Block XV - NALCOMIS & OOMA/OIMA

Lakukan tugas rumah & ujian kamu dengan baik sekarang menggunakan Quizwiz!

Job Control Number (JCN):

9-11 character alphanumeric code that allows for separate identification of each maintenance action.

In regards to a WO what do the following acronyms stand for?

- DM, Discrepancy Maintenance - TS, Troubleshooting - CM, Cannibalization Maintenance - AD, Assist Maintenance - FO, Facilitate Other Maintenance - CL, Conditional Look Phase - CF, Conditional Fix Phase - SX, Special Inspection one workcenter - SC, Special Inspection Control - TD, Technical Directive

What modules does OOMA consist of?

- Maintenance subsystem - Material subsystem - Flight subsystem - Platform software interface - CM/Logs and records subsystem

What are some of the responsibilities of maintenance/production control?

- Monitor aircraft/equipment status. - Monitor and set workcenter priorities. - Reporting of configuration, material readiness, and flight data. - Brief pilots/aircrew prior to an FCF. - Ensure Work Orders (WO) iniated for each discrepancy. - Review, update and approve all WOs. - Reviews, approves, or rejects the corrective action block of the WO. - Assigns the project/priority code for each requisition. -Facilitation of Automated Aircraft Discrepancy Book (AADB) and workcenter workload report.

What does OOMA track?

- NMCS/PMCS status - Flyable discrepancies - Non-aircraft related discrepancies - ALSS status - SE status - Mission Mounted Equipment (MME) status

Work Unit Code (WUC):

A numeric or alpha-numeric code that identifies the system or subsystem of the malfunction.

Accumulated Job Status History:

History of the WO from start to finish.

What does NALCOMIS stand for? What does the system do?

Naval Aviation Logistics Command Management Information System -Provides the capability to manage maintenance and supply functions and processes by allowing system users to enter, collect, process, store, review and report information required by the organization.

What is OOMA?

Optimized Organizational Maintenance Activity

Type Maintenance:

Prefilled based on the type of WO selected.

What does Optimized IMA provide?

Provides the capability to manage maintenance and supply functions and processes at the intermediate level.

Workcenter:

This identifies the workcenter responsible to complete the maintenance action.

Worker Hours:

To include the workers name, tools used, the QA/CDI that inspected them and the hours they worked.

Type WO:

Two character code that describes the type of maintenance to be performed.


Set pelajaran terkait

Ethos, Pathos, Logos Practice and Examples

View Set

Animal and Plant Cells - Assignment

View Set

Microeconomics Exam 1; Chapter 4

View Set

Chapter 5 Thermal Energy Problems (Math)

View Set