanding to the rest of the organization. loop direct parallel pilot
pilot
By managing the __________, the organization can reduce unintended consequences by having a process to resolve the potential conflict and disruption that uncoordinated change can introduce. conversion process wrap-up process of change governance
process of change
__________ locks can be changed after they are put in service, allowing for combination or key changes without a locksmith and even allowing the owner to change to another access method (key or combination) to upgrade security. Programmable Manual Biometric Electronic
programmable