PMI Glossary Terms

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

Business Value

The net quantifiable benefit derived from a business endeavor. The benefit may be tangible, intangible, or both.

Effort

The number of labor units required to complete a scheduled activity or WBS component, often expressed in hours, days, or weeks.

Communication Channels

The number of possible communication paths on a project.

Continuous Improvement (CI)

The ongoing effort to improve products, services, or processes.

Project Manager

The person assigned by the performing organization to lead the team that is responsible for achieving the project goals and objectives.

Risk Owner

The person responsible for monitoring the risk and for selecting and implementing an appropriate risk response strategy.

Work Performance Report

The physical or electronic representation of work performance information compiled in project documents, intended to generate decisions, actions, or awareness.

Release Plan

The plan that sets expectations for the dates, features, and/or outcomes a project expects to deliver over the course of several iterations.

Sustainability

The planning, monitoring, and controlling of project delivery and support processes with consideration to environmental, economic, and social aspects of project-based working to meet the current needs of the stakeholders without compromising future generations.

Servant Leadership

The practice of leading the team by focusing on understanding and addressing the needs and development of team members in order to enable the highest possible team performance.

Continuous Integration

The practice of regularly merging all software code into a shared environment, several times a day, to check code quality and functionality.

Backlog

The prioritized list of all the work, presented in story form, for a project team.

Collect Requirements Process

The process in which requirements documentation is developed. Precedes the Define Scope process.

Manage Stakeholder Engagement Process

The process of communicating and working with stakeholders to meet their needs/expectations, address issues as they occur, and foster app

Funding Limit Reconciliation

The process of comparing the planned expenditure of project funds against any limits on the commitment of funds for the project to identify any variances between the funding limits and the planned expenditures

Manage Project Quality

The process of continually measuring the quality of all activities and taking corrective action until the desired quality is achieved. Quality management lowers the risk of product/service failure or unsatisfied clients.

Manage Communications

The process of creating, collecting, distributing, storing, retrieving, and the ultimate disposition of project information in accordance with the communications management plan defined within the project.

Market Research

The process of evaluating the feasibility of a new product or service, through research conducted directly with potential consumers.

Value Analysis

The process of examining each of the components of business value and understanding the cost of each one. The goal is to cost effectively improve the components to increase the overall business value.

Close Project or Phase Process

The process of finalizing all activities for the project, phase, or contract.

Validate Scope

The process of formalizing acceptance of the completed project deliverables

Make-or-Buy Analysis

The process of gathering and organizing data about product/service requirements and analyzing data against available alternatives including the purchase or internal manufacture of the project.

Release Planning

The process of identifying a high-level plan for releasing or transitioning a product, deliverable, or increment of value to the customer.

Control Procurements Process

The process of managing procurement relationships, monitoring contract performance, making changes and corrections as appropriate, and closing out contracts.

Program Management

The process of managing programs mapped to business objectives that improve organizational performance. Program managers oversee and coordinate the various projects and other strategic initiatives throughout an organization.

Monitor Risks

The process of monitoring the implementation of agreed-upon risk response plans, tracking identified risks, identifying and analyzing new risks, and evaluating risk process effectiveness throughout the project. The key benefit of this process is that it enables project decisions to be based on current information about overall project risk exposure and individual project risks.

Perform Quantitative Risk Analysis

The process of numerically analyzing the effect of identified risks on overall project objectives.

Conduct Procurement Process

The process of obtaining seller responses, selecting a seller, and awarding a contract.

Perform Integrated Change Control

The process of reviewing all change requests, approving changes, and managing changes to deliverables, project documents, and the project management plan. These decisions are communicated to stakeholders.

Decision Making

The process of selecting a course of action from among multiple options.

Manage Project Team

The process of tracking team member performance, providing feedback, resolving issues, and managing team changes to optimize project performance. The key benefit of this process is that it influences team behavior, manages conflict, resolves issues, and appraises team member performance.

Manage Project Knowledge

The process of using existing knowledge and creating new knowledge to achieve project objectives and contribute to organizational learning. The process must include tools that allow converting data into information, and information into knowledge.

Conflict Resolution

The process of working to reach an agreement after a conflict situation arises.

Team Resource Management

The processes necessary to organize, manage, and lead the people on the project team as well as the processes needed to procure and manage physical resources for a project.

Negotiated Settlements

The product or output of negotiation, representing a final, equitable, mutually agreed disposition of all outstanding issues, claims, and disputes.

The prioritized list of all the work, presented in story form, for a project team.

The progressive elaboration of project requirements and/or the ongoing activity in which the team collaboratively reviews, updates, and writes requirements to satisfy the need of the customer request.

Project Calendar

The project calendar specifies the working and non-working days and times for activities.

Relative Authority

The project manager's authority relative to the functional manager's authority over the project and the project team.

Storyboarding

The prototyping method that uses visuals or images to illustrate a process or represent a project outcome. Storyboards are useful to illustrate how a product, service, or application will function or operate when it is complete.

Tolerance

The quantified description of acceptable variation for a quality, risk, budget, or other project requirement

Activity Duration Estimates

The quantitative assessments of the likely number of time periods that are required to complete an activity.

Burn Rate

The rate at which the project consumes financial resources, representing negative cash flow. Burn rates are often used by agile projects to budget costs for planned iterations/sprints/increments.

Benefit Cost Ratio (BCR)

The ratio of the expected benefits and the anticipated costs

Work Performance Data

The raw observations and measurements identified during activities being performed to carry out the project work. They can be recorded in the PMIS and project documents

Work Performance Information

The raw performance data collected from controlling processes, analyzed in comparison with project management plan components, project documents, and other work performance information.

System Development Life Cycle (SDLC)

Typically used with software development projects, SDLC depicts the group of phases which encompass the entire project life cycle from start to finish. How the project is executed is defined by the methodology—waterfall, agile, iterative, incremental, etc.

Cultural Awareness

Understanding the cultural differences of the individuals, groups, and organizations in the project stakeholder community to adapt communication strategies to avoid or reduce miscommunication and misunderstandings.

Sprint

Used in Scrum. A short time interval during which a usable and potentially releasable increment of the product is created.

Early Finish

Used in a networking diagram, this represents the earliest date that the activity can finish.

Early Start

Used in a networking diagram, this represents the earliest date that the activity can start

Story Points

Used in agile practice to estimate the amount of time it will take to complete a story item from the project backlog

Influence Diagram

Used in quality management decisions. A graphical representation of situations showing causal influences, time ordering of events, and other relationships among variables and outcomes.

Influence/Impact Grid

Used in stakeholder management. A classification model that groups stakeholders on the basis of their involvement in and impact on the project.

What-If Scenario

Used in the Develop Schedule process, this technique evaluates different scenarios to predict their effects-both positive and negative-on the project objectives.

Slack

Used in the critical path method. Amount of time that a task can be delayed without affecting the deadlines of other subsequent tasks.

Variability Control Charts

Used to analyze and communicate the variability of a process or project activity over time

Work Authorization System

Used to ensure that work gets performed at the right time, in the right sequence, and with the right resources. This can be formal or informal.

Task Board

Used to visualize the work and enable the team and stakeholders to track their progress as work is performed during an iteration. Examples of task boards include Kanban boards, to-do lists, procedure checklists, and Scrum boards.

Opportunity Cost

A concept applied to quantify the missed opportunity when deciding to use a resource (e.g., investment dollars) for one purpose versus another. Alternately opportunity cost is the loss of potential future return from the second-best unselected project. In other words, it is the opportunity (potential return) that will not be realized when one project is selected over another.

Preventative Action

A concept in quality management that indicates that quality cannot be inspected into a product but should be planned for from the start to avoid problems.

Service-Level Agreement (SLA)

A contract between a service provider (either internal or external) and the end user that defines the level of service expected from the service provider.

Vendor Bid Analysis

A cost estimation technique used to understand what a product/service should cost.

Indirect Costs

A cost usually tracked as part of a contract, that is not expended directly for the project's benefit.

Lean Six Sigma

A collaborative team method that provides an enhanced ability to target customer needs and measure performance during project execution and monitoring. It was introduced by American engineer Bill Smith while working at Motorola in 1986

Crystal Family of Methodologies

A collection of lightweight agile software development methods focused on adaptability to a particular circumstance.

Project Phase

A collection of logically related project activities that culminates in the completion of one or more deliverables. A phase has a set of goals and objectives, and the attainment of these goals/objectives triggers a milestone.

DevOps

A collection of practices for creating a smooth flow of delivery by improving collaboration between development and operations staff.

Configuration Management System

A collection of procedures used to track project artifacts and monitor and control changes to these artifacts

XP Metaphor

A common Extreme Programming (XP) technique that describes a common vision of how a program works.

Active Listening

A communication technique that involves acknowledging the speaker's message and the recipient clarifying the message to confirm that what was heard matches the message that the sender intended.

Cost Management Plan

A component of a project or program management plan that describes how costs will be planned, structured, and controlled.

Configuration Management Plan

A component of the project management plan that describes how to identify and account for project artifacts under configuration control and how to record and report changes to them

Change Management Plan

A component of the project management plan that establishes the Change Control Board, documents the extent of its authority, and describes how the change control system will be implemented.

Stakeholder Engagement Plan

A component of the project management plan that identifies the strategies and actions required to promote productive involvement of stakeholders in project or program decision-making and execution. Used to understand stakeholder communication requirements and the level of stakeholder engagement in order to assess and adapt to the level of stakeholder participation in requirements activities.

Process Improvement Plan

A component of the project management plan, this document describes the processes used in the production of the project's deliverables, how they will be monitored, and under what conditions they may be changed.

Procurement Management Plan

A component of the project or program management plan that describes how a project team will acquire goods and services from outside the executing organization.

Quality Management Plan

A component of the project or program management plan that describes how applicable policies, procedures, and guidelines will be implemented to achieve the quality objectives.

Requirements Management Plan

A component of the project or program management plan that describes how requirements will be analyzed, documented, and managed.

Scope Management Plan

A component of the project or program management plan that describes how the scope will be defined, developed, monitored, controlled, and validated.

Schedule Management Plan

A component of the project or program management plan that establishes the criteria and the activities for developing, monitoring, and controlling the schedule.

Risk Management Plan

A component of the project, program, or portfolio management plan that describes how risk management activities will be structured and performed.

Communications Management Plan

A component of the project, program, or portfolio management plan that describes how, when, and by whom information about the project will be administered and disseminated

Team Management Plan

A component of the resource management plan that describes when and how team members will be acquired and how long they will be needed.

Change Management

A comprehensive, cyclic, and structured approach for transitioning individuals, groups, and organizations from a current state to a future state in which they realize desired benefits. It is different from project change control, which is a process whereby modifications to documents, deliverables, or baselines associated with the project are identified and documented, and then are approved or rejected.

Cost-Benefit Analysis

A cost-benefit analysis allows project managers to compare if the benefits of an action outweigh the costs or, conversely, if the costs outweigh the benefits. This can be an important criterion in decision making.

Self-Organizing Team

A cross-functional team in which people fluidly assume leadership as needed to achieve the team's objectives. See also "cross-functional team."

Issue

A current condition or situation that may have an impact on the project objectives

Design of Experiments (DoE)

A data analysis technique to determine the optimal condition; typically used with multiple variables.

Quality Metric

A description of a project or product attribute and how to measure it.

Requirements Documentation

A description of how individual requirements meet the business need for the project

Communication Models

A description, analogy, or schematic used to represent how the communication process will be performed for the project.

Sprint Velocity

A descriptive metric used by agile and hybrid teams. It describes the volume of work that a team performs during a sprint. Use this metric to understand the rate of your team's work during an average sprint.

Mind Mapping

A graphical technique used to consolidate ideas created through individual brainstorming sessions into a single map - image/display is used to reflect commonality and differences in understanding and to generate new ideas.

Probability and Impact Matrix

A grid for mapping the probability of occurrence of each risk and its impact on project objectives if that risk occurs.

Requirements Traceability Matrix

A grid that links product requirements from their origin to the deliverables that satisfy them.

Responsibility Assignment Matrix (RAM)

A grid that shows the project resources assigned to each work package.

SWOT Analysis

A grid used to assess the strengths, weaknesses, opportunities, and threats of an organization, project, or option.

Dictatorship

A group decision technique in which one person makes the decision for the entire group.

Majority

A group decision-making method in which a course of action is agreed upon by a predefined quorum.

Autocratic

A group decision-making method in which one member of the group makes the decision. In most cases, this person will consider the larger group's ideas and decisions and will then make a decision based on that input.

Virtual Team

A group of people with a shared goal who fulfill their roles with little or no time spent meeting face-to-face.

Risk Category

A group of potential causes of risk

Feature

A group of stories that delivers value to the customer.

Growth Mindset

A growth mindset, as conceived by Stanford psychologist Carol Dweck and colleagues, is the belief that a person's capacities and talents can be improved over time.

Work Breakdown Structure (WBS)

A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables.

Risk Breakdown Structure

A hierarchical representation of potential sources of risk.

Risk Breakdown Structure (RBS)

A hierarchical representation of potential sources of risk.

Resource Breakdown Structure

A hierarchical representation of resources by category and type.

Strategic Plan

A high-level business document that explains an organization's vision and mission plus the approach that will be adopted to achieve this mission and vision, including the specific goals and objectives to be achieved during the period covered by the document.

Product Roadmap

A high-level visual summary of the product or products of the project that includes goals, milestones, and potential deliverables.

Pareto Chart

A histogram that is used to rank causes of problems in a hierarchical format. See also "80/20 Rule".

Contract

A mutually binding agreement that obligates the seller to provide the specified project or service or result and obligates the buyer to pay for it.

Wireframe

A non-functional interface design (not written in code) that shows the key elements and how they would interact to give the user an idea of how the system would function.

Estimate

A number, figure, or representation that denotes cost or time

Code of Accounts

A numbering system used to uniquely identify each component of the WBS.

Implement Risk Response Process

A part of the Executing Process Group, this is the process of implementing agreed-upon risk response plans. The key benefit of this process is that it ensures that agreed-upon risk responses are executed as planned to address overall project risk exposure, minimize individual project threats, and maximize individual project opportunities. This process is performed throughout the project.

Special Interval

A period during a project when normal work may be suspended for some or all team members

Agile Practitioner

A person embracing the agile mindset who collaborates with like-minded colleagues in cross- functional teams. Also referred to as an agilist.

Project Sponsor

A person or group who provides resources and support for the project, program, or portfolio and is accountable for enabling success.

Estimate Activity Durations Process

A planning process that determines the estimate time needed to complete a work package and/or activity

Develop Project Management Plan Process

A planning process which is a guide on how the project will be managed. It is composed of 19 components.

Create WBS Process

A planning processes that involves creating the work-break-down (WBS) structure, along with the WBS dictionary. This process produces the schedule baseline, which consists of the WBS, WBS dictionary and the scope statement. The scope statement is produced from the Define Scope process.

Buffer

A planning term related to contingency.

Phase Gate

A point review at the end of a phase in which a decision is made to continue to the next phase, to continue with modification, or to end a project or program.

Threshold

A predetermined value of a measurable project variable that represents a limit that requires action to be taken if it is reached.

Diagramming Techniques

Various means of depicting a system or virtual concept such as a business or process flow that indicate entities, relationships, and interactions.

Work in Progress (WIP)

Work that has been started but not yet completed.

Quality Function Deployment (QFD)

Workshops that are commonly used in the manufacturing field to determine new product development requirements.

Questionnaires

Written sets of questions designed to quickly gather information from many respondents.

Moscow Analysis

A prioritization technique used in management, business analysis, project management, and software development to reach a common understanding with stakeholders on the importance they place on the delivery of each requirement; it is also known as MoSCoW prioritization or MoSCoW analysis.

Agile Release Planning

A process in which a team determines the number of iterations or Sprints that are needed to complete each release, the features that each iteration will contain, and the target dates of each release.

Agile Coach

A process role on a project team that helps organizations achieve true agility by coaching teams across the enterprise on how to apply agile practices and choose their best way of working

Assumption and Constraint Analysis

A process that explores the validity of the project assumptions within the constraints and identifies risks from any incompleteness or inaccuracy of these project assumptions.

Statistical Sampling Process

A process that involves dividing sampling data into two categories—attribute and variable— each of which is gathered according to sampling plans. As corrective actions are taken in response to analysis of statistical sampling and other quality control activities, and as trend analysis is performed, defects and process variability should be reduced.

Perform Qualitative Risk Analysis

A process used to identify individual risks by looking at how likely they are to happen (probability of occurrence) and how bad they would be for the project if they did happen (impact).

Output

A product, result, or service generated by a process. May be an input to a successor process

Project Coordinator

A project coordinator handles administrative tasks for the project manager and team members to manage a project effectively and efficiently. Tasks may include procuring project resources such as equipment and supplies, managing deadlines, workflow, and scheduling project meetings and other appointments on behalf of the project team.

Stakeholder Register

A project document including the identification, assessment, and classification of project stakeholders.

Quality Report

A project document that includes quality management issues, recommendations for corrective actions, and a summary of findings from quality control activities and may include recommendations for process, project, and product improvements.

Lessons Learned Register

A project document used to record knowledge gained during a project. The knowledge attained can be used in the current project and entered into the lessons learned repository for subsequent use.

Insurable Risk

A risk that has only the potential for loss and no potential for profit or gain. An insurable risk is one for which insurance may be purchased to reduce or offset the possible loss. Types of insurable risks are direct property, indirect property, liability, and personnel related.

Threat

A risk that would have a negative effect on one or more project objectives.

Opportunity

A risk that, if developed, could create a positive effect on one or more project objectives.

Fast Tracking

A schedule compression technique in which activities or phases normally done in sequence are performed in parallel for at least a portion of their duration.

Product Life Cycle

A series of phases that represent the evolution of a product, from concept through delivery, growth, maturity, and to retirement.

Key Performance Indicator (KPI)

A set metric used to evaluate a project, an organizational unit, or a project team's performance against the project vision and objectives. KPI can be time bound.

Source Selection Criteria

A set of attributes, desired by the buyer, which a seller is required to meet or exceed to be selected for a contract.

Acceptance Criteria

A set of conditions that is required to be met before deliverables are accepted.

Project Team

A set of individuals performing the work of the project to achieve its objectives

Checklist

A set of procedural instructions used to ensure that a product or component quality is achieved

Change Control System

A set of procedures that describes how modifications to the project deliverables and documentation are managed and controlled

Design for X (DfX)

A set of technical guidelines that may be applied during the design of a product for the optimization of a specific aspect of the design. DfX can control or even improve the product's final characteristics.

Daily Standup

A short, 15-minute meeting in which the complete team gets together for a quick status update while standing in a circle.

Charter

A shortened name for the project charter. A formal document that starts the project. Typically used by the project sponsor and the project manager, this document provides the reason for the project (based on business case) and may include high-level requirements, assumptions, constraints, milestone(s), and preliminary budget.

Analogous Estimating

A technique for estimating the duration or cost of an activity on a project using historical data from a similar activity or project.

Checklist Analysis

A technique for systematically reviewing materials using a list for accuracy and completeness.

Resource Optimization Techniques

A technique in which activity start and finish dates are adjusted to balance demand for resources with the available supply.

Critical Path Method (CPM)

A technique of schedule analysis in which the schedule activities are evaluated to determine the float or slack for each activity and the overall schedule. To calculate critical path, use the forward and backward pass along with float analysis to identify all network paths, including critical.

Stakeholder Analysis

A technique of systematically gathering and analyzing quantitative and qualitative information to determine whose interests should be considered throughout the project.

Affinity Diagram

A technique that allows large numbers of ideas to be classified into groups for review and analysis.

Nominal Group Technique

A technique that enhances brainstorming with a voting process used to rank the most useful ideas for further brainstorming or for prioritization.

Risk Workshop

A technique that uses a special meeting conducted for the purpose of identifying project risks. In addition to the project team members, this workshop might also include the project sponsor, SMEs, customer representatives, and other stakeholders, depending on the size of the project.

Multi-Criteria Decision Analysis

A technique that utilizes a decision matrix to provide a systematic, analytical approach for establishing criteria, such as risk levels, uncertainty, and valuation, to evaluate and rank many ideas.

Communication Styles Assessment

A technique to identify the preferred communication method, format, and content for stakeholders for planned communication activities.

Scrum of Scrums (SoS)

A technique to operate Scrum at scale for several teams working on the same product, coordinating discussions of progress on their interdependencies, and focusing on how to integrate the delivery of software, especially in areas of overlap.

Decomposition

A technique used for dividing and subdividing the project scope and project deliverables into smaller, more manageable parts.

Precedence Diagramming Method (PDM

A technique used to create the network diagram. It constructs a schedule model in which activities are represented by nodes and are graphically linked by one or more logical relationships to show the sequence in which the activities are to be performed

Qualitative Risk Analysis

A technique used to determine the probability of occurrence and the impact of identified risk.

Three-Point Estimating

A technique used to estimate cost or duration by applying an average or weighted average of optimistic, pessimistic, and most likely estimates when there is uncertainty with the individual activity estimates. Also called "triangular estimating".

Product Box Exercise

A technique used to explain a desired solution or outcome. Stakeholders try to describe aspects of a solution in the same way a marketer might describe product features and benefits on a box.

Document Analysis

A technique used to gain project requirements from current document valuation.

Request for Information (RFI)

A type of procurement document whereby the buyer requests a potential seller to provide various pieces of information related to a product or service or seller capability.

Adaptive

A type of project life cycle or methodology that values responding to change over following a set plan. Adaptive methodologies seek solutions that deliver maximum value to the customer.

Context Diagram

A visual depiction of the product scope showing a business system (process, equipment, computer system, etc.), and how people and other systems (actors) interact with it

Story Map

A visual model of all the features and functionality desired for a given product, created to give the team a holistic view of what they are building and why

Kanban Board

A visualization tool that enables improvements to the flow of work by making bottlenecks and work quantities visible. It is a popular framework used to implement agile and DevOps software development. Also referred to as a signboard.

Effect-Based Risk Classification

A way of analyzing the major risks inherent to a project that could have an impact on its success. These major risks include time, cost, quality, and scope.

Data Representation

A way of depicting data visually to aid in its communication/comprehension to various audiences.

Information Management System

A way to collect, manage, and distribute project information.

Duration

Amount of time needed to complete an activity/task or work package.

DEEP

An acronym used in agile projects that describes desirable attributes of a product backlog. Stands for: Detailed, Estimable, Emergent and Prioritize.

Training

An activity in which team members acquire new or enhanced skills, knowledge, or attitudes.

Task

An activity to be accomplished with a specific purpose within a defined period of time. See also

Incremental Life Cycle

An adaptive project life cycle in which the deliverable is produced through a series of iterations that successively add functionality within a predetermined time frame. The deliverable contains the necessary and sufficient capability to be considered complete only after the final iteration.

Risk Exposure

An aggregate measure of the potential impact of all risks at any given point in time in a project, program, or portfolio.

Scrum

An agile framework for developing and sustaining complex products, with specific roles, events, and artifacts.

Lean

An agile method used primarily in manufacturing that focuses on achieving outcomes with little or no waste

Coach

An agile servant leader role that exists to help the team and identify and remove any impediments (obstacles).

Spike

An agile term emerging from Extreme Programming (XP). Refers to timeboxed work for the purpose of answering a question or gathering information, rather than producing a viable product.

Fixed Price Contract

An agreement that sets the fee that will be paid for a defined scope of work regardless of the cost or effort to deliver it.

User Story

An informal, general explanation of a product, service, or software feature written from the perspective of the end user. Its purpose is to articulate how the feature will provide value to the customer. See also "Story".

Project Management Information System (PMIS)

An information system consisting of the tools and techniques used to gather, integrate, and disseminate the outputs of project management processes.

Issue Log

An issue is a current condition or situation that may have an impact on the project objectives. An issue log is used to record and monitor information on active issues. Issues are assigned to a responsible party for follow up and resolution.

Claim

An issue with the contract brought by one party against another. Claims must be resolved before the contract can be properly closed out.

Rolling Wave Planning

An iterative planning technique in which the work to be accomplished in the near term is planned in detail, while the work in the future is planned at a higher level.

Impediment

An obstacle that prevents the team from achieving its objectives.

Work Shadowing

An on-the-job technique that enables someone to learn about and perform a job while observing and working with another, more experienced person.

Compromise

An option in conflict management in which both parties give up something to reach an agreement

Value Stream

An organizational construct that focuses on the flow of value to customers through the delivery of specific products or services.

Colocation

An organizational placement strategy in which the project team members are physically located close to one another to improve communication, working relationships, and productivity

Functional Organization

An organizational structure in which staff is grouped by areas of specialization and the project manager has limited authority to assign work and apply resources.

Matrix Organization

An organizational structure in which the project manager shares responsibility with the functional managers for assigning priorities and for directing the work of individuals assigned to the project.

Engagement Roadmap

Another name for "stakeholder engagement roadmap" - a guideline based on the stakeholder analysis that sets forth processes for engaging with stakeholders at current and all future states of the project.

Generalizing Specialist

Refers to a project team member who has a particular area of deep expertise but also has experience in many other areas that may not be directly related to their core area. These team member types are valued on agile projects because of their ability to be interchangeable.

Inspection

Reviewing the functionality or suitability of a product, service, or result against the plan (requirements/story).

Project Expeditor

Role or position on a project team that works as an assistant and coordinates communications on behalf of the team. Individuals performing in this role cannot make or enforce decisions but can communicate with the contractors or suppliers of project resources to ensure the timely delivery of materials.

Close-Out Meetings

Sessions held at the end of a project or phase during which teams discuss work and capture lessons learned.

Interpersonal Skills

Skills used to establish and maintain relationships with other people or stakeholders.

Input

Something needed or used by a process to create the process output.

Penalty Power

The ability to gain support because project personnel perceive the project manager as capable of directly or indirectly dispensing penalties that they wish to avoid. Penalty power usually derives from the same sources as reward power, with one being a necessary condition for the other.

Leadership

The ability to guide others to achieve results. Leadership abilities are gained through experience, building relationships, and taking on initiatives.

Emotional Intelligence (EI)

The ability to identify, assess, and manage the personal emotions of oneself and other people, as well as the collective emotions of groups of people. EQ (emotional quotient) is also a commonly used abbreviation.

Political Awareness

The ability to recognize the power structure internal to the organization, and the ability to navigate the relationships

Procurement

The acquisition of goods and services from an external organization, vendor, or supplier to enable the deliverables of the project.

Leading

The act of establishing direction, aligning the team to a vision, and inspiring/motivating them to achieve a project's objectives.

Coaching

The act of giving guidance and direction to another person to facilitate personal and/or professional growth and development.

Influencing

The act of presenting a good case to explain why an idea, decision, or problem should be handled a certain way, without resistance from other individuals.

Data Analysis

The act of scrutinizing facts and numbers for typical purposes of decision-making, verification, validation, or assessment.

Escalate

The act of seeking helpful intervention in response to a threat that is outside the scope of the project or beyond the project manager's authority.

Collaboration

The act of working together and sharing information to create deliverables, work products or results

Elapsed Time

The actual calendar time required for an activity from start to finish.

Cost Variance (CV)

The amount of budget deficit or surplus at a given point in time, expressed as the difference between the earned value and the actual cost.

Total Float

The amount of time that a schedule activity can be delayed or extended from its early start date without delaying the project finish date or violating a schedule constraint.

Free Float

The amount of time that a scheduled activity can be delayed without impacting the early start date of any subsequent scheduled activity

Negative Float

The amount of time that must be saved to bring the project to completion on time.

Lead

The amount of time whereby a successor activity can be advanced with respect to predecessor activity

Program Management

The application of knowledge, skills, and principles to a program to achieve program objectives and obtain benefits and control not available by management of program components individually.

Project Management

The application of knowledge, skills, tools, and techniques to project activities to fulfill the project plan.

Conflict Management

The application of one or more strategies for dealing with disagreements that may be detrimental to team performance.

Tool

The applied function, action, procedure, or routine defined for a process to produce the desired output

Planned Value (PV)

The approved value of the work to be completed for a specific period of time

Schedule Baseline

The approved version of a schedule model that can be changed using formal change control procedures and is used as the basis of comparison to actual results. It is one of the main project documents that should be created before the project starts.

Scope Baseline

The approved version of a scope statement, Work Breakdown Structure (WBS) and its associated WBS dictionary can be changed using formal change control procedures and is used as a basis for comparison to actual results.

Cost Baseline

The approved version of the time-phased project budget, excluding any management reserves, which can be changed only through formal change control procedures and is used as a basis for comparison to actual results.

Validation

The assurance that a product, service, or result meets the needs of the customer and other identified stakeholders.

Legitimate Power

The authority granted to an individual due to his/her position within a group or an organization.

Quality Policy

The basic principles that should govern the organization's actions as it implements its system for quality management.

Portfolio Managemen

The centralized management of one or more portfolios to achieve strategic objectives

Scrum Master

The coach of the development team and process owner in the Scrum framework. Removes obstacles, facilitates productive events, and protects the team from disruptions.

Value Delivery System

The combined and systematic effort by leadership, portfolio, and program and project management to create value in and for an organization.

Benchmarking

The comparison of actual or planned products, processes, and practices to those of comparable organizations to identify best practices, generate ideas for improvement, and provide a basis for measuring performance.

Present Value (PV)

The current value of a future sum of money or stream of cash flows given a specific rate of return.

Risk Appetite

The degree of uncertainty an organization or individual is willing to accept in anticipation of a reward.

Quality

The degree to which a set of inherent characteristics fulfills requirements

Project Scope Statement

The description of the project scope, major deliverables, assumptions, and constraints.

Net Present Value (NPV)

The difference between the present value of cash inflows and the present value of cash outflows over a period of time. NPV is used in capital budgeting and investment planning to analyze the financial viability of a projected investment or project.

Project Management Plan

The document that describes how the project will be executed, monitored and controlled, and closed.

Benefits Management Plan

The documented explanation defining the processes for creating, maximizing, and sustaining the benefits provided by a project or program. It also describes how and when the benefits of a project will be derived and measured. Both the business case and the benefits management plan are developed with the benefits owner prior to the project being initiated. Additionally, both documents are referenced after the project has been completed. Therefore, they are considered business documents rather than project documents or components of the project management plan.

Paralingual Communications

The effect of pitch, tone, and inflections in the sender's voice on the message being sent. For example, facial expressions, hand gestures, and body language contribute to the message.

To Complete Performance Index (TCPI)

The estimate of the future cost performance that may be needed to complete the project within the approved budget

Verification

The evaluation of whether a product, service, or result complies with a regulation, requirement, specification, or imposed condition.

Managing

The exercise of executive control or authority

Estimate to Complete (ETC)

The expected cost of finishing all the remaining project work.

Estimate at Completion (EAC)

The expected total cost of completing all work expressed as the sum of the actual cost to date and the estimate to complete.

Breach of Contract

The failure to meet some or all the obligations of a contract

Project Scope

The features, functions, and works that characterize the delivery of a product, service, and/or result.

Project Governance

The framework, functions, and processes that guide project management activities to create a unique product, service, or result to meet organizational, strategic, and operational goals.

Product Scope

The functions and features that characterize a product or a service.

Information Radiator

The generic term for visual displays placed in a visible location so everyone can quickly see the latest information. Also known as "Big Visible Chart" in agile.

Customer

The individual or organization that will accept the deliverable(s) or product. Customers can be internal organizational groups or external to an organization.

Business Risk

The inherent risk in any business endeavor that carries the potential for either profit or loss. Types of business risks are competitive, legislative, monetary, and operational.

Motivation

The inner drive or external encouragement that keeps people involved and wanting to complete work of high quality in a timely fashion.

Product Management

The integration of people, data, processes, and business systems to create, maintain, and evolve a product or service throughout its life cycle.

Internal Rate of Return (IRR)

The interest rate that makes the net present value of all cash flow equal to zero. This rate is a function of the cost of capital for project implementation.

Payback Period

The interval required to amass (via profit or value) the initial investment made for a project.

Progressive Elaboration

The iterative process of increasing the level of detail in a project management plan as greater amounts of information and more accurate estimates become available.

Lessons Learned

The knowledge gained during a project which shows how project events were addressed or should be addressed in the future for the purpose of improving performance.

Late Finish

The latest date an activity can finish, without delaying the finish of the project

Late Start

The latest that a project activity can start without having to reschedule the calculated early finish of the project.

Risk Threshold

The level of risk exposure above which risks are addressed and below which risks may be accepted.

Risk Probability

The likelihood that a risk event will occur or prove true during the project.

Risk Impact

The likely effect on project objectives if a risk event occurs.

Project Funding

The means by which the money required to undertake a project, program or portfolio is secured and then made available as required.

Bidder Conferences

The meetings with prospective sellers prior to the preparation of a bid or proposal to ensure all prospective vendors have a clear and common understanding of the procurement. Also called vendor conferences, pre-bid conferences, or contractor conferences.

Tailoring

The mindful selection and adjustment of multiple factors. Determining the appropriate combination of processes, inputs, tools, techniques, outputs, and life cycle phases to manage a project.

Cost of Non-Conformance

The money spent after a project is complete because of failures. This includes internal and external failure costs.

Cost of Conformance

The money spent during a project to avoid failures. This includes prevention costs that build a quality product and appraisal costs that assess the quality.

Burndown Chart

A graphical representation of the work remaining versus the time left in a timebox

Recognition

A more personalized, intangible, and experiential event that focuses on behavior rather than outcome

Definition of Done (DoD)

A team's checklist of all the criteria required to be met so that a deliverable can be considered ready for customer use.

Variance Analysis

A technique for determining the cause and degree of difference between the baseline and the actual performance.

Directions of Influence

A classification model that groups stakeholders based on how they influence the project and/or the project team: upwards (senior management); downwards (team or specialists); outwards (external); sidewards (project manager's peers).

Power/Interest Grid

A classification model that groups stakeholders on the basis of their levels of authority and interest in the project

Power/Influence Grid

A classification model that groups stakeholders on the basis of their levels of authority and involvement in the project.

Agile Principles

1. Customer satisfaction by early and continuous delivery of valuable software 2. Welcome changing requirements, even in late development 3. Deliver working software frequently (weeks rather than months) 4. Close, daily cooperation between business and technical people 5. Projects are built around motivated individuals, who should be trusted 6. Face-to-face conversation is the best form of communication (colocation) 7. Working software is the primary measure of progress 8. Sustainable development, able to maintain a constant pace 9. Continuous attention to technical excellence and good design 10. Simplicity is essential 11. Best architectures, requirements, and designs emerge from self-organizing teams 12. Regularly, the team reflects on how to become more effective, and adjusts accordingly

Value Stream Mapping

A Lean enterprise technique used to document, analyze, and improve the flow of information or materials required to produce a product or service for a customer.

Direct and Manage Project Work Process

A Monitoring and Controlling process that reviews the entire project and analyzes what is planned vs. actual (with schedule forecast and cost forecast as an input) to determine the overall project status.

Product Backlog

A Scrum term. A prioritized list of customer requirements that will improve a product/service. This list represents the single source for work.

Planning package

A WBS component below the control account with known work content but without detailed schedule activities.

Gantt Chart

A bar chart of schedule information on which activities are listed on the vertical axis, dates are shown on the horizontal axis, and the activity durations are shown as horizontal bars placed according to start and finish dates

Resource Histogram

A bar chart that represents when a resource will be needed in the project.

Histogram

A bar or column chart that graphically represents numerical data—for example, the number of defects per deliverable, a ranking of the cause of defects, the number of times each process is noncompliant, or other representations of project or product defects

Epic

A block of work with one common objective, such as a feature, customer request or business requirement. A helpful way to organize work and create a hierarchy, epic helps teams break their work down, while continuing to work towards a bigger goal.

Knowledge Management

A business area dedicated to connecting individuals to shared knowledge and general collaboration on project work. The modality used for connection can be face-to-face and/or virtual.

Resource Calendar

A calendar that identifies the working days and shifts for which each specific resource is available.

Cost Plus Award Fee (CPAF) contract

A category of contract that involves payments to the seller for all legitimate actual costs incurred for completed work, plus an award fee representing seller profit.

Lessons Learned Repository

A central store of historical lessons learned information from various projects across jurisdictions.

Complexity

A characteristic of a program, project, or its environment, which is difficult to manage due to human behavior, system behavior, or ambiguity.

Prompt List

A checklist for a specific category of risk. This tool is a simple series of broad risks, for example environmental or legal, rather than specific risks, such as flooding or regulatory changes. The idea is to push (prompt) the team to think and brainstorm the risks in groups and eventually prioritize the same.

Salience Model

A classification model that groups stakeholders according to level of authority, immediate needs, and how appropriate their involvement is in terms of the project

Sprint Planning

A collaborative event in Scrum in which the Scrum team plans the work for the current sprint.

Organizational Chart

A diagram that shows the structure of an organization and the relationships and relative ranks of its parts and positions/jobs. It is typically a diagram that visually conveys a company's internal structure by detailing the roles, responsibilities, and relationships between individuals within an entity

Decision Tree Analysis

A diagramming and calculation technique for evaluating the implications of a chain of multiple options in the presence of uncertainty.

Activity

A distinct portion of work, scheduled with a beginning and an end, that must be performed to complete work on the project. Also known as a schedule activity. See also "Task".

Standard

A document established by an authority, custom or general consent as a model or example.

Project Charter

A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities.

WBS Dictionary

A document that provides detailed deliverable, activity, and scheduling information about each component in the work breakdown structure (WBS).

Team Charter

A document that records the team values, agreements, and operating guidelines as well as establishes clear expectations regarding acceptable behavior by project team members.

Statement of Work (SoW)

A document used to describe project work. The SoW identifies requirements, deliverables, scope, project details, and timelines for delivery.

Change Control Form

A document used to request a project change. They can also be recommendations for taking corrective or preventive actions

Business Case

A documented economic feasibility study used to establish the validity of the benefits of a selected component lacking sufficient definition and that is used as a basis for the authorization of further project management activities.

Activity List

A documented tabulation of schedule activities that shows the activity description, activity identifier, and a sufficiently detailed scope-of-work description so project team members understand what work is to be performed.

Cost-Benefit Analysis

A financial analysis method used to determine the benefits provided by a project against its costs.

Return on Investment (ROI)

A financial metric of profitability that measures the gain or loss from an investment relative to the amount of money invested.

Timebox

A fixed period of time to provide duration limits for an activity, a piece of work, or a meeting—for example, 1 week, 2 weeks, 3 weeks, or 1 month.

Fixed Price with Economic Price Adjustment (FPEPA) contract

A fixed-price contract, but with a special provision allowing for pre-defined final adjustments to the contract price due to changed conditions, such as inflation changes, or cost increases (or decreases) for specific commodities.

Delphi Technique

A form of gathering expert opinions in which members of a group are asked or polled anonymously.

Interview

A formal or informal approach to elicit information from stakeholders by talking with them directly.

Reports

A formal record or summary of information.

Reward and Recognition Plan

A formalized way to reinforce performance or behavior

Change Control Board (CCB)

A formally chartered group responsible for reviewing, evaluating, approving, delaying, or rejecting changes to the project and for recording and communicating such decisions.

Variance at Completion (VAC)

A formula that measures a project's actual cost, compared with the budgeted amount. It is the difference from the budget at completion (BAC) and the estimate at completion (EAC). The formula is VAC = BAC - EAC.

Increment

A functional, tested, and accepted deliverable that is a subset of the overall project outcome.

80/20 Rule

A general guideline with many applications; in terms of controlling processes, it contends that a relatively large number of problems or defects, typically 80%, are commonly due to a relatively small number of causes, typically 20%. See also "Pareto Chart"

Network Diagram

A graph that shows the activities, duration, and interdependencies of tasks within a project.

Control Charts

A graphic display of process data over time and against established control limits, which has a centerline that assists in detecting a trend of plotted values toward either control limit. These charts are often associated with control limits, specification limits, means, and standard deviation. Control charts are used to analyze and communicate the variability of a process or project activity over time

Bar Chart

A graphic display of schedule-related information. In the typical bar chart, schedule activities or WBS components are listed down the left side of the chart, dates are shown across the top, and activity durations are shown as date-placed horizontal bars

Activity on Arrow or Activity on Node

A graphical diagram on which schedule activities are represented by nodes (rectangle boxes) and their dependencies are depicted by arrows.

Milestone Charts

A graphical representation of milestones. A type of project schedule bar chart that only includes milestone or major deliverables and their corresponding points in time.

Project Schedule Network Diagram

A graphical representation of the logical relationships among the project schedule activities. An output of a schedule model that presents linked activities with planned dates, durations, milestones, and resources.

Burnup Chart

A graphical representation of the work completed toward the release of a product.

McClelland's Three Needs Theory

A human motivation theory which states that every person has one of three main driving motivators: the needs for achievement, affiliation, or power. Those with a strong need for affiliation don't like to stand out or take risk, and they value relationships above anything else.

Throughput

A key agile metric used to determine how many finished work items a process produces over a given time frame

SAFe® (Scaled Agile Framework)

A knowledge base of integrated patterns for enterprise-scale lean-agile development. A framework that implements Scrum at an enterprise level.

Teaming Agreement

A legal contractual agreement between two or more parties to form a joint venture or any other arrangement as defined by the parties to meet the requirements of a business opportunity. The parties can be internal or external to the organization executing the project.

Cease and Desist Letter

A legal document sent to an individual or a business with the direct intention of stopping specific activities and preventing their occurrence or recurrence

Waiver

A legally binding provision in which one party in a contract agrees to forfeit a claim without the other party becoming liable, even inadvertently.

Assumption Log

A list of all uncertainties that are treated as true for the purpose of planning.

Sprint Backlog

A list of work items identified by the Scrum team to be completed during the Scrum sprint

Change Log

A living list of all project change requests (CR). This log is used to track and provide accurate status of each CR

Precedence Relationship

A logical dependency used in the precedence diagramming methods

Start-to-Finish (SF)

A logical relationship in which a predecessor activity cannot finish until a successor activity has started.

Finish-to-Finish (FF)

A logical relationship in which a successor activity cannot finish until a predecessor activity has finished.

Finish-to-Start (FS)

A logical relationship in which a successor activity cannot start until a predecessor activity has finished.

Start-to-Start (SS)

A logical relationship in which a successor activity cannot start until a predecessor activity has started.

Activity Dependency

A logical relationship that exists between two project activities. The relationship indicates whether the start of an activity is contingent upon an event or input from outside the activity

Kaizen

A management concept adapted by the project management community which refers to project activities that continuously improve all project processes. It usually involves all stakeholders. The concept originated in Japan and generally involves "change for the better" or "continuous improvement"

Control Account

A management control point at which scope, budget, actual cost, and schedule are integrated and compared to earned value for performance measurement.

Project Management Office (PMO)

A management structure that standardizes the project-related governance processes and facilitates the sharing of resources, methodologies, tools, and techniques. PMOs are more common in larger organizations because of the number of projects that can be in process at the same time.

A/B Testing

A marketing approach used to determine user preferences by showing different sets of users' similar services—an 'Alpha' and a 'Beta' version—with one independent variable.

Fibonacci Sequence

A mathematical sequence in which the value of each number is derived from the sum of the two preceding numbers. Used in agile estimating or relative estimating techniques, such as planning poker. 0,1,1,2,3,5,8,13,21,34,55,89,144... Simplified sequence: 0,1,2,35,8,13,20,40,100.

Stakeholder Engagement Assessment Matrix

A matrix that compares current and desired stakeholder engagement levels.

Requirement

A measurable condition or capability that must be present in a product, service, or result to satisfy a business need.

Velocity

A measure of a team's productivity rate at which the deliverables are produced, validated, and accepted within a predefined interval.

Schedule Performance Index (SPI)

A measure of schedule efficiency, expressed as the ratio of earned value to planned value

Schedule Variance (SV)

A measure of schedule performance is expressed as the difference between the earned value and the planned value.

Cost Performance Index (CPI)

A measure of the cost efficiency of budgeted resources expressed as the ratio of earned value to actual cost.

Earned Value (EV)

A measure of work performed expressed in terms of the budget authorized for that work.

Source-Based Risk Classification

A method of analyzing risk in terms of its origins.

Bottom-Up Estimating

A method of estimating project duration or cost by aggregating the estimates of the lower-level components of the WBS.

Prototypes

A method of obtaining early feedback on user requirements by building a working model of the expected product. Prototypes can be used to solicit aesthetics, functionalities etc. Several iterations maybe displayed.

Reserve Analysis

A method used to evaluate the amount of risk on the project and the amount of schedule and budget reserve to determine whether the reserve is sufficient for the remaining risk.

Schedule Compression

A method used to shorten the schedule duration without reducing the project scope.

Earned Value Management (EVM)

A methodology that combines scope, schedule, and resource measurements to assess project performance and progress.

Iterative Life Cycle

A project life cycle in which the project scope is generally determined early in the project life cycle, but time and cost estimates are routinely modified as the project team's understanding of the product/service increases. Iterations progressively develop the product/service through a series of repeated cycles, while increments successively add to the functionality of the product/service

Project Performance Domains

A project performance domain is a group of related activities that are critical for the effective delivery of project outcomes. Project performance domains are interactive, interrelated, and interdependent areas of focus that work in unison to achieve desired project outcomes. There are eight project performance domains: • Stakeholders • Team • Development Approach and Life Cycle • Planning • Project Work • Delivery • Measurement • Uncertainty

Warranty

A promise, explicit or implied, that goods or services will meet a predetermined standard. Usually limited to a specific period of time.

Reserve

A provision in the project management plan to mitigate cost and/or schedule risk, often used with a modifier (e.g., management reserve, contingency reserve) to provide further detail on what types of risks are meant to be mitigated.

Variance

A quantifiable deviation, departure, or divergence away from a known baseline or expected value.

Expected Monetary Value (EMV)

A quantitative method of calculating the average outcome when the future is uncertain. The calculation of EMV is a component of decision tree analysis. Opportunities will have positive values and threats will have negative values.

Common Cause

A reason contributing to a quality problem that is usually considered acceptable. Common causes are considered unpreventable or if they are preventable, the cost of prevention would not justify the benefit.

Dependency

A relationship between one or more tasks/activities. A dependency may be mandatory or discretionary, internal or external

Mandatory Dependency

A relationship that is contractually required or inherent in the nature of the work.

Discretionary Dependency

A relationship that is established based on knowledge of best practices within a particular application area or an aspect of the project in which a specific sequence is desired.

Risk Register

A repository in which outputs of risk management processes are recorded. As the central planning document for project risk analysis and control, the risk register contains a list of the most important risks to the project's completion. For each risk, it identifies the likelihood of occurrence, the impact to the project, the priority, and the applicable response plans

Agile Modeling

A representation of the workflow of a process or system that the team can review before it is implemented in code.

Resource Levelling

A resource optimization technique in which adjustments are made to the project schedule to optimize the allocation of resources and which may affect the critical path.

Resource Smoothing

A resource optimization technique in which free and total float are used without affecting the critical path

Sprint Review

A review at the end of each iteration with the product owner and other customer stakeholders to review the progress of the product, get early feedback, and review an acceptance from the product owner of the stories delivered in the iteration

Demo

A review at the end of each iteration with the product owner and other customer stakeholders to review the progress of the product, get early feedback, and review an acceptance from the product owner of the stories delivered in the iteration.

Cadence

A rhythm of execution.

Monte Carlo Simulation (risk analysis)

A risk management technique, which project managers use to estimate the impacts of various risks on the project cost and project timeline. Using this method, one can easily find out what will happen to the project schedule and cost in case any risk occurs. It is used at various times during the project life cycle to get the idea on a range of probable outcomes during various scenarios.

Contingency Plan

A risk response strategy developed in advance, before risks occur; it is meant to be used if and when identified risks become reality.

Risk Mitigation

A risk response strategy whereby the project team acts to decrease the probability of occurrence or impact of a threat.

Risk Avoidance

A risk response strategy whereby the project team acts to eliminate the threat or protect the project from its impact.

Risk Exploiting

A risk response strategy whereby the project team acts to ensure that an opportunity occurs.

Risk Enhancement

A risk response strategy whereby the project team acts to increase the probability of occurrence or impact of an opportunity.

Risk Sharing

A risk response strategy whereby the project team allocates ownership of an opportunity to a third party who is best able to capture the benefit for the project.

Risk Acceptance

A risk response strategy whereby the project team decides to acknowledge the risk and not take any action unless the risk occurs.

Risk Transference

A risk response strategy whereby the project team shifts the impact of a threat to a third party, together with ownership of the response.

Secondary Risk

A risk that arises as a direct result of implementing a risk response

Definition of Ready (DoR)

A team's checklist for a user-centric requirement that has all the information the team needs to be able to begin working on it

Brainstorming

A simple technique used to generate a list of ideas. It should be led by a facilitator with a group consisting of stakeholders, team members, and subject matter experts. After quickly generating a list of alternatives, the group then performs analysis of the alternatives and generally chooses a particular option for action

Facilitation

A skill used to lead or guide an assembled group toward a successful conclusion such as making a decision or finding a solution.

Resource

A skilled individual or team, equipment, services, supplies, commodities, materials, budgets, or funds required to accomplish the defined work.

Tornado Diagram.

A special type of bar chart used in sensitivity analysis for comparing the relative importance of the variables.

Quality Gate

A special type of gate located before a phase that is strongly dependent upon the outcome of a previous phase. The quality gate process is a formal way of specifying and recording the transition between stages in the project life cycle.

Unique Identification Code

A specific configuration of a code of accounts that assigns a particular alphanumeric sequence of characters to each element of a WBS.

Milestone

A specific point within a project life cycle used as a measure in the progress toward the ultimate goal. A milestone marks a specific point along a project timeline. The point may signal anchors such as a project start and end date, a need for external review, or input and budget check. It is represented as a task of zero duration and is displayed as an important achievement in a project.

Vision Statement

A stated direction for the project established and communicated by the project sponsor

Accept

A strategy for managing negative risks or opportunities that involves acknowledging risk and not taking any action until the risk occurs.

Mitigate

A strategy for managing negative risks or threats and that involves taking action to reduce the probability of occurrence or the impact of a risk.

Avoid

A strategy for managing negative risks or threats that involves changing the project management plan to remove the risk entirely by extending the schedule, changing the strategy, increasing the funding, or reducing the scope.

Transfer

A strategy for managing negative risks or threats that involves shifting the impact and ownership of the risk to a third party and paying a risk premium to the party taking on the liability of the risk.

Share

A strategy for managing positive risks or opportunities that involves allocating some or all the ownership of the opportunity to a third party.

Exploit

A strategy for managing positive risks or opportunities that involves attempting to make sure that the opportunity happens

Enhance

A strategy for managing positive risks or opportunities that involves increasing the probability that the opportunity will happen, or the impact it will have by identifying and maximizing enablers of these opportunities.

Projectized Organization

A structure in which a project manager and a core project team operate as a separate organizational unit within the parent organization.

Quality Audit

A structured, independent process to determine if project activities comply with organizational and project policies, processes, and procedures.

Workaround

A suitable, unplanned alternative action used to complete work

Project Methodology

A system of principles, practices, techniques, procedures, and rules used by those who manage projects.

Version Control

A system that records changes to a file, in a way that allows users to retrieve previous changes made to it.

Information Management

A system to allow the team to collaborate, share, and capture project work.

Communication Method

A systematic procedure, technique, or process used to transfer information among project stakeholders.

Process

A systematic series of activities directed towards causing a result such that one or more inputs will be acted upon to create one or more outputs.

Reward

A tangible, consumable item that is given to a person based on a specific outcome or an achievement.

Project

A temporary endeavor undertaken to create a unique product, service, or result.

Nonfunctional Requirements (NFRs)

A term from agile software development. NFRs define system attributes such as security, reliability, performance, maintainability, scalability and usability. They serve as constraints or restrictions on the design of the system across backlogs.

Agile

A term used to describe a mindset of values and principles as set forth in the Agile Manifesto

Contingency Theory

A theory credited to Fred. E. Fielder which states that the set of skills and attributes that helped a project manager in one environment may work against them in another environment

Maslow's Hierarchy of Needs

A theory of psychology explaining human motivation based on the pursuit of different levels of needs. The theory states that humans are motivated to fulfill their needs in a hierarchical order. This order begins with the most basic needs before moving on to more advanced needs. The ultimate goal, according to this theory, is to reach the fifth level of the hierarchy: self-actualization.

Stakeholder Cube

A three-dimensional classification model that builds on the previous two-dimensional grids to group stakeholders.

Iteration

A timeboxed cycle of development on a product or deliverable in which all the work needed to deliver value is performed.

Burn Chart

A tool that is used to track the progress of the project by plotting the number of days of sprint against the number of hours of work remaining. It is used to communicate progress during and at the end of an iteration/sprint/ increment, showing the number of stores that have been completed and the ones that remain. The concept is as the project progresses over time, the backlog of work will "burn down"/lessen.

Configuration Management

A tool used to manage changes to a product or service being produced as well as changes to any of the project documents—for example, schedule updates.

Controlling PMO

A type of PMO that provides support and requires compliance through various means. Compliance may involve adopting project management frameworks or meth

Directive PMO

A type of PMO that takes control of projects by directly managing the projects.

Internal Dependency

A type of activity dependency that exists between project activities and is usually under the project's control.

Fixed Price Incentive Fee (FPIF) contract

A type of contract in which the buyer pays the seller a set amount (as defined by the contract), and the seller can earn an additional amount if the seller meets defined performance criteria.

Cost-Reimbursable Contract

A type of contract involving payment to the seller for the seller's actual costs, plus a fee typically representing the seller's profit.

Term Contract

A type of contract that engages the vendor to deliver a set amount of service— measured in staff-hours or a similar unit—over a set period of time.

Time and Material (T&M) Contract

A type of contract that is a hybrid contractual arrangement containing aspects of both cost-reimbursable and fixed-price contracts.

Completion Contract

A type of contract that is completed when the vendor delivers the product to the buyer and the buyer accepts the product

Cost Plus Fixed Fee (CPFF) contract

A type of cost-reimbursable contract in which the buyer reimburses the seller for the seller's allowable costs (allowable costs are defined by the contract) plus a fixed amount of profit (fee).

Cost Plus Incentive Fee (CPIF) contract

A type of cost-reimbursable contract in which the buyer reimburses the seller for the seller's allowable costs (allowable costs are defined by the contract), and the seller earns its profit if it meets defined performance criteria.

Firm Fixed Price Contract (FFP)

A type of fixed price contract in which the buyer pays the seller a set amount (as defined by the contract), regardless of the seller's costs.

Overlapping Relationships

A type of phase-to-phase relationship characterized by phases that start prior to the ending of the previous phase. Therefore, activities in different phases run concurrently with one another.

Invitation for Bid (IFB)

A type of procurement document most commonly used when deliverables are commodities for which there are clear specifications and when quantities are very large. The invitation is usually advertised, and any seller may submit a bid. Negotiation is typically not anticipated. These are sometimes used interchangeably with RFPs. Generally, this term is equivalent to RFP. However, in some application areas, it may be a narrower or more specific meaning.

Request for Quotation (RFQ)

A type of procurement document used to request price quotations from prospective sellers of common or standard products or services. Sometimes used in place of request for proposal and, in some application areas, it may have a narrower or more specific meaning.

Request for Proposal (RFP)

A type of procurement document used to request proposals from prospective sellers of products or services. In some application areas, it may have a narrower or more specific meaning.

Cost of Quality (CoQ)

All costs incurred over the life of the product by investment in preventing nonconformance to requirements, appraisal of the product or service for conformance to requirements, and failure to meet requirements.

Relative Estimating

Also called sizing. The process of estimating stories or backlog tasks in relation to each other instead of in units of time.

Float

Also called slack.

INVEST

Acronym describing the desirable attributes of a good story. Stands for: Independent, Negotiable, Valuable, Estimable, Small and Testable.

Communication

Act of accurately encoding, sending, receiving, decoding, and verifying messages. Communication between sender and receiver may be oral or written, formal or informal.

Swarming

Act of all development team members working on only one requirement at a time during the sprint. Team members focus collectively to resolve a specific problem.

Rework

Action taken to bring a defective or nonconforming component into compliance with requirements or specifications.

Gold Plating

Adding more scope than the customer requested and/or that the team planned for.

Incremental Delivery

Agile concept that the functionality should be delivered in small pieces or stages rather than as a complete solution

Planning Poker

Agile exercise to help the team estimate work.

Retrospective

Agile meeting held after the iteration/sprint/increment for the team to review the process and results to identify what went well and what can be done differently. Closely tied to continuous improvement. Process is the same as lessons learned.

Extreme Programming (XP)

Agile methodology in which iterations last for one week and programmers work in pairs.

Cone of Uncertainty

Agile term describing the difficulty of estimating early due to unknowns and how that should improve over time.

Theme

Agile term. Refers to groupings of epics or stories

Unanimity

Agreement by everyone in the group on a single course of action

Management Reserve

An amount of the project budget held outside of the performance measurement baseline (PMB) for management control purposes, that is reserved for unforeseen work that is within the scope of the project. Usually 5 - 10% of the project budget. This should not be confused with contingency reserve.

Sensitivity Analysis

An analysis technique to determine which individual project risks or other sources of uncertainty have the most potential impact on project outcomes, by correlating variations in project outcomes with variations in elements of a quantitative risk analysis model.

Simulation

An analytical technique that models the combined effect of uncertainties to evaluate their potential impact on objectives.

Trend Analysis

An analytical technique that uses mathematical models to forecast future outcomes based on historical results.

Communication Requirements Analysis

An analytical technique to determine the information needs of the project stakeholders through interviews, workshops, or study of lessons learned from previous projects, etc.

Root Cause Analysis

An analytical technique used to determine the basic underlying reason that causes a variance or a defect or a risk. A root cause may underlie more than one variance or defect or risk.

Agile Estimating

An approach that assists with planning a project appropriately from the beginning to ensure the team can focus on the quality of each deliverable.

Agile Life Cycle

An approach that is both iterative and incremental to refine work items and deliver frequently.

Total Quality Management (TQM)

An approach to improve business results through an emphasis on customer satisfaction, employee development, and processes rather than on functions.

Negotiation

An approach used by more than one individual or group to come to an agreement or resolution that is mutually agreed by all parties

Modeling

An approach used in schedule management and risk management. This can assist in identification of problems or areas of risk with the project before they actually occur. See also "What-If Scenario" and "Monte Carlo Analysis".

Business Document

An artifact developed prior to the project, used as part of the business case, and which is reviewed periodically by a project professional to verify benefit delivery.

Product

An artifact that is produced, is quantifiable, and can be either an end item in itself or a component item.

Project Management Software

An automated application that helps plan, organize, and manage project resources and develop resource estimates for activities. See also "Project Management Information System (PMIS)".

5 Whys Method

An effective tool for root cause analysis in which the question "Why?" is asked of a problem in succession until the root cause is found. Developed by Sakichi Toyoda, a Japanese inventor and industrialist, the 5 Whys method is an integral part of the Lean philosophy

Focus Groups

An elicitation technique that brings together pre-qualified stakeholders and subject matter experts to learn about their expectations and attitudes about a proposed product, service, or result.

Empowerment

An essential attribute of agile teams to enable localized decision-making capabilities. The quality of granting or being granted, nurturing, or motivating a team member or team to exercise one's own knowledge, skill, and ability—or that of a team

Parametric Estimating

An estimating technique in which an algorithm is used to calculate cost or duration based on historical data and project parameters. This technique is scalable and linear.

Ideal Time

An estimation technique that refers to the time it would take to complete a given task assuming neither interruptions nor unplanned problems arise

Risk

An event or condition of uncertainty that, if it occurs, has a positive or negative effect on one or more project objectives.

Trigger Condition

An event or situation that indicates that a risk is about to occur.

Audit

An examination of a project's goals and achievements, including adequacy, accuracy, efficiency, effectiveness, and the project's compliance with applicable methodologies and regulations. It tends to be a formal, one-sided process that can be extremely demoralizing to team members

Interactive Communication

An exchange of information between two or more individuals that ensures common understanding for everyone participating in that exchange.

Constraint

An external factor that limits the ability to plan. Constraints and assumptions are closely linked.

Knowledge Area

An identified area of project management defined by its knowledge requirements and described in terms of its component processes, practices, inputs, outputs, tools, and techniques. The knowledge areas intersect with the five respective Project Management Process Groups.

Persona

An imaginary person or identity created by the team to model interactions with the system to gather requirements.

Product Owner

An individual or an organization who is responsible for gathering inputs about a product from the customer and translating the requirements into the product vision for the team and stakeholders.

Stakeholder

An individual, group, or organization that may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of a project, program, or portfolio.

Waterfall

An informal name for predictive project management approach. This term is no longer used by PMI

Debriefing

An informal, collaborative means of discussing the positives and the negatives of a project, what worked, and what will be done differently next time. This discussion includes technology issues, people issues, vendor relationships, and organizational culture.

Story

Describes the smallest unit of work in an agile framework. An informal, general explanation of a product, service, or software feature written from the end-user's perspective. Its purpose is to articulate how the feature will provide value to the customer. See also "User Story"

Scope Statement

Details about project deliverables and the major objectives of a project, including measurable outcomes.

Allowable Costs

Costs that are allowed under the terms of the contract. Typically, allowable costs become relevant under certain types of cost-reimbursable contracts in which the buyer reimburses the seller's allowable costs.

Direct Cost

Costs that are reported against the project, which may include salaries for resources, materials, and other expenses. It does not include shared expenses or overhead expenses.

Critical Path Activity

Any activity on the critical path in a project schedule.

Configuration Item

Any component or project element that needs to be managed to ensure the successful delivery of the project, services, or result.

Project Artifact

Any document related to the management of a project

Agreements

Any documents or communication that defines the initial intentions of a project. Examples include contracts, memorandums of understanding (MOUs), service-level agreements (SLAs), letters of agreement, letters of intent, verbal agreements, email, or other written agreements.

Project Documents

Any documents that are prepared in support of a project - for example, requirements, specifications, contracts with vendors, design documents, test plans, and publications that will be delivered to the client along with the final product.

EEF

Any or all environmental factors either internal or external to the project that can influence the project's success. Enterprise Environmental Factors (EEFs) include culture, weather conditions, government regulations, political situation, market conditions, and so on.

Artifact

Any project management processes, inputs, tools, techniques, outputs, EEFs, and OPAs that the project management team uses on their specific project. They are subject to configuration management and are maintained and archived by the team.

Deliverable

Any unique and verifiable product, result, or capability used to perform a service and that is required to be produced to complete a process, phase, or projects.

Assumption

Anything considered to be true while planning. Assumptions should be documented and validated and are often closely linked to constraints

Crashing

Applying additional resources to one or more tasks/activities to complete the work more quickly. Crashing usually increases costs more than risks. In comparison, fast-tracking increases risks.

Historical Information

Archived information from previous projects that can be used for a multitude of reasons, including estimating cost, schedule, resources, and lessons learned.

Community of Practice (CoP)

As described by E. Wenger in his book, Cultivating Communities of Practice, the CoP uses the same basic idea as used by Shell in their offshore drilling platforms to establish local forums of "experts" with the specific mandate to create an arena in which project managers would feel comfortable sharing their findings and learnings from their projects.

Control Costs Process

Monitor and control project costs to ensure they align with the cost baseline/budget

Psychological Safety

Being able to show and employ oneself without fear of negative consequences of status, career, or self-worth—we should be comfortable being ourselves in our work setting.

Disaggregation

Breaking down epics or large stories into smaller stories. This is similar to decomposition on predictive projects.

Budget

Budget A time-phased plan for when funds will be disbursed on a project. It helps the organization anticipate when money will be coming in and/or going out, for the duration of the project. Budget accuracy is dependent upon a well-defined project scope and schedule. The total project budget is the cost baseline plus management reserves.

Project Funding Requirements

Budgetary requirements that specify when funds will be needed to be provided for the project.

Workflow

Carefully planned sequence of the tasks and activities that need to be done to complete the project.

Approved Change Requests

Change requests that have been reviewed and approved by the change control board (CCB) and are ready to be scheduled for implementation

Statistical Sampling

Choosing part of a population of interest for inspection. Used when more thorough data analysis methods are not suitable.

Osmotic Communication

Communication which occurs informally or indirectly and through means such as overhearing, as a result of people sitting in the same room/environment.

Wideband Delphi Estimating

Consensus-based estimation technique for estimating effort

Qualified Vendors List

Contains details regarding vendors who meet the organization's requirements and to whom requests can be sent.

Cost Forecast

Cost estimates adjusted based on performance—i.e., Estimate at complete, budget at completion, estimate to complete, etc.

Variable Sampling Data

Data from a sample that is measured on a continuous scale such as time, temperature, or weight.

Information

Data that has been analyzed, organized, and processed to make it more meaningful.

Attribute Sampling Data

Data that is counted such as the number of product defects or customer complaints

Plurality

Decisions made by the largest block in a group, even if a majority is not achieved

Make-or-Buy Decisions

Decisions made regarding the external purchase versus internal manufacture of a product.

Scrum Team

Dedicated, self-managing, cross-functional, fully empowered individuals who deliver the finished work required by the customer.

Project Plan

Defines project goals and objectives, specifies tasks, and methodology. The plan identifies the resources required, associated budgets, and timelines for completion. A project plan is expected to define all works in a project, the human resources and other resources required to execute the plan in its entirety.

Verified Deliverable

Deliverables that have been compared to the scope/requirements and specifications to ensure they are correct.

Accepted Deliverables

Deliverables that meet the acceptance criteria and have been formally signed off and approved by the customer or sponsor as part of the scope validation process.

Test-Driven Development (TDD)/Test-First Development

Derived from a software development practice, TDD helps in the design process by using repeated short development cycles. First the developer writes an (initially failing) automated test case that defines a desired improvement or new function. The team then produces the minimum amount of code to pass that test before finally refactoring the new code to acceptable standards.

Procurement Statement of Work (SOW)

Describes the procurement item in sufficient detail to allow prospective sellers to determine their capability of executing the tasks necessary to deliver the deliverables, products, services, or outputs.

Conflict

Difference of opinion or agenda on a project amongst team members, stakeholders, or customers.

Procurement Documents

Documents used in bid and proposal activities, which include the buyer's invitation for bid, expression of interest (EOI); invitation for negotiations; request for information (RFI); request for quotation (RFQ); request for proposal (RFP); and seller's responses.

Activity Cost Estimates

Each task is assigned a budget, and the aggregate of these estimates results in the project budget. Activity cost estimates include labor, materials, equipment, and fixed cost items like contractors, services, facilities, financing costs, etc. This information can be presented in a detailed or summarized form.

Actual Cost (AC)

Earned Value Management term for the realized cost incurred for the work performed on an activity during a specific time.

Independent Estimates

Estimates generated by experts outside the project for the purposes of comparing them with those made by the team.

Schedule Forecast

Estimates or predictions of conditions and events in the project's future based on information and knowledge available at the time the schedule is calculated.

Ground Rules

Expectations regarding acceptable behavior by project team members.

Risk Categorization

Organization by sources of risk (e.g., using the RBS), the area of the project affected (e.g., using the WBS), or other useful category (e.g., project phase) to determine the areas of the project most exposed to the effects of uncertainty.

Project Requirements

For a project, these are the agreed-upon conditions or capabilities of a product, service, or outcome that a project is designed to satisfy

Product Analysis

For projects that deliver a product, this is a tool to define scope. It generally means asking questions about a product and forming answers to describe the use, characteristics, and other relevant aspects of what is going to be manufactured.

Consensus

Group decision technique in which the group agrees to support an outcome even if the individuals do not agree with the decision

Herzberg's Motivation-Hygiene Theory

In 1959, behavioral scientist Frederick Herzberg proposed that 'hygiene' or environmental factors can cause workers to feel satisfied or unsatisfied with their job and this factor affects their performance. The theory also proposes that a worker's independent drive associated with motivation also affects performance and that workers respond to feelings of connection with their work. Therefore, leaders should encourage workers to accept more authority as well as promote feedback. Also known as Two Factor Theory, Herzberg's Motivation Theory, and The Dual Structure Theory.

Agile Manifesto

In 2001, a group of 17 software developers met in Snowbird, Utah to discuss lightweight software development. Based on their experience, they came up with the four core values of agile software development as stated by the Agile Manifesto are: individuals and interactions over processes and tools; working software over comprehensive documentation; customer collaboration over contract negotiation; and responding to change over following a plan.

Functionality

In an agile context, an action that the system performs that adds value to the customer/user.

Interactions

In an agile context, this generally refers to face-to-face conversations between members, customers and stakeholders.

Project Meetings

In-person or virtual communication events held with stakeholders that intend to generate group decisions, such as discussing issues, creating proposals, and approving or rejecting offers which can contribute to quicker project deliverables, planned goals, and expected results. Project meetings are an effective method of distributing information and communicating with the team and stakeholders.

Administrative Closure

Involves verifying and documenting project results to formalize project or phase completion

Kanban

Japanese management philosophy that means "signal". This philosophy focuses on promoting visibility of the work in progress (WIP) and limiting the amount of WIP that the team allows

Expert Judgment

Judgment provided based upon expertise in an application area, knowledge area, discipline, industry, etc., as appropriate for the activity being performed. Such expertise may be provided by any group or person with specialized education, knowledge, skill, experience, or training

Explicit Knowledge

Knowledge that can be codified using symbols such as words, numbers, and pictures. This type of knowledge can be easily documented and shared with others.

Life Cycle Costing (LCC)

Life cycle costing is an approach that assesses the total cost of an asset over its life cycle including but not limited to initial capital costs, maintenance costs, etc. LCC is an important economic analysis used in the selection of alternatives that impact both pending and future costs. The concept is also known as lifetime cost and is commonly referred to as "cradle to grave" or "womb to tomb" costs.

Business Requirement Documents (BRD)

Listing of all requirements for a specific project.

Analytical Techniques

Logical approach that looks at the relationship between outcomes and the factors that can influence them

Exit Gate

Logical point at the end of a project phase at which an independent party and/or relevant stakeholders reviews that phase's deliverables to determine whether or not they were completed successfully, and the subsequent project phase should be initiated. Used in predictive or traditional projects

Activity Resource Estimates

Material and human resources that are needed to complete an activity; often expressed by a probability or range.

Net Promoter Score (NPS)

Measures a customer's willingness to recommend a provider's products or services to another on a scale of -100 to 100.

Push Communications

Messages that are sent out to people who need to receive the information.

Pull Communications

Messages that require the interested people to access the information based on their own initiative.

Expectancy Theory

Motivational theory which proposes that the team makes choices based on the expected outcome.

Outsourcing

Moving beyond the organization to secure services and expertise from an outside source on a contract or short-term basis.

Activity Attributes

Multiple attributes associated with each activity that can be included within the activity list.

Organizational Silo

Occurs when employees or an entire department are isolated or refuse to share information or interact with others in the same company. Thus, the flow of critical information will be contained within that department.

Monitor and Controlling Process Group

One of five Project Management Process Groups. Monitoring and controlling processes measure work results against the plan and make adjustments where variance exists.

Executing Process Group

One of the five Project Management Process Groups. It consists of those processes performed to complete the work defined in the project management plan to satisfy the project requirements

Closing Process Group

One of the five Project Management Process Groups. It consists of those processes performed to formally complete or close the project, phase, or contract.

Planning Process Group

One of the five Project Management Process Groups. It consists of those processes required to establish the scope of the project, refine the objectives, and define the course of action required to attain the objectives that the project was undertaken to achieve.

Monitoring and Controlling Process Group

One of the five Project Management Process Groups. It consists of those processes required to track, review, and regulate the progress and performance of the project; identify any areas in which changes to the plan are required; and initiate the corresponding changes.

Initiating Progress Group

One of the five Project Management Process Groups. It includes the process(es) performed to define a new project or a new phase of an existing project by obtaining authorization to start the project or phase.

Transparency

One of the three pillars of empirical process (transparency, inspection, and adaptability) that promotes real-time, accurate progress on every aspect of the project. See also "Visibility".

Story Card

One unit of delivery for an agile team.

Facilitated Workshops

Organized working sessions held by project managers to determine a project's requirements and to get all stakeholders together to agree on the project's outcomes.

Baseline

Original objectives plus approved change requests for scope, schedule, cost, and resources required to finish the project. Baselines represent the approved plan, and they are useful for measuring how actual results deviate from the plan.

Empathy

Part of emotional intelligence (EQ or EI). The ability to understand others' viewpoints and be a team player. It enables us to connect with others and understand what moves them

Develop Team Process

Part of the Executing Process Group, this process enhances and empowers the team to improve teamwork and individual skills

Develop Project Charter

Part of the Initiating Process Group, this process produces the project charter, which officially starts the project

Control Schedule Process

Part of the Monitoring and Controlling Process Group, this process compares the planned work to the actual work.

Control Scope Process

Part of the Monitoring and Controlling Process Group, this process ensures that changes to scope are properly controlled.

Control Resources Process

Part of the Monitoring and Controlling Process Group, this process ensures that the flow and usage of physical resources line up with the plan.

Control Quality Process

Part of the Monitoring and Controlling Process Group, this process focuses on the quality of deliverables.

Control Procurements Process

Part of the Monitoring and Controlling Process Group, this process is performed by the buyer to ensure compliance by the seller and the other party; it compares the terms in the agreement/contract

Develop Schedule Process

Part of the Planning Process Group, this process arranges activities to create the schedule baseline.

Define Activities Process

Part of the Planning Process Group, this process defines the activities (tasks) necessary to complete work packages/stories.

Estimate Costs Process

Part of the Planning Process Group, this process determines the financial estimate for each work package and/or activity.

Estimate Activity Resources Process

Part of the Planning Process Group, this process estimates the materials and human resources needed to perform the project activities.

Determine Budget Process

Part of the Planning Process Group, this process produces the cost baseline/project budget.

Define Scope Process

Part of the Planning Process Group, this process produces the scope statement that depicts a detailed and complete understanding of the project's vision.

Plan Quality Management

Performed once or at predefined points in the project, the process of identifying quality requirements and/or standards for the project and its deliverables and documenting how the project will demonstrate compliance with quality requirements and/or standards. The key benefit of this process is that it provides guidance and direction on how quality will be managed and verified throughout the project.

Phase

Refers to a collection of activities within a project. Each project phase is goal oriented and ends at a milestone

Plan Scope Management

Performed once or at predefined points in the project, this is the process of creating a scope management plan that documents how the project and product scope will be defined, validated, and controlled. The key benefit of this process is that it provides guidance and direction on how scope will be managed throughout the project.

Plan Cost Management

Performed once or at predefined points in the project, this is the process of defining how the project costs will be estimated, budgeted, managed, monitored, and controlled. The key benefit of this process is that it provides guidance and direction on how the project costs will be managed throughout the project.

Plan Risk Management

Performed once or at predefined points in the project, this is the process of defining how to conduct risk management activities for a project. The key benefit of this process is that it ensures that the degree, type, and visibility of risk management are proportionate to both risks and the importance of the project to the organization and other stakeholders.

Plan Resource Management

Performed once or at predefined points in the project, this is the process of defining how to estimate, acquire, manage, and use team and physical resources. The key benefit of this process is that it establishes the approach and level of management effort needed for managing project resources based on the type and complexity of the project.

Plan Procurement Management Process

Performed once or at predefined points in the project, this is the process of documenting project procurement decisions, specifying the approach and identifying potential sellers. The key benefit of this process is that it determines whether to acquire goods and services from outside the project and, if so, what to acquire as well as how and when to acquire it. Goods and services may be procured from other parts of the performing organization or from external sources.

Plan Schedule Management

Performed once or at predefined points in the project, this is the process of establishing the policies, procedures, and documentation for planning, developing, managing, executing, and controlling the project schedule. The key benefit of this process is that it provides guidance and direction on how the project schedule will be managed throughout the project.

Plan Stakeholder Engagement Process

Performed periodically throughout the project as needed, this is the process of developing approaches to involve project stakeholders based on their needs, expectations, interests, and potential impact on the project. The key benefit is that it provides an actionable plan to interact effectively with stakeholders.

Plan Communications Management

Performed periodically, as needed, throughout the project, this is the process of developing an appropriate approach and plan for project communications activities based on the information needs of each stakeholder or group, available organizational assets, and the needs of the project. The key benefit of this process is a documented approach to engage stakeholders effectively and efficiently by presenting relevant information in a timely manner.

Identify Stakeholders

Performed periodically, throughout the project as needed, this is the process of identifying project stakeholders regularly and analyzing and documenting relevant information regarding their interests, involvement, interdependencies, influence, and potential impact on project success. The key benefit of this process is that it enables the project team to identify the appropriate focus for engagement of each stakeholder or group of stakeholders.

Monitor Stakeholder Engagement Process

Performed throughout a project, this is the process of monitoring project stakeholder relationships and tailoring strategies for engaging stakeholders through modification of engagement strategies and plans. The key benefit of this process is that it maintains or increases the efficiency and effectiveness of stakeholder engagement activities as the project evolves and its environment changes.

Identify Risks

Performed throughout the project, this is the process of identifying individual project risks as well as sources of overall project risk and documenting their characteristics. The key benefit of this process is the documentation of existing individual project risks and the sources of overall project risk. It also brings together information so the project team can respond appropriately to identified risks.

Monitor and Control Project Work

Performed throughout the project, this the process of tracking, reviewing, and reporting the overall progress to meet the performance objectives defined in the project management plan. The key benefits of this process are that it allows stakeholders to understand the current state of the project, to recognize the actions taken to address any performance issues, and to have visibility into the future project status with cost and schedule forecasts.

Tacit Knowledge

Personal knowledge that can be difficult to articulate and share such as beliefs, experience, and insights.

Sequential Relationships

Refers to a consecutive relationship between phases; phases occur in procession and without overlap

Role

Refers to a human-driven function in a work setting.

Predictive Life Cycle

Project management approach in which activities are completed in a distinct or linear fashion and a new phase begins only when the previous phase is completed. Value is delivered at the completion of the project in the form of deliverables. Also known as "Waterfall"

T-Shaped

Refers to a person whose skill set comprises one area of specialization and broad ability in other skills required by the team.

War Room

Refers to a physical space where project team members and stakeholders plan strategy and run a project.

Portfolio

Projects, programs, subsidiary portfolios, and operations managed as a group to achieve strategic objectives.

Change Control

Purposeful management of changes to the project (scope, schedule, cost, or quality). In change control, a change request goes through a formal process before a decision (approve/deny) is made.

Project Management Process Groups

Refers specifically to five logic-oriented groupings of project management processes. These include: 1. Initiation 2. Planning 3. Executing 4. Monitoring and Controlling 5. Closing

Theory X

Refers to Theory X by Douglas McGregor which proposes that managers micro-manage their employees or team members because they assume their workers are unmotivated and dislike work. See also "Theory Y".

Theory Y

Refers to Theory Y by Douglas McGregor which proposes that managers have an optimistic and positive opinion of their employees or team members, so this type of manager encourages a more collaborative, trust-based relationship between employees. See also "Theory X".

Monte Carlo Analysis

Refers to a simulation technique in project management by which the project manager computes and calculates the total project cost and the project schedule using various scenarios. A set of input values are selected taking into consideration the of probability distributions, potential costs, and potential durations. It allows a project manager to calculate a probable total cost of a project as well as to find a range or a potential date of completion for the project.

Special Cause

Refers to a system in project management. Also called an assignable cause. Any factor or factors which may affect a system either in progress or outcome

Organizational Process Assets (OPA)

Refers to all the implicit input or assets on processes used by an organization in operating a business. This may include business plans, processes, policies, protocols, and knowledge.

Milestone List

Refers to an input or an output of various processes. A document that contains the milestones of a project.

Referent Power

Refers to establishing trust, respect, and credibility with people in work or personal life contexts.

Data

Refers to gathered empirical information, especially facts and numbers.

Refactoring

Refers to software development. Improving the design of the code so that it is easier to test, debug, and maintain

Lag

Refers to the amount of time whereby a successor activity will be delayed with respect to a preceding activity on the critical path.

Triple Constraint

Refers to the factors of time, cost, and scope which can be adjusted when managing projects. Often called the project management triangle.

Cycle Time

Refers to the period from the time a team starts a task until the time it is completed

Lead Time

Refers to the period from the time the team places a task on the board until delivery. Because the order of the items in the Ready column can be changed, this can be unpredictable. See also "cycle time."

Withdrawal

Refusal to deal with a conflict.

De Jure Regulations

Regulations that are mandated by law or have been approved by a recognized body of experts.

De Facto Regulations

Regulations that are widely accepted and adopted through use

Program

Related projects, subsidiary programs, and program activities that are managed in a coordinated manner to obtain benefits not available from individual management of them. A project may or may not be part of a program, but a program will always have projects.

Node

Represents the start or end of an activity in a sequence.

Change Request (CR)

Request for change sent to upper management or the Change Control Board (CCB) for its evaluation and approval.

Regulations

Requirements imposed by a governmental body. These requirements can establish product, process, or service characteristics, including applicable administrative provisions that have government-mandated compliance.

Hardening Iteration/Iteration H

Specialized increment/iteration/sprint dedicated to stabilizing the code base so that it is robust enough for release. No new functionality is added. Primarily used for refactoring and/or technical debt.

Joint Application Design (JAD)

Specialized workshops that include both SMEs and the development team together to discuss and improve on the software development process.

Communication Technology

Specific tools, automated systems, computer programs, etc., used to transfer information among project stakeholders.

RACI Chart

Stands for Responsible, Accountable, Consulted, and Informed. A common type of responsibility assignment matrix (RAM) that uses responsible, accountable, consult, and inform statuses to define the involvement of stakeholders in project activities.

Standard Deviation (SD)

Statistical concept that gives a measure of the duration uncertainty and risk in project time estimation. SD represented by the Greek letter sigma (σ). A low value for the SD indicates that that data points are close to the mean or the expected value of the set, while a high value indicates that the data points are spread out over a wider range.

Corrective Action

Steps (action) to bring future results in line with the plan; this can change the plan or the way the plan is being executed.

Cost Aggregation

Summing the lower-level cost estimates associated with the various work packages for a given level within the project's WBS or for a given cost control account.

Functional Manager

Supervisory organizational role in a specialized area or department.

Value Engineering

Systematic, organized approach to providing necessary functions in a project at the lowest cost.

Agile Space

Team space that encourages colocation, collaboration, communication, transparency, and visibility.

Group Decision Techniques

Team working techniques to move a group towards consensus or decision. Examples are unanimity, majority, plurality, and dictatorship

Cross-Functional Team

Teams that have all the capabilities to deliver the work they've been assigned. Team members can specialize in certain skills, but the team can deliver what they've been called on to build. See also "self-organizing teams."

Affinity Estimating

Technique designed to rapidly estimate large stories (epics or features) in the backlog. For example: T-Shirt sizing, coffee cup sizes, or Fibonacci sequence

Forward Pass

Technique for calculating the early start and early finish dates of the schedule activities. This is part of the critical path method and is paired with backward pass to determine activity and schedule float along with the critical path.

Backward Pass

Technique for calculating the late start and late finish dates of the schedule activities. This is part of the critical path method and is paired with forward pass to determine activity and schedule float along with the critical path.

Quantitative Risk Analysis

Technique used to assess the risk exposure events to overall project objectives and determine the confidence levels of achieving the project objectives.

Job Shadowing

Techniques used to gain knowledge of a specific job role, task, or function to understand and determine project requirements

Observations

Techniques used to gain knowledge of a specific job role, task, or function to understand and determine project requirements

Data Gathering

Techniques used to solicit and document ideas—i.e., brainstorming, interviews, focus groups, questionnaires, surveys, and so on.

Capability Maturity Model Information (CMMI)

The CMMI provides a framework for the integration of process improvement for multiple process areas. Associated with quality management.

Activity Resource Requirements

The resources (physical, human, and organizational) required to complete the activities in the activity list.

Procurement Audit

The review of procurement contracts and contracting processes for completeness, accuracy, and effectiveness.

Residual Risk

The risk that remains after risk responses have been implemented.

System

The rules, processes, procedures, people, and other elements that support an outcome or process. A project can have one or many systems, for example, work authorization system, change control system, information system, etc.

Probability Distribution

The scattering of values assigned to likelihood in a sample population. It can be visually depicted in the form of a probability density function (PDF).

Critical Path

The sequence of activities that represents the longest path through a project, which determines the shortest possible duration.

Path

The sequence of project network activities.

Project Life Cycle

The series of phases that a project passes through from its start to its completion

Skills List

The skills list provides details of all the skills the team possesses. This includes interpersonal skills needed to establish and maintain relationships with other people. Some of the skills may be irrelevant to the project team, while some are highly relevant to project goals.

Minimum Business Increment (MBI)

The smallest amount of value that can be added to a product or service that benefits the business

Minimum Viable Product (MVP)

The smallest collection of features that can be included in a product for customers to consider it functional. In Lean methodologies, it can be referred to as "bare bones" or "no frills" functionality.

Kill Point

The stage gate or phase review point. At this point, the progress of the project is evaluated, and a decision is made whether to continue or cancel the project. A set of criteria may be developed to assist with the decision to be made.

Compliance

The state of meeting—or being in accord with—organizational, legal, certification or other relevant regulations.

Organizational Theory

The study of how people, teams, and organizations behave. It is part of the search for common themes for the purpose of maximizing efficiency and productivity, problem solving, and meeting the stakeholder requirements of a project.

Budget at Completion

The sum of all budgets established to provide financial support for the work to be performed.

Contract Change Control System

The system used to collect, track, adjudicate, and communicate changes to a contract.

Continuous Process Improvement

The systematic, ongoing effort to improve products, services, or processes in an organization

Supportive PMO

The type of PMO that provides a consultative role to projects by supplying templates, best practices, training, access to information, and lessons learned from other projects.

Resource requirements

The types and quantities of resources required for each activity in a work package

Scope Creep

The uncontrolled expansion of project scope without adjustments to time, cost, and resources

Organizational Culture

The underlying beliefs, assumptions, values, and behaviors that contribute to and define the unique social and psychological environment of an organization.

Non-Verbal Communication

The use of body language and other means besides the spoken word—posture, gestures, dress and appearance, facial expressions, and the like—to communicate.

Qualified Vendors

The vendors who are approved to deliver the products, services, or results based on the procurement requirements identified for a project.

Work Package

The work defined at the lowest level of the work breakdown structure (WBS) for which cost and duration are estimated and managed.

Iteration Backlog

The work that is committed to be performed during a given iteration and is expected to burn down the duration. The work does not carry over to the next iteration.

Value

The worth that a project delivers to the business.

Sprint Retrospective

This critical part of the Scrum process is attended by the product owner, Scrum Master, and the Scrum team to analyze from a process perspective what is working well and what is not and to agree upon changes to implement.

Cause and Effect Diagram

This diagram shows the relationship between causes and effects. Primarily used in root cause analysis (risk and quality) to uncover the causes of risks, problems, or issues

Resource Management Plan

This plan defines staff acquisition, the timetable for staff acquisition, the staff release plan, training needs for the project team, any organizational compliance issues, rewards and recognitions, and safety concerns for the project team doing the project work.

Risk Response Plan

This plan involves reducing and eliminating risks and their potential impacts through appropriate mitigation techniques.

Monitor Communications Process

This process determines if the planned communications artifacts and activities have had the desired effect of increasing or maintaining stakeholders' support for the project's deliverables and expected outcomes.

Logical Relationship

Those relations between the elements of discourse or thought that constitute its rationality, in the sense either of reasonableness or intelligibility.

Contingency Reserve

Time or money allocated in the schedule or cost baseline for known risks with active response strategies.

External Dependency

Types of activity dependencies that exist between project activities and non-project activities and can be out of the project's control.


संबंधित स्टडी सेट्स

EQUAL EMPLOYMENT OPPORTUNITY (EEO)

View Set

PrepU Chapter 19: Documenting and Reporting

View Set

Chapter 7 - Land Value and Highest and Best Use

View Set

Chapter 3 People and Ideas on the move

View Set

physiology & anatomy chapter 9 practice exam

View Set