Software QA Testing Quiz

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

25) Acceptance testing is known as a) Beta Testing b) Greybox testing c) Test Automation d) White box testing

a) Beta Testing

27) Boundary value analysis belongs to which testing method? a) Black Box testing b) White Box testing

a) Black Box testing

26) Retesting the entire application after a change has been made called as? a) Full Regression Testing b) Unit Regression c) Regional Regression d) Retesting

a) Full Regression Testing

17) Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as a) Pareto Analysis b) Cause and Effect Diagram c) SWOT Analysis d) Pie Charts

a) Pareto Analysis

15) Verification is a) Process based b) Product based

a) Process based

61) A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as a) Process metric b) Product Metric c) Test metrics

a) Process metric

34) Executing the same test case on a modified build called as a) Regression Testing b) Retesting c) Ad hoc Testing d) Sanity Testing

a) Regression Testing

65) How severely the bug is effecting the application is called as a) Severity b) Priority c) Fix ability d) Traceability

a) Severity

45) SPICE Means a) Software Process Improvement and Capability Determination b) Software Process Improvement and Compatibility Determination. c) Software Process Invention and Compatibility Determination. d) Software Process Improvement and Control Determination

a) Software Process Improvement and Capability Determination

47) It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes. a) TIM (Testing Improving Model) b) TMM (Testing Maturity Model) c) TQM(Total Quality Management)

a) TIM (Testing Improving Model)

71) ------------- means under what test environment(Hardware, software set up) the application will run smoothly a) Test Bed b) Checkpoint c) Code Walk through d) Checklist

a) Test Bed

11) Cost of quality = Prevention Cost + Appraisal cost + Failure cost a) True b) False

a) True

19) Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC ) a) True b) False

a) True

21) Configuration Management Plan describes the Configuration Management procedures and structures to be used. a) True b) False

a) True

3) Control Charts is a statistical technique to assess, monitor, and maintain the stability of a process. a) True b) False

a) True

30) Product Risk affects The quality or performance of the software. a) True b) False

a) True

36) Business Risk affects The Organization developing or Procuring the software. a) True b) False

a) True

37) Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups(strata). a) True b) False

a) True

41) Software Testing is a process of evaluating a system by manual or automatic means and verify that it satisfies specified requirements or identity differences between expected and actual results. a) True b) False

a) True

49) Path Tested = Number of Path Tested / Total Number of Paths a) True b) False

a) True

55) Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required a) True b) False

a) True

57) Validation plan describes the approach ,resources and schedule used for system validation a) True b) False

a) True

59) Types of quality tools are Problem Identification Tools and Problem Analysis Tools. a) True b) False

a) True

6) Staff development plan describes how the skills and experience of the project team members will be developed. a) True b) False

a) True

62) Check Sheet(Checklist) is considered a simple , but powerful statistical tool because it differentiates between two extremes. a) True b) False

a) True

66) Project Risk affects The Schedule or Resources. a) True b) False

a) True

70) Cost of Production = Right The First time cost(RTF) + Cost of Quality. a) True b) False

a) True

77) Splitting project into tasks and estimate time and resources required to complete each task called as Project Scheduling a) True b) False

a) True

51) This type of test include, how well the user will be able to understand and interact with the system? a) Usability Testing b) User Acceptance Testing c) Alpha Testing d) Beta Testing.

a) Usability Testing

8) A Non-Functional Software testing done to check if the user interface is easy to use and understand a) Usability Testing b) Security Testing c) Unit testing d) Block Box Testing

a) Usability Testing

75) Beta testing will be done at a) User place b) Developers place

a) User place

5) To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process. a) Validation b) Verification c) Quality Assurance d) Quality Control

a) Validation

39) Earlier a defect is found the cheaper it is to fix it. Is the above statement correct? a) Yes b) No

a) Yes

24) Software testing which is done without planning and Documentation is known as a) adHoc Testing b) Unit Testing c) Regression testing d) Functional testing.

a) adHoc Testing

35) Which is Black-Box Testing method? a) equivalence partitioning b) code coverage c) fault injection

a) equivalence partitioning

9) The review and approved document (i.e. Test plan, System Requirement Specification's) is called as a) Delivery Document b) Baseline Document c) Checklist

b) Baseline Document

23) Phase Definition. It will come under a) CMM Level 1 b) CMM Level 2 c) None

b) CMM Level 2

58) Integration, It will come under a) CMM Level 1 b) CMM Level 3 c) CMM Level 2 d) None

b) CMM Level 3

12) A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as "fishbone diagram" what is this? a) Pareto Analysis b) Cause-and-Effect Diagram

b) Cause-and-Effect Diagram

16) White box testing is not called as___________ a) Glass box testing b) Closed box testing c) OPen box testing d) Clear box testing

b) Closed box testing

44) Alpha testing will be done at, a) User's site b) Developers' site

b) Developers' site

38) Automation Testing should be done before starting Manual testing. Is the above statement correct? a) Yes b) No

b) No

53) What is correct Software Process Cycle? a) Plan(P)------>Check(C)------>Act(A)----->Do(D) b) Plan(P)------>Do(D)------>Check(C)----->Act(A) c) Plan(P)------>Do(D)------>Act(A)----->Check(C)

b) Plan(P)------>Do(D)------>Check(C)----->Act(A)

40) Informing to the developer which bug to be fix first is called as a) Severity b) Priority c) Fix ability d) Traceability

b) Priority

31) A metric used to measure the characteristic of documentation and code called as a) Process metric b) Product Metric c) Test metrics

b) Product Metric

2) Executing the same test case by giving the number of inputs on same build called as a) Regression Testing b) ReTesting c) Ad hoc Testing d) Sanity Testing

b) ReTesting

46) Requirements Specification, Planning, Test case Design, Execution, Bug Reporting & Maintenance This Life Cycle comes Under a) SDLC b) STLC c) SQLC d) BLC

b) STLC

54) Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA's and network associates after the system Testing called as a) Functional Testing b) Stress/Load Testing c) Recovery Testing d) Integration Testing

b) Stress/Load Testing

7) It is a set of levels that defines a testing maturity hieraecy a) TIM (Testing Improving Model) b) TMM (Testing Maturity Model) c) TQM(Total Quality Management)

b) TMM (Testing Maturity Model)

63) Application should be stable. Clear Design and Flow of the application is needed for Automation testing. a) False b) True

b) True

64) Quality plan describes the quality procedures and standards that will be used in a project. a) False b) True

b) True

18) Retesting of a single program or component after a change has been made? a) Full Regression Testing b) Unit Regression c) Regional Regression d) Retesting

b) Unit Regression

56) Beta testing will be done by a) Developer b) User c) Tester

b) User

4) To check whether we are developing the right product according to the customer requirements are not. It is a static process a) Validation b) Verification c) Quality Assurance d) Quality Control

b) Verification

50) This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as a) Block box Testing b) White box Testing c) Grey Box Testing d) Closed Box Testing

b) White box Testing

22)This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as a) White Box Testing b) Grey Box Testing c) Black Box Testing d) Open Box Testing

c) Black Box Testing

68) Management and Measurement, It will come under a) CMM Level 1 b) CMM Level 3 c) CMM Level 4 d) CMM Level 2

c) CMM Level 4

48) Standards and procedures for managing changes in an evolving software product is called? a) Confirmation Management b) Confederation Mangement c) Configuration Management d) Compartability Management

c) Configuration Management

14) Variance from product specifications is called? a) Report b) Requirement c) Defect

c) Defect

69) AdHoc testing is a part of a) Unit Testing b) Regression Tesing c) Exploratory Testing d) Performance Testing

c) Exploratory Testing

32) Which is non-functional software testing? a) Unit Testing b) Block box testing c) Performance Testing d) Regression testing

c) Performance Testing

13) It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process. a) Validation b) Verification c) Quality Assurance d) Quality Control

c) Quality Assurance

42) Retesting modules connected to the program or component after a change has been made? a) Full Regression Testing b) Unit Regression c) Regional Regression d) Retesting.

c) Regional Regression

33) The process that deals with the technical and management issues of software development called as? a) Delivery Process b) Testing Process c) Software Process

c) Software Process

43) An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under a) Process Metric b) Product Metric c) Test Metric

c) Test Metric

72) TQM represents a) Tool Quality Management b) Test Quality Manager c) Total Quality Management d) Total Quality Manager

c) Total Quality Management

60) Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself a) Water falls model b) Spiral Model c) V-model d) Linear model

c) V-model

20) The testing which is done by going thro' the code is known as, a) Unit Testing b) Blackbox testing c) White box Testing d) Regression testing

c) White box Testing

10) What are the Testing Levels? a) Unit Testing b) Integration Testing c) System Testing and Acceptance Testing. d) All the above

d) All the above

29) What are the Types of Integration Testing? a) Big Bang Testing b) Bottom Up Testing c) Top Down Testing d) All the above

d) All the above

52) Defects generally fall into the following categories? a) WRONG b) MISSING c) EXTRA d) All the above

d) All the above

73) Optimization, Defect Prevention, and Quality Control. Its come under the a) CMM Level 2 b) CMM Level 3 c) CMM Level 4 d) CMM Level5

d) CMM Level5

74) Unit Testing will be done by a) Testers b) End Users c) Customer d) Developers

d) Developers

76) A Plan to overcome the risk called as a) Migration Plan b) Master plan c) Maintenance plan d) Mitigation Plan

d) Mitigation Plan

28) It measures the quality of a product It is a specific part of the QA procedure, It is a corrective process, It applies for particular product & Deals with the product. a) Validation b) Verification c) Quality Assurance d) Quality Control

d) Quality Control

67) The name of the testing which is done to make sure the existing features are not affected by new changes a) Recursive testing b) Whitebox testing c) Unit testing d) Regression testing

d) Regression testing

1) The approach/document used to make sure all the requirements are covered when writing test cases a) Test Matrix b) Checklist c) Test bed d) Traceablity Matrix

d) Traceablity Matrix


संबंधित स्टडी सेट्स

LUOA Dante's Inferno Cantos 9, 24, 26, 34 Review

View Set

CH5, CH3, Ch1, Chapter 2, Supplement A, CH 15, CH 7, Hm

View Set

8 Steps of Product Development Process

View Set

Visualisation and Exploratory Analysis (CS4250)

View Set

Tensor fasciae latae (TFL) and iliotibial tract

View Set