Chapter 13 - Multiple choice

Lakukan tugas rumah & ujian kamu dengan baik sekarang menggunakan Quizwiz!

C

21) The four kinds of structural organizational change enabled by IT, in order from least to most risky, are A) rationalization, automation, reengineering, and redesigning. B) rationalization, automation, reengineering, and paradigm shift. C) automation, rationalization, reengineering, and paradigm shift. D) automation, redesigning, restructuring, and paradigm shift.

D

22) In automation A) business processes are simplified. B) business processes are reorganized to cut waste and eliminate repetitive, paper-intensive tasks. C) standard operating procedures are streamlined to remove bottlenecks. D) employees are enabled to perform their tasks more efficiently.

A

23) Business processes are analyzed, simplified, and redesigned in A) business process redesign. B) rationalization of procedures. C) automation. D) paradigm shifts.

B

24) A bank has reworked its mortgage application process so that several steps are handled by computer software, and some steps are combined to reduce bottlenecks in processing. The goal is to gradually improve its efficiency over time. This is an example of A) automation. B) rationalization of procedures. C) paradigm shift. D) business process redesign.

C

25) An upscale organic foods grocery chain is implementing an information system that will enable it to add same-day home delivery of groceries to its customers. This is an example of A) automation. B) rationalization of procedures. C) paradigm shift. D) business process redesign.

D

26) The idea that the achievement of quality control is an end in itself describes a main concept of A) BPM. B) BPR. C) six sigma. D) TQM.

B

27) ________ provide(s) a methodology and tools for dealing with the organization's ongoing need to revise and optimize its numerous business processes. A) Business process redesign B) Business process management C) CASE tools D) TQM

A

28) Which conversion process introduces the system first to a limited portion of the organization? A) the pilot study strategy B) the phased approach strategy C) the limited cutover strategy D) the parallel strategy

A

29) In order, what are the first three steps in BPM? A) 1. identifying processes for change, 2. analyzing existing processes, 3. designing the new process. B) 1. analyzing existing processes, 2. identifying processes for change, 3. designing the new process. C) 1. identifying processes for change, 2. designing the new process, 3. implementing the new process. D) 1. analyzing processes to change, 2. designing the new process, 3. measuring the optimized process.

D

30) What is the greatest barrier to successful business process change? A) ineffective project management B) usability of implemented solution C) selecting the correct process to change D) organizational change

D

31) Categories of tools for BPM include all of the following except A) tools to integrate existing systems to support business processes' improvements. B) tools to automate business processes. C) tools to identify and document business processes. D) tools to test the security of business processes.

B

32) Which process develops a detailed description of the functions that a new information system must perform? A) feasibility study B) requirements analysis C) systems design D) test plan development

B

33) Systems design A) describes what a system should do to meet information requirements. B) shows how the new system will fulfill the information requirements. C) identifies which users need what information, where, when and how. D) is concerned with the logical view of the system solution.

A

34) What is the purpose of responsive Web design? A) It allows one Web site to serve different platforms, such as tablets, PCs, and mobile phones. B) It allows Web sites to respond quickly to changing user needs. C) It enables Web sites to customize design according to user preferences. D) It enables Web sites to customize content based on user location and preferences

D

35) Transferring data from a legacy system to the new system would be defined by which category of system design specifications? A) input B) database C) manual procedures D) conversion

B

36) Which of the following is not an example of fourth generation development tools? A) Microsoft Excel B) graphics software, such as Photoshop C) report generator D) very high-level programming language

D

37) The entire system-building effort is driven by A) organizational change. B) feasibility studies. C) the information value chain. D) user information requirements.

C

38) Unit testing A) includes all the preparations for the series of tests to be performed on the system. B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned. C) tests each program separately. D) provides the final certification that the system is ready to be used in a production setting.

B

39) System testing A) includes all the preparations for the series of tests to be performed on the system. B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned. C) tests each program separately. D) provides the final certification that the system is ready to be used in a production setting.

D

40) Acceptance testing A) includes all the preparations for the series of tests to be performed on the system. B) tests the functioning of the system as a whole in order to determine if discrete modules will function together as planned. C) tests each program separately. D) provides the final certification that the system is ready to be used in a production setting.

C

41) In a parallel conversion strategy, the new system A) is tested by an outsourced company. B) replaces the old one at an appointed time. C) and the old are run together. D) is introduced in stages.

B

42) In the direct cutover conversion strategy, the new system A) is tested by an outsourced company. B) replaces the old one at an appointed time. C) and the old are run together. D) is introduced in stages.

C

43) Changes in hardware, software, documentation, or production to a production system to correct errors, meet new requirements, or improve processing efficiencies are termed A) compliance. B) production. C) maintenance. D) acceptance.

B

44) In what stage of systems development are design specifications created? A) systems analysis B) systems design C) testing D) conversion

D

45) The primary tool for representing a system's component processes and the flow of data between them is the A) data dictionary. B) process specifications diagram. C) user documentation. D) data flow diagram.

A

46) An entire information system is broken down into its subsystems by using A) high-level data flow diagrams. B) low-level data flow diagrams. C) process specifications. D) structured diagrams.

A

47) To understand and define the contents of data flows and data store, system builders use A) a data dictionary. B) process specifications diagrams. C) user documentation. D) data flow diagrams.

A

48) To show each level of a system's design, its relationship to other levels, and its place in the overall design structure, structured methodologies use A) structure charts. B) Gantt and PERT charts. C) process specifications. D) data flow diagrams.

C

49) In object-oriented development A) the class is used as the basic unit of systems analysis and design. B) an object is a collection of data that is acted on by external processes. C) processing logic resides within objects. D) a strict, step-by-step development process is essential.

B

50) In an object-oriented development framework for a university, how would the classes Degree, Mathematics, and Physics be related? A) Degree would be a sister class to Mathematics and Physics. B) Degree is a superclass to Mathematics and Physics. C) Mathematics and Physics would be ancestors to Degree. D) Degree would be a subclass to Mathematics and Physics.

C

51) Object-oriented modeling is based on the concepts of A) objects and relationships. B) classes and objects. C) class and inheritance. D) objects and inheritance.

C

52) Object-oriented development could potentially reduce the time and cost of writing software because A) object-oriented programming requires less training. B) iterative prototyping is not required. C) objects are reusable. D) a single user interface object can be used for the entire application.

D

53) CASE tools automate A) documentation. B) code generation. C) creating data dictionaries. D) all of the above.

D

54) The oldest method for building information systems is A) component-based development. B) prototyping. C) object-oriented development. D) the systems development lifecycle.

D

55) In the traditional systems development lifecycle, end users A) are important and ongoing members of the team from the original analysis phase through maintenance. B) are important only in the testing phases. C) have no input. D) are limited to providing information requirements and reviewing the technical staff's work.

A

56) In which type of systems building are the development stages organized so that tasks in one stage are completed before the tasks in the next stage begin? A) traditional B) prototyping C) RAD D) all of the above

B

57) As a technical project manager, you have decided to propose implementing a prototyping methodology for a small Web-based design project. What is the order of steps you will follow in this project? A) Develop the prototype; use the prototype; revise and enhance the prototype. B) Identify user requirements, develop the prototype, use the prototype, revise and enhance the prototype. C) Define the requirements, develop solutions, select the best prototype, and implement the prototype. D) Define the requirements, develop the prototype, revise and enhance the prototype.

D

58) You are an IT project manager for an advertising firm. The firm wishes to create an online tool that will be used to survey focus group reactions to products in development. The most important consideration for the firm is being able to offer the tool as soon as possible as a new corporate service. However, you know that many of the senior managers that are business owners of this project have difficulty in understanding technical or software development issues, and are likely to change their requirements during the course of development. What development method would be most successful for this project? A) RAD B) JAD C) end-user development D) prototyping

B

59) A systems building approach in which the system is developed as successive versions, each version reflecting requirements more accurately, is described to be A) end-user oriented. B) iterative. C) object-oriented. D) agile.

C

60) Which type of fourth-generation language tools are end users most likely to work with? A) report generators and query languages B) report generators and application generators C) PC software tools and query languages D) PC software tools and report generators

C

61) Which type of fourth-generation language tool contains preprogrammed modules that can be used to create entire applications? A) PC software tools B) report generators C) application generators D) application software packages

A

62) Fourth-generation tools cannot replace conventional development tools because they A) cannot handle large numbers of transactions or extensive procedural logic. B) are not designed to integrate with legacy systems. C) do not incorporate methods for documentation. D) do not incorporate methods for testing.

D

63) When systems are created rapidly, without a formal development methodology A) end users can take over the work of IT specialists. B) the organization quickly outgrows the new system. C) hardware, software, and quality standards are less important. D) testing and documentation may be inadequate

D

64) Which of the following is not a top priority in mobile application development? A) designing for multitouch B) saving resources C) limiting the use of keyboards D) designing for keyboard data entry

A

65) What is the primary driving factor in firms to select domestic outsourcing firms to build system solutions? A) to take advantage of technical skills the firm does not have B) to save labor costs C) to avoid change management issues D) all of the above

A

66) The process of creating workable information systems in a very short period of time is called A) RAD. B) JAD. C) prototyping. D) B and C.

B

67) Which type of systems development is characterized by significantly speeding up the design phase and the generation of information requirements and involving users at an intense level? A) RAD B) JAD C) prototyping D) end-user development

B

68) Groups of objects are assembled into software components for common functions, which can be combined into large-scale business applications, in which type of software development? A) object-oriented development B) component-based development C) structured methodologies D) RAD

A

69) ________ development focuses on rapid delivery of working software by breaking a large project into a series of small sub-projects that are completed in short periods of time using iteration and continuous feedback. A) Agile B) Rapid application C) Joint application D) Object-oriented

B

70) Compared to the use of proprietary components, Web services promise to be less expensive and less difficult to implement because of A) their ability to integrate seamlessly with legacy systems. B) the use of universal standards. C) the ubiquity of the Internet. D) the ability to reuse Web services components.


Set pelajaran terkait

NCIDQ Class 2 HW - Codes, Building Systems & Construction

View Set

Driver's Ed- Consumer Responsibility

View Set

Pluralistic Ignorance and Social Norms

View Set

Ch 22: Management of Patients with Upper Respiratory Tract Disorders

View Set

Wk 1 - Practice: Ch. 1, What Do We Mean by Leadership?

View Set