ACCT Test 3

Lakukan tugas rumah & ujian kamu dengan baik sekarang menggunakan Quizwiz!

Standard Quantity/Hours Allowed

(when computing Direct Material/DL and VOH variances) refers to the amount of an input that should have been used to manufacture the actual output of finished goods produced during the period. Computed by multiplying the actual output by the standard quantity per unit. Standard quantity allowed is then multiplied by the standard price per unit of the input to obtain the total cost according to the flexible budget

3 common approaches used to set transfer prices

1. Allow the managers involved in the transfer to negotiate the transfer price 2. set transferred prices at cost using either variable cost or full (absorption cost) 3. set transfer prices at the market price

Disadvantages of Decentralization

1. Lower level managers may make decisions without fully understanding the company's overall strategy 2. If lower level managers make their own decisions independently of each other, coordination may be lacking 3. Lower level managers may have objectives that clash with the objectives of the entire organization. 4. Spreading innovative ideas may be difficult in a decentralized organization.

Advantages of Decentralization

1. by delegating day to day problem solving to lower level managers, top manage,net can concentrate on bigger issues 2. Empowering lower level managers to make decisions puts the decision making authority in the hands of those who tend to have the most detailed and up to ate information about day to day operations. 3. By eliminating layers of decision making and approvals, organizations can respond more quickly to customers and to changes in the operating environment 4. Granting decision making authority helps train lower level managers for higher level positions 5. Empowering lower-level managers to make decisions can increase their motivation and job satisfaction

Performance measures of balanced scorecard

1. financial-> "has our financial performance improved?" 2. customer -> "do customers recognize that we are delivering more value?" 3. Internal business processes-> "have we improved key business processes so that we can deliver more value to customers?" 4. learning and growth -> "are we maintaining our ability to change and improve?"

Procedure to strengthen chain

1. identify the weakest link, the constraint. 2. Do not place a greater strain on the system than the weakest link can handle. if you do, the chain will break. 3. concentrate improvement efforts on strengthening the weakest link. 4. if the improvement efforts are successful, eventually the weakest link will improve to the point where it is no longer the weakest link

Why isolate relevant costs?

1. only rarely will enough info be available to prepare a detailed income statement for both alternatives. 2. mingling irrelevant costs with relevant costs may cause a confusion and distract attention from the information that is real critical. The danger always exists that an irrelevant piece of data may be used improperly resulting in an incorrect decision.

Advantages od negotiated transfer price

1. preserves the autonomy of the divisions and is consistent with the spirit of decentralization. 2. the managers of the divisions are limey to have much better information about the potential costs and benefits of the transfer than others in the company.

Things we can predict

1. the selling division will agree to the transfer only if it's profits increase as a result of the transfer 2. the buying division will agree to transfer only if it's profits also increase as a result of the transfer. If transfer price is below the selling division cost, selling division incurs a loss on the transaction (will refuse it) If transfer prie is set too high it will be impossible for the buying division to make any profit on the transferred item

Criticisms of ROI

1.managers may increase ROI in a way that is inconsistent with the company's strategy; or they may take actions that increase ROI in the short run but harm the company in the long run. 2. a manager who takes over a business inherits many committed costs over which the manager has no control. these costs may be relevant in assessing the performance of the business segment as an investment but they make it difficult to fairly assess the performance of the manager 3. manager evaluated based on ROI may reject investment opportunities that are profitable for the whole company but would have a negative impact on the manager's performance evaluation

Volume Variance

=Budgeted Fixed overhead - Fixed overhead applied to WIP (POHR x standard hours) Budgeted > FOH = unfavorable Bugeted < FOH = favorable =Fixed component of POHR x (Denominator hours - Standard hours allowed for the actual output) Denominator hours > standard hours for actual output = unfavorable (if actual level of activity is less than expected) Denominator hours < standard hours for actual output = favorable (if actual level of activity is greater than expected) viewed as a measure of the utilization of facilities - standard hours > denominator hours = efficient use of facilities -standard hours < denominator hours = insufficient use of facilities

Which of the following scenarios demonstrates the leverage effect on net operating income due to the existence of fixed costs?

A 25% increase in sales resulting in a 30% increase in net operating income. The percentage of increase in net operating income is ordinarily larger than the percentage of increase in activity. This is a result of the existence of fixed costs, which cause a leverage effect.

What is a revenue variance and what does it mean?

A revenue variance is the difference between the actual revenue for the period and how much the revenue should have been, given the actual level of activity. A revenue variance is easy to interpret. A favorable revenue variance occurs because the revenue is greater than expected for the actual level of activity. An unfavorable revenue variance occurs because the revenue is less than expected for the actual level of activity.

What is a spending variance and what does it mean?

A spending variance is the difference between the actual amount of the cost and how much a cost should have been, given the actual level of activity. Like the revenue variance, the interpretation of a spending variance is straight-forward. A favorable spending variance occurs because the cost is lower than expected for the actual level of activity. An unfavorable spending variance occurs because the cost is higher than expected for the actual level of activity.

Paradise Company's planning budget for 10,000 units showed sales of $500,000. The flexible budget for 12,000 units showed sales of $600,000. What is the variance of $100,000 called if this variance was due only to an increase in unit sales?

Activity variance Variances caused solely because of the differences in the level of activity are called activity variances.

Standard Quantity Allowed for Actual Output

Actual Output x Standard Quantity

What is an activity variance and what does it mean?

An activity variance is the difference between a revenue or cost item in the flexible budget and the same item in the static planning budget. An activity variance is due solely to the difference in the actual level of activity used in the flexible budget and the level of activity assumed in the planning budget. Caution should be exercised in interpreting an activity variance. The "favorable" and "unfavorable" labels are perhaps misleading for activity variances that involve costs. A "favorable" activity variance for a cost occurs because the cost has some variable component and the actual level of activity is less than the planned level of activity. An "unfavorable" activity variance for a cost occurs because the cost has some variable component and the actual level of activity is greater than the planned level of activity.

Leverage effect

Because of fixed costs, NOI does not change in proportion to changes in the level of activity. The % changes in NOI are ordinarily larger than the percentage increase in activity

Budget Solutions has determined from its flexible budget that selling costs for actual level activity for a period should have been $25,000. Actual selling costs incurred during the period were $28,000. What is the amount and direction of variance in selling costs?

Budget Solutions has determined from its flexible budget that selling costs for actual level activity for a period should have been $25,000. Actual selling costs incurred during the period were $28,000. What is the amount and direction of variance in selling costs? your answer: $0 correct answer: $3,000 Unfavorable feedback:

Fixed Cost

Cause a leverage effect. consequence of changes in the level of activity fixed costs stay the same

Revenue Variance

Difference between actual revenue and what is should have been is the difference between the actual total revenue and budgeted total revenue at the actual level of activity.

Activity Variances

Difference between flexible budget and planning budget

Predetermined overhead Rate

Estimated total manufacturing overhead cost/ Estimated total amount of the allocation base

When is Revenue variance favorable/unfavorable?

F when the average selling price is greater than expected; U when the avg selling price is less than expected.

A planning budget is prepared to determine the costs that should have been incurred for the actual level of activity during the period.

FALSE

Calculating Rev & Spending Variances

Flexible Budget vs. Actual Budget

Calculating Activity Variances

Flexible Budget vs. Planning Budget

If variable manufacturing overhead is applied to production on the basis of DLH and the direct labor efficiency is unfavorable, will the variable overhead efficiency variance be favorable, unfavorable or could it be either? Explain.

If overhead is applied on the basis of direct labor-hours, then the variable overhead efficiency variance and the direct labor efficiency variance will always be favorable or unfavorable together. Both variances are computed by comparing the number of direct labor-hours actually worked to the standard hours allowed. That is, in each case the formula is: Efficiency variance = SR(AH - SH) Only the "SR" part of the formula, the standard rate, differs between the two variances.

What effect, if any, would you expect poor-quality materials to have on direct labor variances?

If poor quality materials create production problems, a result could be excessive labor time and therefore an unfavorable labor efficiency variance. Poor quality materials would not ordinarily affect the labor rate variance.

What does a flexible budget performance report do that a simple comparison of budgeted to actual results does not do?

In a flexible budget performance report, the actual results are not directly compared to the static planning budget. The flexible budget is interposed between the actual results and the static planning budget. The differences between the flexible budget and the static planning budget are activity variances. The differences between the actual results and the flexible budget are the revenue and spending variances. The flexible budget performance report cleanly separates the differences between the actual results and the static planning budget that are due to changes in activity (the activity variances) from the differences that are due to changes in prices and the effectiveness with which resources are managed (the revenue and spending variances).

Sell or process further decisions

It is profitable to continue processing a joint product after the split off point so long as the incremental revenue from such processing exceeds the incremental processing cost incurred after the split off point.

Margin

Margin is ordinarily improved by increasing selling prices, reducing operating expenses, or increasing unit sales. --> increasing SP increases NOI and therefore margin. --> increases unit sales

Khan Corporation has budgeted the unit sales for April to be 5,000 units. The sales price is $25 per unit, and production costs are $10 per unit. Monthly utility expenses are estimated to be $2,000 plus $2 per unit, whereas selling expenses are estimated to be $12,000. The company pays a monthly rent of $2,000. What is the net operating income in the company's planning budget?

Net operating income on the planning budget for 5,000 units would be $49,000. $49,000 = $13 contribution margin × 5,000 units - fixed expenses of $16,000.

Overhead applied

Overhead applied= POHR x standard hours allowed for the actual output overhead is applied to WIP on the basis of the standard hours allowed for the actual output of the period rather than on the basis of the actual number of hours worked

Variance Analysis Cycle

Prepare performance chart -> Analyze variances -> Raise Questions -> Identify root causes -> Take actions -> Conduct next period's operations

"Our workers are all under labor contracts; therefore, our labor rate variance is bound to be zero." Discuss.

Several factors other than the contractual rate paid to workers can cause a labor rate variance. For example, skilled workers with high hourly rates of pay can be given duties that require little skill and that call for low hourly rates of pay, resulting in an unfavorable rate variance. Or unskilled or untrained workers can be assigned to tasks that should be filled by more skilled workers with higher rates of pay, resulting in a favorable rate variance. Unfavorable rate variances can also arise from overtime work at premium rates.

Standard cost per unit

Standard Quantity per unit x standard price per unit

Delivery Time Cycle

The amount of time from when a customer order is received to when the completed order is shipped. Important concern to many customers who want this time to be as short as possible. Delivery Cycle Time= Wait Time + Throughput Time

Khan Corporation has budgeted the unit sales for April to be 5,000 units. The sales price is $25 per unit, and production costs are $10 per unit. Monthly utility expenses are estimated to be $2,000 plus $2 per unit, whereas selling expenses are estimated to be $12,000. The company pays a monthly rent of $2,000. What would be the utility expenses on the company's flexible budget if actual unit sales for April were 6,000 units?

The amount of utility expenses on the flexible budget for 6,000 units would be $14,000. $14,000 = $2,000 + ($2 × 6,000 units).

If the materials price variance is favorable but the materials quantity variance is unfavorable. what might this indicate?

This combination of variances may indicate that inferior quality materials were purchased at a discounted price, but the low-quality materials created production problems.

Buyer's perspective

Transfer price <= Cost of buying from outside supplier OR Transfer price <= Profit to be earned per unit sold (not including transfer price)

Sellers Perspective

Transfer prive >= Variable Cost per unit+ (Total CM loss on sales/Number of units transferred)

Standard

a bench mark for measuring performance relate to the quantity and acquisition price of inputs used in manufacturing goods or providing services

Avoidable Cost

a cost that can be eliminated by choosing one alternative over another relevant and should not be ignored

Sunk Cost

a cost that has already been incurred and cannot be avoided regardless of what a manager decides to do -depreciation because it is a non-cash expense that spreads the cost of the truck over it's useful life Sunk costs are always the same and should always be ignored

Make or buy decision

a decision to carry out one of the activities in the value chain internally, rather than to buy externally from a supplier

Operating department

a department in which the central purposes of the organization are carried out

Service department

a department that does not directly engage in operating activities; rather it provides services or assistance to the operating department

Why is it difficult to interpret a difference between how much expense was budgeted and how much was actually spent?

a difference between the budget and actual results can be due to many factors. Most importantly, the level of activity can have a very big impact on costs. From a manager's perspective, a variance that is due to a change in activity is very different from a variance that is due to changes in prices and changes in how effectively resources are managed. A variance of the first kind requires very different actions from a variance of the second kind. Consequently, these two kinds of variances should be clearly separated from each other. When the budget is directly compared to the actual results, these two kinds of variances are lumped together.

Management by exception

a management system that compares actual results to a budget so that significant deviations can be flagged as exceptions and investigated further

Special Order

a one time order that is no considered part of the company's normal ongoing business.

Economic Value Added

an adaptation of residual income. companies often modify their accounting principles in various ways

Depreciation

an assets net book value decreases over time as the accumulated depreciation increases. This decreases the denominator in the ROI calculation, increasing ROI.

Flexible Budget

an estimate of what revenues and costs should have been, given the actual level of activity for the period. compared to what should have been for the actual level of activity during the period rather than to the planning budget.

Responsibility Center

any part of an organization whose manager has control over and is accountable for cost, profit or investments.

Constraint (bottleneck)

anything that prevents you from getting more of what you want/ ex. time determined by the step that limits the total output because it has the smallest capacity

Disadvantage of the residual approach

cannot be used to compare the performance of divisions of different styles. Larger divisions often have more residual income than smaller divisions.

Balanced Scorecard

consists of an integreated set of performance measures that are derived from and support a company's strategy.

Different costs for different purposes

costs that are relevant in one decision situation are not necessarily relevant in another.

Decentralized Organization

decision making authority is spread throughout the organization rather than being confined to a few top executives.

Spending Variance

difference between how much was actually spent and what should have been spent to achieve the actual level of activity is the difference between the actual cost and budgeted cost at the actual level of activity.

Differential cost (relevant costs)

difference in cost between any two alternatives

Differential revenue (relevant benefits)

difference in revenue between any two alternatives

Key to maximizing the total CM when cutting back on a product

favor the products that provide the highest contribution margin per unit of the constrained resource

Differential Analysis

focusing on the costs and benefits that differ between the alternatives

Profit Center

has control over both costs and revenue, but not over the use of investment funds. profit center managers are evaluated by comparing actual profit to budgeted profit

Investment Center

has control over cost, revenue, and investments in operating assets. evaluated using return on investment or residual income measures

Cost Center

has control over costs, but not over revenue or the use of investment funds. ex. service departments: accounting finance, general administration, legal, and personnel expected to minimize cost while providing the level of products and services demanded by other parts of the organization. -standard cost variances and flexible budget variances are sued to evaluate cost center performance

Manufacturing Cycle Efficiency (MCE)

helps reduce the delivery cycle time from months to only weeks or hours. MCE= Process Time (value-added time)/Throughput Time

Labor rate variance

in the case of DL measures the difference between the actual hourly rate and the standard hourly rate multiplied by the actual number of hours worked during the period (AH x AR) - (AH x SR) AH= AQ used in production AR= AP (actual rate per DLH) SH= SQ of hours allowed for actual output SR= AP (standard rate per DLH) Actual > Standard = unfavorable Actual < Standard = Favorable

Variable overhead rate variance

in the case of VOH measures the difference between the actual variable overhead cost incurred during the period and the standard cost that should have been incurred based on the actual activity of the period (AH x AR) - (AH x SR)

Operating Assets

include cash, accounts receivable, inventory, plant and equipment, and all other assets held for operating purposes. Most companies use the net book value approach to computing average operating assets

Net Operating Income

income BEFORE interest and taxes (EBIT- earnings before interest and taxes)

Turnover

incorporates a crucial area of a managers responsibility-- the investment in operating assets. Excessive funds tied up in operating asses depress turnover and lower ROI.

Buying Divisons highest acceptable transfer price

intererst in transfer only if it's profit increases. In cases where a buying division has an outside supplier, buying division will buy from the inside supplier if the price is less than the price offered by the outside buyer

Labor Efficiency Variance

measures the difference between the actual hours used and the standard hours allowed for the actual output multiplied by the standard hourly rate (AH x SR) - (SH x SR)

Variable Overhead Efficiency Rate Variance

measures the difference between the actual level of activity and the standard activity allowed for the actual output, multiplied by the variable part of the POHR (AH x SR) - (SH x SR)

Materials Quantity Variance

measures the difference between the actual quantity of materials used in production and the standard quantity of materials allowed for the actual output. AP x SQ - SQ x SP Actual > Standard = unfavorable Actual < Standard = favorable

Return on Investment (ROI)

net operating income divided by average operating assets. =NOI/avg operating assets also =Margin x Turnover where Margin= NOI/Sales and Turnover = Sales/Avg Operating Assets The higher the ROI, the greater the profit earned per dollar invested in the segment's operating assets. manager evaluated on ROI will reject any project whose rate of return is below the current ROI even if the rate of return on the project is above the company's minimum required rate of return

suboptimization

occurs when managers do not act in the best interests of the overall company or even in the best interests of their own division.

Favorable vs Unfavorable

positive = unfavorable negative = favorable AP > SP = unfavorable price variance AP < SP = favorable price variance AQ > SQ = unfavorable quantity variance AQ < SQ = favorable quantity variance

Planning Budget

prepared before the period begins and is only valid for only the planned level of activity.

Materials Price Variance

price variance for DM measures the difference between an input's actual price and standard price multiplied by actual quantity purchased AP x AQ - AP x SQ Actual < Standard = unfavorable Actual > Standard = favorable

Negotiated transfer price

results from discussions between the selling and buying divisions.

Standard Cost Card

shoes the standard quantity (or hours) and standard price (or rate) of the inputs required to produce a unit of a specific product. Inputs: SQ SP Standard Cost DM DL VOH Total

Future Costs

should be ignored if the do not differ between alternatives.

Quantity Standards

specify how much should be paid for each unit of an input

Standard hours per unit

the amount of direct labor hors that should be used to produce one unit of finished goods. for VOH- measures the amount of allocation base from a company's POHR that is required to produce one unit of finished goods

Standard quantity per unit

the amount of direct materials that should be used for each unit of given product, including for an allowance for normal inefficiencies

Queue Time

the amount of time a product spends waiting to be worked on, to be moved, to be inspected, or to be shipped

Throughput (Manufacturing Cycle) Time

the amount of time required to turn raw materials into completed products. Throughput Time= Process Time + Inspection Time + Move Time + Queue Time

Inspection Time

the amount of time spent ensuring that the product is not defective

Process Time

the amount of time work is actually done on the product

Standard rate per hour

the company's expected direct labor wage rate per hour =Variable portion of POHR

Quantity Variance

the difference between how much of an input was actually used and how much should have been used and is stated in dollar terms using the standard price of input.

Spending Variance

the difference between the actual amount of the cost and how much a cost should have been, given the actual level of activity. Actual Cost > Budget Cost = Unfavorable Actual Cost < Budgeted Cost = Favorable

Price Variance

the difference between the actual amount paid for an input and the standard amount that should have been paid, multiplied by the actual amount of the input purchased.

Budget Variance

the difference between the actual fixed manufacturing overhead and the budgeted fixed manufacturing overhead for the period. =Actual - Budgeted Actual > Budgeted = unfavorable Actual < Budgeted = favorable

Activity Variances

the difference between the actual level of activity and the level of activity in the planning budget from the beginning of the period

Revenue Variance

the difference between the actual total revenue and what the total revenue should have bee, given the actual level of activity for the period Actual > Budgeted = Favorable Actual < Budgeted = Unfavorable

Denominator Activity

the estimated total amount of the allocation base in the formula for POHR

Residual Income

the net operating income that an investment center earns above the minimum required return on it's operating assets NOI -(avg operating assets x minimum required rate of return) encourages managers to make investments hat are profitable for the entire company but that would be rejected by managers who are evaluated using the ROI formula

Split off point

the point in the manufacturing process at which the joint products can be recognized as separate products

Opportunity Costs

the potential benefit that is given up when one alternative is selected over another. relevant and should not be ignored.

Market price

the price charged for an item on the open market

Transfer Price

the price charged when one segment of a company provides goods or services to another segment of the same company

Standard price per unit

the price that should be paid for each unit of direct materials and it should reflect the final. delivered cost of those materials.

Range of acceptable transfer prices

the range of transfer prices within which the profits of both divisions participating in a transfer would increase

Move Time

the time required to move materials or partially completed products from workstation to workstation

Common Errors

thinking all costs are fixed or all costs are variable

What is the fundamental objective in setting transfer prices?

to motivate the managers to act in the best interests of the overall company.

Joint products

two or more products that are produced from a common input

Flexible Budget

used to account for changes in cost due to changes in an activity. tells us what revenues and costs should have been for actual level of activities -measures performances -identifies discrepancies between budgeted and actual costs

Joint cost

used to describe the costs incurred up to the split off point

Vertically integrated

when a company is involved in more than one activity in the entire value chain.

Relaxing (or elevating) the constraint

when a manager increases the capacity of the bottleneck


Set pelajaran terkait

Financial Accounting Module 6 - Analyzing Financial Statements

View Set

Chapter 1: ENV Problems, Their Causes, and Sustainability

View Set

BISC 104 Mastering Biology Chapter 7

View Set