Systems Analysis & Design (SAD) - Chapter 1+2 Study Guide
Structured analysis is a traditional systems development technique that uses a series of phases, called the ____, to plan, analyze, design, implement, and support an information system.
SDLC
Examines a firm's technical, human, and financial resources
SWOT analysis
Powerful software used in the development and maintenance of information systems
CASE tools
Many companies implement ____ systems that integrate all customerrelated events and transactions.
CRM
Analysis tool that is also referred to as a fishbone diagram
Ishikawa diagram
Electronic data interchange (EDI) enables ____ inventory systems, which rely on computertocomputer data exchange to minimize unnecessary inventory.
JIT
Widely used tool for visualizing issues that need attention
Pareto chart
Can identify a person by retina scan or by mapping a facial pattern
biometric device
The reasons, or justification, for a proposal
business case
Describes the information that a system must provide
business model
Set of transactions, events, and results that can be described and documented
business process
Graphical display of one or more business processes
business process model
Provides job-related information support to users at all levels of a company
business support system
Summary of a project request and a specific recommendation
case for action
Credential that verifies an individual has demonstrated a level of knowledge and skill
certification
A collection of similar objects
class
Group that is also known as a systems review committee
computer resources committee
Requirement or condition a system must satisfy or an outcome it must achieve
constraint
Set of beliefs, rules, traditions, values, and attitudes that define a company
corporate culture
Must be achieved to fulfill a company's mission
critical success factor
Includes perception, organization, analysis, and problem solving skills
critical thinking skills
Systems that integrate all customer-related events and transactions
customer relationship management
The basic facts that are a system's raw material
data
Demonstrates data flow, processing, and storage using various symbols and shapes
data flow diagram
Result of each phase in the waterfall model
deliverable
Projects where management has a choice in implementing them are called ____ projects.
discretionary
Projects where management has a choice in implementing them
discretionary projects
By questioning users about additional capabilities they would like to have, instead of focusing on difficulties, a systems analyst ____.
gets a better understanding of operations highlights ways to improve the user's job builds better, more positive relationships with users
Enables users to share data, collaborate on projects, and work in teams
groupware
Everything in the physical layer of the information system
hardware
A systems request form should not ____.
have complex instructions
System that can be adapted for use in many different types of companies
horizontal system
A common reason for systems requests is ____.
improved services better performance reduced cost
Logical rules that identify data patterns and relationships
inference rules
Data that has been transformed into output that is valuable to users
information
System comprised of hardware, software, data, processes, and people
information system
Combination of hardware, software, and services used for managing information
information technology
Advantages that are difficult to measure in dollars but are important to a company
intangible benefits
Costs that are difficult to measure in dollars but are important to a company
intangible costs
Primary method of obtaining information during the preliminary investigation
interview
An example of a horizontal system is a(n) ____.
inventory application payroll application
Team-based strategies with a focus on team-based fact-finding
joint application development
Database that allows users to find information by entering keywords or questions
knowledge base
When planning an information system, a company must consider how a new system will interface with older systems, which are called ____.
legacy systems
An example of a vertical system is a(n) ____.
medical practice application database for a video chain
In objectoriented design, builtin processes called ____ can change an object's properties.
methods
Reflects a firm's vision, purpose, and values
mission statement
____ is a systems development technique that produces a graphical representation of a concept or process that systems developers can analyze, test, and modify.
modeling
Projects where management has no choice in implementing them
nondiscretionary projects
Possesses properties it inherits from its class or possesses on its own
object
The ____ method of developing systems produces code that is modular and reusable.
object-oriented analysis
Means that a proposed system will be used effectively after it has been developed
operational feasibility
Of the measures of feasibility, ____ considers questions such as "Does management support the project?" and "Will the new system require training for users?"
operational feasibility
Conducted to study a systems request and recommend a specific action
preliminary investigation
Process of projects expanding gradually without specific authorization
project creep
Defines the specific boundaries, or extent, of a project
project scope
An early working version of an information system
prototype
Uses high-frequency radio waves to track physical objects
radio frequency identification
Systems analysis phase where business processes are investigated
requirements modeling
A system design that can expand to meet new business requirements and volumes
scalable design
Problem-solving tool that is sometimes referred to as a XY chart
scatter diagram
Means that a project can be implemented in an acceptable time frame
schedule feasibility
A large concentration of servers working together
server farm
A common name for the user support function
service desk
Programs that control the hardware and produce the desired information or result
software
A systems analyst needs ____.
solid technical knowledge and good analytical ability strong oral and written communication skills an understanding of business operations and processes
Agile methods typically use a(n) ____model, which represents a series of iterations based on user feedback.
spiral
Model representing a series of iterations, or revisions, based on user feedback
spiral model
Person who has an interest in an information system
stakeholder
____ planning is the process of identifying longterm organizational goals, strategies, and resources.
strategic
Process of identifying long-term organizational goals
strategic planning
Long-range plans that define the company's overall mission and goals
strategic plans
Traditional, time-tested, and easy to understand systems development technique
structured analysis
A set of related components that produces specific results
system
Deliverable for the systems design phase
system design specification
Deliverable for the systems analysis phase
system requirements document
Software, such as operating systems, that manages the hardware components
system software
Step-by-step process for developing high-quality information systems
systems analysis and design
Phase of the SDLC model whose purpose is to build a logical model
systems analysis phase
Member of the IT department who helps plan, develop, and maintain systems
systems analyst
Phase of the SDLC model whose purpose is to create a physical model
systems design phase
Typically starts with a systems request
systems development
In the SDLC, during ____, the new system is constructed.
systems implementation
In the SDLC methodology , which phases do NOT involve the IT staff maintaining, enhancing, and protecting the system?
systems implementation systems analysis systems planning
Phase of the SDLC model whose objective is to deliver a functioning system
systems implementation phase
In the SDLC, the ____ usually begins with a formal request to the IT department, called a systems request, which describes problems or desired changes in an information system or a business process.
systems planning phase
Phase of the SDLC model whose purpose is to perform a preliminary investigation
systems planning phase
Formal request to the IT department that describes problems or desired changes
systems request
Formal way of asking for IT support and starting point for most projects
systems request
Group of key managers and users responsible for evaluating systems requests
systems review committee
Benefits that can be measured in dollars
tangible benefits
Costs that can usually be measured in dollars
tangible costs
A feasibility study includes tests for ____ feasibility, which refers to the practical resources needed to develop, purchase, install, or operate the system.
technical
Which feasibilities do NOT mean the proposed system will be used effectively after it has been developed.
technical schedule economic
Technical resources needed to develop, purchase, install, or operate a system
technical feasibility
____ is/are an external factor(s) that affect(s) IT systems projects.
technology competitors suppliers
A business process describes a specific set of ____.
transactions events results
Database administration involves ____.
user access data design backup
Fact-finding form that users complete and return for tabulation
user survey
Designed to meet the unique requirements of a specific business or industry
vertical system
Important problem-solving tool that shows a correlation between variables
xy chart
Over 40 years ago, a concept called Moore's Law accurately predicted that computer processing power would double about every ____ months.
24
Which of the following is one of the main sectors of ecommerce?
B2C
Development method that includes the latest trends in software development
adaptive methods
Supports day-to-day business functions and provides information users need
application software
A feasibility study includes tests for ____ feasibility, which means that the projected benefits of the proposed system outweigh the estimated costs.
economic
Means the projected benefits of a proposed system outweighs the estimated costs
economic feasibility
Internet-based commerce
electronic commerce
Data sharing agreement between companies
electronic data interchange
Technology that uses RFID tags to identify and monitor the movement of products
electronic product code
Trend that gives employees more responibility and accountability
empowerment
Security control that codes data to keep it safe from unauthorized users
encryption
Systems that support company-wide operations and data management requirements
enterprise computing
Examines operational, technical, economic, and schedule factors
feasibility study
Key part of the preliminary investigation that reviews anticipated costs and benefits
feasibility study
In the preliminary investigation report, the ____ section contains the results of the preliminary investigation, including a description of the project's scope, constraints, and feasibility.
findings
When using a ____ diagram to investigate causes of a problem, an analyst first states the problem and then draws a main bone with subbones that represent possible causes of the problem.
fishbone
Analysis tool that represents possible causes of a problem as a graphical outline
fishbone diagram