OPMA 3306 CH. 6 T/F Part 1

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.

F

A make-to-order firm will work with the customer to design the product, and then make it from purchased materials, parts, and components.

F

Break-Even Analysis can only be used in production equipment decision making when dealing solely with fixed costs, no variable costs.

F

Process selection refers to the strategic decision of choosing the volume of output to produce in a manufacturing facility depending upon the way that facility produces.

F

The closer the customer is to the customer order decoupling point the longer it takes the customer to receive the product.

F

The time needed to respond to a customer's order is called the customer response time.

F

Workcenter layouts allocate dissimilar machines into cells to work on products that have dissimilar processing requirements.

F

One trade-off illustrated by the product-process matrix is between flexibility and cost.

T

A general purpose machine is less capable than a special purpose machine in certain tasks but can perform a broader variety of tasks.

T

A project layout is characterized by a high degree of task ordering.

T

A project layout is characterized by a relatively low number of production units in comparison with process and product layout formats.

T

Break-Even Analysis can be used to help decide whether to perform a task with a special purpose machine or with a general purpose machine.

T

Engineer-to-order firms will work with the customer to design the product, and then make it from purchased materials, parts, and components.

T

One difference between an assembly line process flow and a continuous process flow is that on the assembly line the flow is discrete rather than continuous.

T

One methodology used to evaluate equipment investment decisions where the investment entails an initial investment, fixed costs, and variable costs is Break-Even Analysis.

T

Process selection refers to the strategic decision of selecting which kind of production processes to use to produce a product or provide a service

T

The closer the customer is to the customer order decoupling point the more quickly the customer receives the product.

T

The product-process matrix shows the relationship between process structures and product volume and variety characteristics.

T

The term "assembly line" refers to progressive assembly linked by some material handling device.

T

The volume requirements for the product are one determinant of the choice of which process structure to select.

T


संबंधित स्टडी सेट्स

Interpersonal Communication Chapter2

View Set

Operating Systems Final (3, 5, 7, 9, 10)

View Set

Economies and diseconomies of Scale

View Set

14.4 Eukaryotic Pre-mRNA Transcripts are Processed prior to Translation.

View Set