The 33 (movie questions)

अब Quizwiz के साथ अपने होमवर्क और परीक्षाओं को एस करें!

What new strategy do the rescuers adopt to try to reach the men with their drills?

"Aim to miss"

How many days worth of food and water do the men have as provisions to survive?

3 days

How long were the men trapped underground before their rescue?

69 days

What safety precautions do they take to let them know if the mine is unstable or shifting?

Broken Mirrors

When does the rescue team project they will get the men out?

By Christmas

What South American country does the movie take place?

Chile

What precious mineral are the miners digging for?

Copper-Gold

What day of the rescue do the drills miss where the miners are trapped by a mere 10 meters?

Day 12

What day did the drill reach the men trapped in the mine?

Day 33

Who is the last of the 33 miners to be brought to the surface?

Don Lucho

What did each of the surviving miners receive from the company as compensation?

Each got absolutley nothing

Who is there to meet the first miner when he gets to the surface?

His wife and new baby daughter

How old is the mine?

Over 100 years old

What is the name of the capsule that will bring each of the miners to the surface?

Phoenix

What is the name of the mine where the men are trapped?

San Jose Mine

What is the significance of the title of the movie, "the 33"?

That is the total number of miners who were trapped

When the mine begins to collapse around them, where do all the miners and workers head?

The "refuge"

What is the plan to get the trapped men out of the mine?

The government and engineers bring in 10 massive drills running 24 hours a day to reach the men

How big is the rock that collapsed the mine?

The size of two empire state buildings

What type of food must the men share and stretch out as long as they can to survive?

Tuna


संबंधित स्टडी सेट्स

Economics chapters 4 quiz questions

View Set

Final Exam (Semester A) - World History

View Set

Chapter 9: Production and Operations Management

View Set

Module 8 - Databases [Knowledge Check]

View Set

Chapter 9 - Flexible Budgets and Performance Analysis Assignment

View Set