_____________ is the process of identifying which assets need to be managed and controlled. configuration control configuration status accounting configuration identification configuration auditing

configuration identification

An organization must choose between using Capability Maturity Model Integration (CMMI) or change management.

false

Change management and configuration management are two very different processes.

false

Change management is only needed in the development and testing phases of the systems life cycle.

false

Change management is the process of changing the middle managers in a company during a merger.

false

Change management makes localization efforts more complex.

false

All access to systems, software, and data should be assigned using what principle? A. Least privilege B. Role-based access C. Minimum use D. Activity-based access

least privilege

Configuration status accounting consists of the procedures for tracking and maintaining data relative to each configuration item in the baseline.

true

Network and system administrators use change management to ensure configurations consistently meet security standards.

true

Configuration _______________ is the process of verifying that the configuration items are built and maintained according to the requirements, standards, or contractual agreements. identification control auditing status accounting

auditing

________________ serves as a foundation for comparison or measurement. A. Configuration identification B. Configuration status accounting C. Baseline D. Configuration items

baseline

_______________ refers to a standard methodology for performing and recording changes during software development and system operation.

change management

Whenever a modified program is moved to the production source-code library, the executable version is moved to the production system. This is an example of which of the following? A. Authenticode B. Code integrity C. Separation of duties D. Output code variation

code integrity

_______________ is the process of controlling changes to items that have been baselined. configuration items configuration control configuration status accounting baseline

configuration control

Which of the following is the first step in change management? A. Configuration control B. Configuration status accounting C. Configuration identification D. Configuration audit

configuration identification

Despite all the benefits from separation of duties, the biggest disadvantage is that the people who know the software best (the developers, designers, and testers) are not the ones that install and administer the software.

false

_______________ is an important means by which errors and fraudulent or malicious acts can be discouraged and prevented.

segregation of duties

What is the key concept in change management?

separation of duties

A(n) _________ is used by the change control board to track changes. A. Situation process report B. Software problem report C. Segregated personnel responsibilities D. System progress report

system progress report

A(n) ______________ is used to track changes through the change control board. A. Situation process report B. Software problem report C. Segregated personnel responsibilities D. System progress report

system progress report

A configuration item is an asset that needs to be controlled or managed.

true

Change control prevents inadvertent overwriting of critical reference data.

true

What is configuration control? A. Ensures that configuration items are built and maintained according to the requirements, standards, or contractual agreements B. Ensures that only approved changes to a baseline are allowed to be implemented C. Ensures all changes made separate from the baseline are well documented and controlled D. Identifies which assets need to be controlled.

B

What is configuration auditing? A. Ensures that configuration items are built and maintained according to the requirements, standards, or contractual agreements B. Ensures that only approved changes to a baseline can be implemented C. Ensures all changes made separate from the baseline are well documented and controlled D. Identifies which assets need to be controlled

A

Which of the following is true about change control boards? A. They are made up of non-administrative staff to prevent bias in decision making. B. They should meet annually to revise the change control executive plan. C. They should facilitate adequate change management oversight and better coordination between projects. D. They are only necessary in extremely large corporations that wish to maintain standards across multinational divisions.

C

Change management can be applied to every type of software development EXCEPT: A. Security patches B. Source code C. Web pages D. Change management should be applied to all types of software development.

D


Set pelajaran terkait

MBL103 Chapter 12 Workers Compensation & Disability Automotive Insurance

View Set

CITI Privacy and Confidentiality SBE

View Set

Chapter 1: Modern Project Management

View Set