Struc Sys Analysis
Which of the following is NOT included as a total when using a weighted multi-criteria project?
) Department rankings
tangible benefit
A benefit derived from the creation of an information system that can be measured in dollars and with certainty.
If a project has a small or narrow focus , it most likely was chosen by
A business unit
Project management
A controlled process of initiating, planning, executing, and closing down a project.
is/are the final output from the analysis phase.
A description of the alternative solution
Project Scope Statement
A document that includes at least a description of the project, including its overall objectives and justification, detailed descriptions of all project deliverables, and the characteristics and requirements of products and services produced as part of the project
Bottom-up planning
A generic information systems planning methodology that identifies and defines IS development projects based upon solving operational business problems or taking advantage of some business opportunities.
Gantt Chart
A graphical representation of a project that shows each task as a horizontal bar whose length is proportional to its time for completion.
Object Class
A logical grouping of objects that have the same (or similar) attributes and behaviors (methods).
Critical Path Scheduling
A scheduling technique whose order and duration of a sequence of task activities directly affect the completion date of a project.
objective statement
A series of statements that express an organization's qualitative and quantitative goals for reaching a desired future position.
System Service Request
A standard form for requesting or proposing systems development work within an organization
Object
A structure that encapsulates attributes and methods that operate on those attributes
Which of the following is NOT a part of the project management process?
Adjoining
In which phase of the SDLC are the system requirements studied and structured?
Analysis
Design
Analysts converts the alternate solution into logical and physical specifications.
Constructive cost model
Automated software estimation model that uses historical project data and current as well as future project characteristics to estimate project costs.
Which of the following is NOT a feature of PERT?
Calculates budget for a project
If an organization is using applications rented from a third party vendor running in a remote location, they are most/likely using what type of software system?
Cloud computing
is an end product of an SDLC phase.
Deliverable
will mostly likely choose projects that are easy to integrate with the current hardware and software.
Development Group
solutions integrate individual traditional business functions into a series of modules so that a single transaction occurs seamlessly within a single information system rather than several separate systems.
ERP
Which of the following is NOT a characteristic of top management when choosing an IS project selection?
Faster development
A _, which is conducted by the project manager, involves determining if the information system makes sense for the organization from an economic and operational standpoint.
Feasibility Study
When an organization has the resources and a system must be built from scratch, an organization should choose what type of software?
In house development
The term ______ is used when a project is reviewed after each stage to determine its continuance.
Incremental Commitment
In which design phase of the SDLC are all functional features of the system chosen for development in analysis described independently of any computer platform?
Logical design
Planning
Need for new system is identified, analyzed, prioritized and arranged. Determine scope, and baseline project plan developed.
Systems development methodologies and techniques which are based on objects rather than data or processes are
Obiect-oriented analysis and design
Implementation
Occurs when the information system is coded, tested, installed, and supported by organization.
Which of the following is NOT a major category of sources of software?
Offshore
Baseline Project Plan (BPP)
One of the major outcomes and deliverables from the project initiation and planning phase. It contains the best estimate of the project's scope, benefits, costs, risks, and resource requirements.
A new hardware purchase is classified as a(n) __.
One time cost
Systems Analyst
Organizational role most responsible for analysis and design of information systems
What is the practice of a company running a computer app for another org?
Outsourcing
Joshua is a new project manager. He is unsure of how much time a new task will require to be completed on the project. He decides to use _____ to estimate a realistic time frame for the task.
PERT
Barry asked Jerry for a diagram that shows the sequence of dependencies between tasks. Barry is asking for a
PERT chart
PERT
Program Evaluation and Review Technique; uses optimistic, pessimistic, and realistic time estimates to calculate the expected time for a particular task.
The __ __ is a systems analyst with a diverse set of skills-management, leadership, technical, conflict management, and customer relationship-who is responsible for initiating, planning, executing, and closing down a project.
Project Manager
During _, the project manager performs several activities to assess the size, scope, and complexity of the profect and to establish procedures to support subsequent activities.
Project initiation
Which of the following is NOT a common criterion when choosing off-the-shelf software?
Reputation of them
refers to the use of previously written software resources, especially objects and components, in new applications.
Reuse
All of the following are categories of feasibility except
Scope ‼️ Technical scheduling Political
Nodes not on the critical path contain ____ time and allow the project manager some flexibility in scheduling
Slack time
Application Software
Software designed to support organizational function or process
Mission statement
Statement that makes it clear what business a company is in
Which of the following is NOT a primary activity in project identification ?
Stop current projects
Which evaluation criterion for classifying and ranking projects deals with helping an organization achieve its long-term
Strategic Aligment
Analysis
System requirements are studied from user input and structured. Output is description of the alternate solution recommend by the analysis team
Who has the primary responsibility for the design and analysis of information systems?
Systems analyst
comes from an information system that can be measured monetarily.
Tangible Benefit
Which of the following is NOT a basic reuse software step?
Testing
logical design
The design process part that is independent of any specific hardware or software platform
Project closedown
The final phase of the project management process that focuses on bringing a project to an end.
Which of the below is a true statement regarding the systems development life cycle?
The life cycle can be thought of as a circular process in which the end of the useful life of one system leads to the beginning of another project to develop a new version of or replace an existing system.
Maintenance
The phase when the system is repaired and improved.
Affinity Clustering
The process of arranging planning matrix information so that clusters of information with a predetermined level or type of affinity are placed next to each other on a matrix report.
Work Breakdown Structure (WBS)
The process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks.
Project planning
The second phase of the project management process that focuses on defining clear, discrete activities and the work needed to complete each activity within a single project.
Why is open-source software different than the other types of software?
The source code is free.
Project Execution
The third stage of the project management process; includes carrying out the actual project work
The systems development life cycle (SDLC)
The traditional methodology used to develop, maintain, and replace information systems. Features several phases that mark the progress of the systems analysis and design efforts
Ninety-four percent of companies report that they practice agile in their systems development efforts.
True
The Agile Methodologies focus on the roles that people perform rather than placing the emphasis on individuals.
True
Which of the following is NOT a guideline for better cost estimation?
Update estimates at end of project
When choosing a weighted system to determine project viability, what should the organization keep in mind?
Weights are subjective
All of the following are ways of validating purchased software information except
asking the manufacturer if they feel their software is best
one time cost
cost at beginning of project, happens once
Total Cost of Ownership (TCO) model
cost of owning and operating a system, acquisition and on going maintenance
Intangible costs
costs associated with info system, cannot be easily measured, not with certainty.
recurring cost
costs from evolution of system
tangible costs
costs with info system, can be measured in dollsrs with certainty
Projector Charter
document prepared for the customer during project invitation that describes what the project will deliver and outlines generally at a high level all work required to complete the project
Request for Proposal (RFP)
document provided to vendors asking them to propose hardware and system software that will meet the requirements of a new system
Deliverable
end product of an SDLC phase
Project Initiation
first phase of the project management process in which activities are performed to assess the size, scope, and complexity of the project and to establish procedures to support later project activities
Top-down planning
generic methodology that attempts to gain a broad understanding of the information systems needs of the entire organization
Inheritance
hierarchal arrangement of classes enabling subclasses to inherit properties of superclasses
Economic Feasibility
identifying costs and benefits of a project
e-commerce
internet based communication to support day to day government, business, and consumer activities
Competitive Strategy
method by which an org attempts to achieve its mission and objectives
time value of money
money made today is more valuable than the same amount tomorrow
Relational Unified Process (RUP)
object oriented systems development method
Corporate Strategic Planning
ongoing process that defines the mission, objectives, and strategies of an organization
Project workbook
online repository for all project-related documents that is used for performing project audits, orienting new team members, communicating with management and customers, identifying future projects, and performing post-project review
information systems planning
organization and defining new systems, databases, and technologies that will best satisfy those needs
Project
planned undertaking of related activities to reach an objective that has a beginning and an end
The critical path represents the ______ time in which a project can be completed.
shortest
Systems development methodology
standard process followed in an organization to conduct all the steps necessary to analyze, design, implement, and maintain information systems
feasability study
study that determines weather a requested system makes economic and operational sense for an org.
Project manager
systems analyst with a diverse set of skills-management, leadership, technical, conflict management, and customer relationship-who is responsible for initiating, planning, executing, and closing down a project.
Physical Design (SDLC)
the logical specifications of the system from logical design are transformed into the technology-specific details from which all programming and system construction can be accomplished
Cloud computing
the provision of computing resources, including applications, over the Internet, so customers do not have to invest in the computing infrastructure needed to run and maintain the resources
Outsourcing
turning over responsibilities for some or all of an organization's information systems applications and operations to an outside firm
Reuse
using previous software resources, especially objects and components, in new apps
Which of the following activities happens during the SDLC planning phase?
• A presentation of why the system should or should not be developed by the organization is given.
Information Systems Analysis and Design
• Defined as the complex, challenging, and simulating organizational process that a team of business and systems professionals uses to develop and maintain information systems
Which of the following is NOT a characteristic of a steering committee when making IS identification and selections?
• No concern with cost-benefit analysis
Which of the following is NOT a generic strategy identified by Porter?
• Product introduction
Which of the following is a critical factor that distinguishes agile methods from traditional approaches to systems development?
• Thrives in a culture where people feel empowered by having many degrees of freedom